Series II:
Building Project Files, 1938-2002,
(bulk
1974-1998)
84.3 cubic feet including 138
photographs87 boxes and 1 map
folder
The building project files document the construction, renovation, and
maintenance of various OSU buildings and include building specifications,
contracts, correspondence, project manuals, progress reports, contract
insurance reports, agreements with architects and engineers, contract
proposals, and statements of qualifications. Structural repair and
maintenance projects are also described in this series and cover
insulation installation, re-roofing, and HVAC system management.
Architectural drawings and plans have been separated to Series I. Records
documenting the selection and installation of artwork funded by the
Percent for Art public art program are also included in this series. The
series includes photographs (indicated below). This series includes
records pertaining to capital construction projects.
|
| |
| |
Container(s)
|
Description
|
| |
|
|
Parker Stadium Additions, 1966-1969
|
| |
|
|
Mechanical Engineering
Building, 1966-1968
|
| |
|
|
Earth Sciences Addition, 1964-1977
|
| |
|
|
Oceanography Building-First
Addition, 1968
|
| |
|
|
Kidder Hall, 1964
|
| |
|
|
Oceanography Building-First
Addition, 1968
|
| |
|
|
Kerr Library-First Addition, 1964-1973
|
| |
|
|
Kerr Library-First Addition, 1969-1973
|
| |
|
|
Horse Center/Arena, 1966-1975
|
| |
|
|
Animal Isolation Facility, 1968-1978
|
| |
|
|
Dixon Recreation Center, 1971-1976
|
| |
|
|
Covell Hall-KOAC, 1976-1978
|
| |
|
|
Bicycle Rack Covers, 1976
|
| |
|
|
Energy Conservation-Instrumentation and
Monitoring at OSU, 1977
|
| |
|
|
Oceanography Building-First
Addition, 1968
|
| |
|
|
Parker Stadium Covering, 1976
|
| |
|
|
Animal Care Facilities, 1973-1976
|
| |
|
|
Dearborn Hall Remodel, 1974-1975
|
| |
|
|
McAlexander Fieldhouse-Technical
Information, 1969-1970
|
| |
|
|
Coliseum Substation and Weatherford
Switching Station, 1970-1971
|
| |
|
|
Cordley Hall Ventilation
Improvements, 1978-1979
|
| |
|
|
Electrical Distribution
System, 1972-1977
|
| |
|
|
Dixon Recreation Center, 1978-1979
|
| |
|
|
Spring Sports Complex, 1972-1977
|
| |
|
|
Snell Hall, 1976
|
| |
|
|
Memorial Union East Directory,
undated
|
| |
|
|
Student Union Facilities, 1976-1978
|
| |
|
|
Student Union Facilities (includes
Memorial Union remodel), 1976-1981
|
| |
|
|
Gilbert Hall Addition, 1978-1981
|
| |
|
|
Gilbert Hall Addition and
Renovation, 1978-1981
|
| |
Includes photographs in Budget Summary and Construction Summary
folders.
|
| |
|
|
Safety Deficiencies Phases I-III (and
corrections), 1975-1980
|
| |
Agriculture Hall, Batcheller Hall, Bexell Hall, Cordley Hall, Covell
Hall, Dearborn Hall, Dryden Hall, Farm Crops Building, Forest Research
Lab, Gilbert Hall, Gill Coliseum, Kidder Hall, Langton Hall, Oceanography
Building, Rogers Hall, Shepard Hall, Vocational Shops, Weniger Hall,
Wiegand Hall, Wilkinson Hall, and Women’s Building
|
| |
|
|
Phase I, Fee Analysis (1
sheet), undated
|
| |
|
|
Safety Deficiencies Phases
I-II, 1978-1979
|
| |
Nash Hall, and Dryden Hall
|
| |
|
|
Physical Plant Warehouse Building #2
, 1979
|
| |
|
|
Plageman Infirmary , 1978
|
| |
|
|
Forest Research Lab, 1979
|
| |
|
|
Re-Roofing Projects, 1979-1980
|
| |
Agriculture Utilities, Gill Coliseum, Merryfield Annex, McAlexander
Field House, Langton Hall, Pharmacy Building, Plageman Infirmary, Covell
Hall, Weniger Hall, Withycombe Hall, and Orchard Street Nursery
|
| |
|
|
Gill Coliseum , 1980
|
| |
|
|
Tennis Court Resurfacing, 1976-1978
|
| |
|
|
Tennis Court Resurfacing, 1976-1978
|
| |
|
|
Residence Halls Covered Walkway
Painting, 1976-1978
|
| |
Callahan Hall, McNary Hall, West Hall, Buxton Hall, and Poling Hall
|
| |
|
|
Sidewalk Repairs and Wheelchair
Ramps, 1979-1980
|
| |
|
|
Street Lighting Improvements, 1979-1980
|
| |
|
|
Street Overlays, 1979-1980
|
| |
|
|
Veterinary Barn, 1979
|
| |
|
|
Vocational Shops Storage
Building, 1980
|
| |
|
|
Exterior Painting, 1979
|
| |
Waldo Hall and Agricultural Utility Building
|
| |
|
|
Weniger Hall, 1980
|
| |
|
|
West Greenhouse, 1980
|
| |
|
|
Kitchen Modifications, 1980
|
| |
West Hall and Weatherford Hall
|
| |
|
|
Weatherford Hall, 1981
|
| |
|
|
Re-Roofing Projects, 1978
|
| |
Withycombe Hall and Merryfield Hall
|
| |
|
|
Withycombe Hall, 1975-1979
|
| |
|
|
Women’s Softball Field, 1979
|
| |
|
|
Veterinary Hospital, 1980-1982
|
| |
|
|
Veterinary Medicine Teaching Hospital
(Magruder Hall), 1979-1983
|
| |
Includes photographs in Roof-VMTH folder
|
| |
|
|
Veterinary Medicine Teaching
Hospital, 1979-1980
|
| |
|
|
Crop Science Building, 1980
|
| |
|
|
Memorial Union, 1979
|
| |
|
|
Education Hall, 1976-1978
|
| |
|
|
Roofing Projects, 1978
|
| |
Withycombe Hall, Social Science Building, Heating Plant, and Merryfield
Hall
|
| |
|
|
Adair Village Library
Storage, 1978-1980
|
| |
|
|
Exterior Painting, 1977-1979
|
| |
Apperson Hall, Batcheller Hall, Covell Hall, Dearborn Hall, Women’s
Building, Moreland Hall, and Langton Hall
|
| |
|
|
Ionization Detectors, 1979
|
| |
Avery Lodge and Dixon Lodge
|
| |
|
|
Bexell Halll, 1979
|
| |
|
|
Cordley Hall, 1979
|
| |
|
|
Dawes House, 1977-1978
|
| |
|
|
East Greenhouse, 1979
|
| |
|
|
Exterior Painting, 1980
|
| |
Education Hall, Kerr Library Walkway, Nash Hall, Peavy Hall, and
Pharmacy Building
|
| |
|
|
Gill Coliseum WIA Remodel, 1980
|
| |
|
|
Housing Warehouse Lot
Expansion, 1979
|
| |
|
|
Marine Science Center, 1979
|
| |
|
|
Infirmary New Hot Water
Piping, 1980
|
| |
|
|
Milam Hall Sanitary Sewer
Repair, 1979
|
| |
|
|
Oceanography Addition, 1979-1980
|
| |
|
|
Parker Stadium Structural Steel &
Handrails Painting, 1995-1996
|
| |
|
|
Maintenance, 1984-1985
|
| |
Administration Building, Apperson Hall, Bexell Hall, Buxton Hall,
Campus, Cauthorn Hall, Ch2M Building, Coed Cottage, Computer Science,
Cordley Hall, Covell Hall, Crop Science, Dairy Center, Dearborn Hall,
Dryden Hall, East Greenhouse, Education Hall, Elementary Education room
220C, Fairbanks, Freight Office, Gilbert Hall, Gill Coliseum, Gilmore
Hall, Heating Plant, Industrial Building, Information Booth, Kidder Hall,
Lab Animal Resource Center, Langton Hall, Library, Magruder Hall,
McAlexander Fieldhouse, Memorial Union, Merryfield Hall, Milam Hall, Milne
Computer Center, Moreland Hall, Nash Hall, Naval Armory, Ocean II, OSU
Credit Union, Outdoor Directory Near Bookstore, Park Terrace, PE Laundry,
Peavy Hall, Pharmacy Building, Plageman Hall, President’s Residence,
Radiation Center, Snell Hall, Steam Tunnel, Stewart Center, Student
Health, Tunnel Mall in Jefferson, Vocational Shops, Waldo Hall, Weniger
Hall, West Greenhouse, Wilkinson Hall, Wilson Hall, Withycombe Hall, and
Women’s Building
|
| |
|
|
Weniger Hall, 1984-1985
|
| |
|
|
Langton Hall, 1985
|
| |
|
|
Marine Science Center, 1976-1977
|
| |
|
|
Marine Science Center
Library, 1974-1980
|
| |
|
|
Marine Science Center East Parking
Lot, 1977
|
| |
|
|
Cultural and Conference
Center, 1979-1982
|
| |
|
|
Veterinary Hospital, 1979-1980
|
| |
|
|
Gilbert Hall Addition and
Renovation, 1979-1983
|
| |
|
|
Gill Coliseum, 1984
|
| |
|
|
Small Contract Bids, 1972-1973
|
| |
Administration Services Building, Ag Chem Department, Animal Science
Shed, Arnold Way Sidewalk, Dryden Hall, Student Health Services, Weniger
Hall, Women’s Building, and Wyckoff Memorial Volleyball Court
|
| |
|
|
Campus Outdoor Lighting, 1971-1980
|
| |
|
|
National Forage Seed Research
Center, 1981-1985
|
| |
|
|
Stadium Avenue Revisions Phase
I, 1981-1982
|
| |
|
|
Parking Improvements, 1980-1981
|
| |
|
|
Newport Marine Science Center Paving
Project, 1980
|
| |
|
|
Oceanography Annex
Remodeling, 1981
|
| |
|
|
Parker Stadium TV Crew
Shelter, 1979-1980
|
| |
|
|
Parker Stadium Football
Facilities, 1979-1980
|
| |
|
|
Martel House, 1977-1980
|
| |
|
|
Parker Stadium Improvements, 1967-1969
|
| |
|
|
Tennis Courts, 1976
|
| |
|
|
Utility Tunnel and Heating Plant
Insulation, 1982
|
| |
|
|
Veterinary Diagnostic
Laboratory, 1981
|
| |
|
|
Water Study, 1969-1979
|
| |
|
|
Weatherford Hall
Modernization, 1981
|
| |
|
|
Weniger Hall Air
Conditioning, 1981-1982
|
| |
|
|
West Greenhouse and Motor Pool Annex
Re-Roofing, 1981
|
| |
|
|
Withycombe Hall Solar and Atmospheric
Radiation Laboratory, 1980-1981
|
| |
|
|
Women’s Building Remodel, 1981
|
| |
|
|
Withycombe Hall, 1975
|
| |
|
|
Spring Sports Complex, 1972-1976
|
| |
|
|
Marine Science Center Dormitory
Addition, 1974-1975
|
| |
|
|
Kidder Hall Study, 1979
|
| |
|
|
Administration Building Mechanical
System Study, 1981
|
| |
|
|
Cordley Hall Refrigeration System
Revisions, 1976-1977
|
| |
|
|
Primary Power Distribution System Short
Circuit Study, 1974
|
| |
|
|
Electrical Distribution Facilities
Study, 1971
|
| |
|
|
Electrical Engineer’s Services: CH2M
Hill, 1971-1976
|
| |
|
|
Electrical Distribution System:
Engineering Payments, Engineering and Design Associates, , 1974-1980
|
| |
|
|
Construction Reports, 1981
|
| |
|
|
Motor Pool Re-roofing, 1981
|
| |
|
| |
|
|
Motor Pool Annex Re-roof: Jack Largent
Company, 1981
|
| |
|
|
Gill Coliseum: New Maple
Floor-Correspondence, 1972-1973
|
| |
|
|
Wiegand Hall: Re-roofing, 1975-1978
|
| |
|
|
Agriculture Hall: Re-roofing, 1981
|
| |
|
|
Gilbert Hall Addition, 1977-1981
|
| |
|
|
Memorial Union Phase III, 1978-1982
|
| |
|
|
Fire Alarm Study: Prepared for OSU
Physical Plant Dept, 1971
|
| |
|
|
Campus Fire Alarm System:
OSU, 1974
|
| |
|
|
Marine Science Center Aquaculture
Lab, 1977-1982
|
| |
|
|
Marine Science Center Aquaculture
Lab, 1978-1981
|
| |
|
|
Marine Science Center Research Support
Facility, 1979-1982
|
| |
|
|
Administrative Services Building Room B
210-E Contract, 1980
|
| |
|
|
Administrative Services A/B HVAC
Study-Keith Kruchek, 1981
|
| |
|
|
Andrews Experimental Forest, 1980-1981
|
| |
|
|
Campus Outdoor Lighting System
Improvements, 1975-1976
|
| |
|
|
Cauthorn Hall Lounge Remodel
Contract, 1979
|
| |
|
|
Cordley Hall Ammonia Replacement
Program, 1979
|
| |
|
|
Cordley Hall Alterations: Siemens
Electron Microscope, 1980
|
| |
|
|
Cordley Hall Third Floor Cold Storage
Renovation, 1981
|
| |
|
|
Quad Floor Lounge Partitions Housing:
Architect, 1978-1979
|
| |
|
|
Data Services Center: Administrative
Building Air Conditioning, 1980
|
| |
|
|
Data Services Center: Heat
Balancing-Keith Kruchek, 1979-1980
|
| |
|
|
Dearborn Hall Remodel Rooms 202 Through
206 and 301 Contracts, 1981-1982
|
| |
|
|
Dryden Hall Remodel Rooms 204 and 205
Contract, 1979-1980
|
| |
|
|
Earth Sciences (Wilkinson Hall)
Roof, 1973-1977
|
| |
|
|
Education Hall Stair
Covering, 1981
|
| |
|
|
Parking Lots, 1978
|
| |
Finley Hall and McAlexander Fieldhouse
|
| |
|
|
Precast Concrete Joint
Re-caulking, 1975
|
| |
Finley Hall and Bloss Hall
|
| |
|
|
Gill Coliseum Football Locker Room
Remodel, 1980
|
| |
|
|
Primary Electrical Distribution
System, 1969-1975
|
| |
Oceanography Building, Bioscience Building, Heating Plant, Forestry
Building, Administration Building, Bloss Hall, Arnold Hall, Library,
Chemistry Building, Agricultural Sciences Building, Married Student
Housing, Intramural Recreation, Student Health Services Addition,
Weatherford Hall, Art Center, Batcheller Hall, Covell Hall, Physical
Plant, and Civil Engineering Building
|
| |
|
|
Forest Research Laboratory, 1980-1981
|
| |
|
|
Gilbert Hall Piping
Modifications, 1980-1981
|
| |
|
|
Gill Coliseum Remodel, 1979-1980
|
| |
|
|
Handrail Modifications, 1981-1982
|
| |
Education Hall, Extension Hall, Gilmore Hall, Graf Hall, Merryfield
Hall. Pharmacy Hall, and Social Science Building
|
| |
|
|
Gill Coliseum Maple Flooring, 1971-1972
|
| |
|
|
Heating Plant Boiler
Re-Tubing, 1981
|
| |
|
|
Heating Plant Replace
Breeching, 1981
|
| |
|
|
Industrial Building Printing Plant
Remodel, 1980
|
| |
|
|
Kerr Library Lighting Study, 1981
|
| |
|
|
Kidder Hall Heating and Cooling System
Analysis, 11979-1980
|
| |
|
|
Langton Hall Swimming Pool Drainage
Modifications, 1982
|
| |
|
|
Marine Science Center Fire Detection
System, 1982
|
| |
|
|
Marine Science Center Freeze Protection
Building, 1980-1981
|
| |
|
|
Marine Science Center Paving
Project, 1980
|
| |
|
|
McAlexander Fieldhouse
Remodel, 1980
|
| |
|
|
Magnetic Water Conditioners, 1980
|
| |
McNary Hall, Wilson Hall, and Callahan Hall
|
| |
|
|
Martel House Remodel, 1980
|
| |
|
|
McNary Hall Cafeteria Chiller
Replacement, 1980-1981
|
| |
|
|
McNary Dining Hall Heating and Air
Conditioning System Study, 1979-1981
|
| |
|
|
Median Improvements on 26th Street
(between Western Avenue and Washington Way), 1981
|
| |
|
|
Milne Computer Center Halon Fire
Suppression System, 1981
|
| |
|
|
Moreland Hall Handrail
Modifications, 1981
|
| |
|
|
Motor Pool Re-Roofing, 1981
|
| |
|
|
Construction Progress Report, 1982-1983
|
| |
Memorial Union Remodel, Handicapped Accessibility, Washington Way
Tennis Court Renovation, Gilbert Hall Renovation, Crop Science Building,
Newport Research Support Facility, and Veterinary Medical Teaching
Hospital
|
| |
|
|
Re-Roofing Projects, 1982
|
| |
Heating Plant, Agriculture Hall, Extension Hall, and Women’s Study
Center
|
| |
|
|
Madison Avenue Landscaping (between 9th
and 11th Streets), 1983
|
| |
|
|
Marine Science Center Covered
Walkway, 11980-1984
|
| |
|
|
Weniger Hall HVAC Systems, 1975-1980
|
| |
|
|
Wilkinson Hall Addition, 1979
|
| |
|
|
Wall Partitions, 1979
|
| |
Cauthorn Hall and Hawley Hall
|
| |
|
|
Parking Lot (26th and Parker
Stadium), 1985
|
| |
|
|
Spring Sports Complex, 1980-1981
|
| |
|
|
Waldo Hall Remodel, 1979
|
| |
|
|
Extension Annex Addition and
Alterations, 1982
|
| |
|
|
Extension Hall Parking Lot
Overlay, 1982
|
| |
|
|
Extension Hall Parking Lot
Overlay, 1982
|
| |
|
|
Farm Crops Building Access
Flooring, 1982
|
| |
|
|
Heating Plant Oxygen
Analyzers, 1983
|
| |
|
|
Arnold Dining Hall Folding
Partition, 1982
|
| |
|
|
26th Street Island
Improvement, 1982-1983
|
| |
|
|
Dorm Services Building
Addition, 1982
|
| |
|
|
Gilbert Hall Addition and
Renovation, 1979-1982
|
| |
|
|
Heating Plant Oxygen
Analyzers, 1983
|
| |
|
|
Marine Science Center Backflow
Prevention, 1982
|
| |
|
|
Newport Research Support
Facility, 1981-1982
|
| |
|
|
Memorial Union Re-Roofing, 1982
|
| |
|
|
Oceanography Biological Curation
Building, 1982
|
| |
|
|
Steam Condensate Return Pipe
Insulation, 1982-1983
|
| |
|
|
Weatherford Hall Bathroom
Modernization, 1982
|
| |
|
|
Gilbert Hall Replacement
Windows, 1983
|
| |
|
|
Gilbert Renovation, 1980-1982
|
| |
|
|
Gilbert Hall Addition and
Renovation, 1977-1982
|
| |
|
|
Gilbert Hall Remodel, 1980-1983
|
| |
|
|
Washington Way Tennis Court
Renovation, 1976-1984
|
| |
|
|
Memorial Union Remodel Phase
IV, 1981-1984
|
| |
|
|
Memorial Union Remodel Phase
IV, 1982-1983
|
| |
|
|
Specifications - Removal of
Architectural Barriers to the Handicapped in various buildings at
OSU, 1981
|
| |
|
|
OSU Foundation Cultural and Conference
Center (Changes in the Contract Documents), 1980
|
| |
|
|
Intramural/Recreation Building (Dixon
Recreation Center Maintenance), 1973-75
|
| |
|
|
Gilbert Hall Remodel, 1979-1983
|
| |
|
|
Arnold Dining Hall Folding
Partition, 1982
|
| |
|
|
Oceanography Biological Curation
Building, 1982
|
| |
|
|
Bio-Mass Gasification
Project, 1979-80
|
| |
|
|
Construction Insurance, 1976-78
|
| |
|
|
Cordley Hall Piping
Modifications, 1983
|
| |
|
|
Dorm Services Building
Addition, 1982-1983
|
| |
|
|
Extension Annex Addition and
Alterations, 1982-1983
|
| |
|
|
Dryden Hall Fire Restoration, 1983
|
| |
|
|
Farm Crops Building Access
Flooring, 1982
|
| |
|
|
Precast Joint Caulking, 1983
|
| |
Finley Hall and Bloss Hall
|
| |
|
|
Proposed “Great Hall”, 1976
|
| |
|
|
Insulation of Attics, 1983
|
| |
Benton Hall, Bexell Hall, Covell Hall, Moreland Hall, Study Center,
Waldo Hall, Sheppard Hall, Physical Plant, Milam Hall, Apperson Hall, and
Extension Hall
|
| |
|
|
Magruder Hall Computer Room
Installation, 1983
|
| |
|
|
Marine Science Center Backflow
Prevention, 1982
|
| |
|
|
Marine Science Center Weather
Station, 1983
|
| |
|
|
Mechanical Room Steam Pipe
Insulation, 1983
|
| |
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell
Hall, Chemical Engineering Building, Cordley Hall, Cordley Addition,
Covell Hall, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops
Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall,
Industrial Building Manhole, Vocational Shops, Kerr Hall, Kidder Hall,
Laboratory Animal Resources Building, Langton Hall, Magruder Hall, Milam
Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Laboratory,
Shepard Hall, Plageman Infirmary, Waldo Hall, Wiegand Hall, Wythecombe
Hall Boiler Room, Women’s Building, and Women’s Study Center
|
| |
|
|
Major Construction Miscellaneous
Correspondence, 1971-1973
|
| |
|
|
Minor Construction Miscellaneous
Correspondence, 1971-1980
|
| |
|
|
Performing Arts Center, 1976
|
| |
|
|
Re-Roofing Projects, 1983
|
| |
Oceanography Building, Clark Meat Lab, McAlexander Fieldhouse, Langton
Hall, Pharmacy Building, Erma Plageman Infirmary, Covell Hall, Weniger
Hall, and Orchard Street Nursery
|
| |
|
|
Marine Science Center Parking
Lot, 1983
|
| |
|
|
Extension Hall Parking Lot
Overlay, 1982
|
| |
|
|
Weniger Hall Exterior Door
Modification, 1983
|
| |
|
|
Steam Condensate Return Pipe Insulation
(Utility Tunnel), 1983
|
| |
|
|
McNary Hall Exterior Finish
Replacement, 1983
|
| |
|
|
Heating Plant Emergency Generator
Modifications, 1983
|
| |
|
|
Crop Science Building Fire
Protection, 1980-1985
|
| |
|
|
Crop Science Building, 1978-1983
|
| |
|
|
Crop Science Building, 1978-1984
|
| |
|
|
Crop Science Building Fire and Life
Safety Review, 1969-1980
|
| |
|
|
Oceanography Curation Building
Preparation Room, 1983-1984
|
| |
|
|
Wave Tank Facility Covering
Building, 1982-1983
|
| |
|
|
Re-Roofing Projects, 1983-1984
|
| |
Oceanography Building and Clark Meat Lab
|
| |
|
|
Administrative Services Building Data
Services Air Conditioning Revision, 1983
|
| |
|
|
Mechanical Room Steam Pipe
Insulation, 1982
|
| |
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell
Hall, Chemical Engineering Building, Cordley Hall, Covell Hall, Cordley
Addition, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building,
Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial
Building North Manhole, Vocational Shops North and South Manhole, Kerr
Library, Kidder Hall, Lab Animal Resources Building, Langton Hall,
Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash
Hall, Seed Lab, Shepard Hall, Plageman Infirmary North and South Manhole,
Waldo Hall, Wiegand Hall, Withycombe Hall Boiler Room, Women’s Building,
and Women’s Study Center
|
| |
|
|
Cordley Hall Piping
Modifications, 1983
|
| |
|
|
Dearborn Hall Access
Flooring, 1983
|
| |
|
|
East Greenhouse Heating
Modifications, 1983
|
| |
|
|
Precast Slab Joint Caulking, 1983
|
| |
Finley Hall and Bloss Hall
|
| |
|
|
Insulating Attics, 1983
|
| |
Apperson Hall, Batcheller Hall, Benton Hall, Bexell Hall, Covell Hall,
Dryden Hall, Extension Hall, Fairbanks Hall, Langton Hall, McAlexander
Fieldhouse, Milam Hall, Moreland Hall, Physical Plant Office, Shepard
Hall, Waldo Hall, Wiegand Hall, and Women’s Study Center
|
| |
|
|
Attic Insulation, 1981-1983
|
| |
University Steam Plant Complex, McAlexander Fieldhouse, Batcheller
Hall, Milam Hall, Langton Hall, Wiegand Hall, Covell Hall, Apperson Hall,
Extension Hall, Waldo Hall, Moreland Hall, Bexell Hall, Fairbanks Hall,
Shepard Hall, Benton Hall, Dryden Hall, Women’s Study Center, and Physical
Plant Office
|
| |
|
|
Diving Board Handrails, 1982-1984
|
| |
Langton Hall and Women’s Building
|
| |
|
|
Magruder Hall Computer
Installation, 1983
|
| |
|
|
Marine Science Center Parking
Lot, 1983
|
| |
|
|
Marine Science Center Weather
Station, 1983
|
| |
|
|
Marine Science Center Dock
Renovations, 1983-1984
|
| |
|
|
McNary Hall Exterior Finish
Replacement, 1983-1984
|
| |
|
|
Milne Computer Center Air Conditioning
Modifications, 1983-1984
|
| |
|
|
Milne Computer Center Room 210
Remodel, 1983-1984
|
| |
|
|
Oceanography Biological Curation
Building Preparation Room, 1983-1984
|
| |
|
|
Orchard Avenue Parking Lot, 1983
|
| |
|
|
Weatherford Hall Hot Water Tank
Replacement, 1983
|
| |
|
|
Weniger Hall Water Purification
System, 1983-1984
|
| |
|
|
Test-holes and Proposed
Water-well, 1974
|
| |
|
|
Dearborn Hall Room 312 Remodel Phases
I-II, 1984-1986
|
| |
|
|
Gill Coliseum Project I, 1984-1987
|
| |
|
|
Gill Coliseum Projects I-IV, 1984-1985
|
| |
|
|
Gill Coliseum Portable Stage, 1985
|
| |
|
|
Attic Insulation, 1984
|
| |
Kidder Hall, Gilmore Hall, and Women’s Building
|
| |
|
|
Madison Avenue Reconstruction (S.W.
Sixth Street to S.W. Eleventh Street), 1981
|
| |
|
|
Marine Science Center Covered
Walkway, 1984
|
| |
|
|
Steam and Condensate Pipe
Insulation, 1984
|
| |
Boiler Plant, Gilbert Hall, Gill Coliseum, Plumbing Shop, Carpenter
Shop, Carpenters
|
| |
|
|
Carpenters, 1984-1987
|
| |
Lunch Room, and Strand Agriculture Hall
|
| |
|
|
McNary Hall Exterior Finish Replacement
Phase II, 1984
|
| |
|
|
Re-Roofing, 1984-1985
|
| |
McAlexander Fieldhouse, Nash Hall, Memorial Union Building, Women’s
Building, and Navy ROTC Building
|
| |
|
|
Nash Hall Fire Restoration, 1983-84
|
| |
|
|
Pharmacy Building Heat Recovery
System, 1984
|
| |
|
|
East Greenhouse Water Line
Replacement, 1984
|
| |
|
|
Parker Stadium Artificial Turf
Replacement, 1984
|
| |
|
|
Women’s Building and Langton Hall
Remodel, 1984-85
|
| |
|
|
Snell Hall Renovation, 1983
|
| |
|
|
Weniger Hall Remodel, 1984-85
|
| |
|
|
West Range Greenhouse Plumbing and
Electrical Modifications, 1984
|
| |
|
|
Weniger Hall Remodel, 1984-85
|
| |
|
|
Veterinary Research Laboratory
Remodel, 1984
|
| |
|
|
Snell Hall Remodel, 1984-85
|
| |
|
|
Weniger Hall Remodel, 1984
|
| |
|
|
Gill Coliseum Refinish Maple
Floor, 1985
|
| |
|
|
Waldo Hall Remodel, 1985
|
| |
|
|
Dixon Recreation Center
Re-roof, 1985
|
| |
|
|
Re-roofing, 1984
|
| |
College Inn, Food Service Warehouse, and Sackett Hall
|
| |
|
|
Gill Coliseum Refinish Maple
Floor, 1985
|
| |
|
|
Utility Data for Langton Hall and
Women’s Building, 1984
|
| |
|
|
Oceanography II Remodel, 1985
|
| |
|
|
Sanitary Sewer Project, 1983
|
| |
|
|
Waterline Replacement, 1984-85
|
| |
Milam Hall, Nash Hall, and Withycombe Hall
|
| |
|
|
Women’s Building Remodel, 1984-85
|
| |
|
|
Veterinary Medicine Animal Isolation
Laboratory Septic Tank Drain Field, 1984
|
| |
|
|
Kidder Hall Re-roofing, 1985-86
|
| |
|
|
Lab Animal Resources Exterior Wall
Insulation, 1983-86
|
| |
|
|
Off Duty Service Requests, 1984-87
|
| |
|
|
Police and Security Department/Traffic
Office Report of Activities, 1983-1986
|
| |
|
|
Energy Conservation Measures, 1984-1986
|
| |
Langton Hall and Women’s Building
|
| |
|
|
Re-Roofing, 1984-1987
|
| |
Nash Hall and Navy ROTC Building
|
| |
|
|
Oceanography Building Remodel
I-II, 1984-1986
|
| |
|
|
Snell Hall Third Floor
Remodel, 1985-1986
|
| |
|
|
Parking Lot Improvements and
Repair, 1985-1986
|
| |
|
|
Rogers Hall Insulate Heating and Chilled
Water Piping, 1986
|
| |
|
|
Weniger Hall Re-Roofing, 1987
|
| |
|
|
Weniger Hall Acid Resistant Drain
Piping, 1984-1986
|
| |
|
|
OSU Horse Center Farrier School
Manchester Arena, 1984-1986
|
| |
|
|
Kidder Hall Re-roofing, 11985-1987
|
| |
|
|
Langton Hall Roofing, 1986-1987
|
| |
|
|
Gilbert Hall Renovation, 1980-1986
|
| |
|
|
Crew Building, 1986
|
| |
|
|
Benton Hall Re-roofing and Exterior
Repairs, 1986
|
| |
|
|
Batcheller Hall Electrical and Computer
Alterations, 1986
|
| |
|
|
Heating Plant Economizer
Installation, 1986-1987
|
| |
|
|
Snell Hall Third Floor
Remodel, 1985-1986
|
| |
|
|
Women’s Building Re-roof, 1986
|
| |
|
|
Snell Hall Re-roof, 1986-1987
|
| |
|
|
National Forage Seed Production Research
Center, 1983-1986
|
| |
|
|
Water Line Replacement, 1984
|
| |
Milam Hall, Withycombe Hall, Nash Hall, and Rogers Hall
|
| |
|
|
OSU Golf Course, 1978-1980
|
| |
|
|
Poling and Hawley Halls Lounge
Remodel, 1985-1986
|
| |
|
|
625 SW 16th Project, 1986-1987
|
| |
|
|
West Greenhouse Parking Lot
Improvements, 1987
|
| |
|
|
Parking Lot Repairs, 1986-1987
|
| |
|
|
Snell Hall Re-roofing
Project, 1986
|
| |
|
|
Soderstrom Architects and Roofing
Consultants Correspondence, 1983-1986
|
| |
Involves majority of campus buildings
|
| |
|
|
Floor Refinishing, 1986-1988
|
| |
Langton Hall and Women’s Building
|
| |
|
|
Re-roofing Project, 1987
|
| |
Callahan Hall, McNary Cafeteria, and West International House
|
| |
|
|
Electrical and Computer Engineering
Building Alterations for Handicapped, 1986
|
| |
|
|
Physical Plant Department Handicapped
Access, 1986-1987
|
| |
|
|
Graf Hall Alterations, 1986
|
| |
|
|
ECE Building and Graf Hall Related
Alternations, 1986
|
| |
|
|
Apperson Hall and Merryfield Hall
Alterations, 1986
|
| |
|
|
ECE Building, Apperson, and Merryfield
Hall Alterations, 1986-1987
|
| |
|
|
Kidder Hall Re-roofing, 1986-1987
|
| |
|
|
Memorial Union Storm Sewer, 1987
|
| |
|
|
Oceanography Building (Room 424)
Remodel, 1986-1988
|
| |
|
|
Parking Lot Improvements, 1987-1988
|
| |
|
|
Pole Building West of Magruder
Hall, 1986-1987
|
| |
|
|
Women’s Building Re-roofing, 1986-1987
|
| |
|
|
Weniger Hall Re-roofing, 1987-1988
|
| |
|
|
Electrical and Mechanical Consulting
Services, 1982-1987
|
| |
|
|
Asbestos Removal, 1986-1987
|
| |
Callahan Hall, McNary Cafeteria, and West International House
|
| |
|
|
Weatherford Hall Renovation, 1987
|
| |
|
|
Restoration, Re-roofing, and
Repairs, 1986-1988
|
| |
Batcheller Hall and Benton Hall
|
| |
|
|
Roof Repairs, 1987
|
| |
Peavy Hall and Langton Hall
|
| |
|
|
Clark Meat Lab Sanitary
Sewer, 1986-1988
|
| |
|
|
Cordley Hall Re-roofing, 1987
|
| |
|
|
Dixon Recreation Center
Re-roofing, 1988-1989
|
| |
|
|
Dixon Recreation Center Weight Room
Floor Addition, 1987-1988
|
| |
|
|
Physical Plant Communications Conduit
Installation, 1988
|
| |
|
|
Computer Science Building
Alterations, 1986-1987
|
| |
|
|
Physical Plant Shops
Alterations, 1986-1987
|
| |
|
|
Computer Science Building Artwork
Installation, 1987-1988
|
| |
|
|
Hatfield Marine Science Center Seawater
System Investigation and Repair, 1982-1988
|
| |
|
|
Hatfield Marine Science Center Proposed
Laboratory and Library Addition, 1986-1988
|
| |
|
|
Hinsdale Wave Research Lab, 1986-1988
|
| |
|
|
Horse Barn and Manchester Arena
Re-roofing, 1987-1988
|
| |
|
|
Langton Hall Re-roofing, 1987-1988
|
| |
|
|
Langton Hall Pool Roof
Restoration, 1987-1988
|
| |
|
| |
|
|
McNary Hall Dining
Modifications, 1988
|
| |
|
|
Memorial Union Ventilation System
Improvements, 1987-1988
|
| |
|
|
Milam Hall Re-roofing, 1987-1988
|
| |
|
|
Irrigation System for 26th and Orchard
Street Parking Lot, 1986-1987
|
| |
|
|
Peavy Hall (Room 254)
Modifications, 1987-1988
|
| |
|
|
Target Range Re-roofing, 1987
|
| |
|
|
Radiation Center and Campus Lights
Energy Conservation Project, 1988
|
| |
|
|
Sanitary Sewer Replacement, 1988
|
| |
Shepard Hall to Education Hall
|
| |
|
|
625 S.W. 16th Street Revised
Project, 1987-1988
|
| |
|
|
Sackett Hall Re-roofing, 1987-1988
|
| |
|
|
Plageman Infirmary
Re-roofing, 1987
|
| |
|
|
Peavy Room 254 Modifications, 1987
|
| |
|
|
Women’s Building Remodeling, 1987-1988
|
| |
|
|
Shepard Hall to Benton Hall Sewer Line
replacement (Devco Engineering), 1985-1988
|
| |
|
|
Butke-Transportation, Parking Study
Payments, 1982-1988
|
| |
|
|
CH2M - Miscellaneous
Correspondence, 1986-1987
|
| |
|
|
Sewer Line Replacement(Paul and Green
Associates), 1986
|
| |
|
|
Jeppsen, Miller, & Tobias
(Architects), 1979-1988
|
| |
|
|
Kidder Hall Remodeling, 1987
|
| |
|
|
Cordley Hall Re-roofing, 1987
|
| |
|
|
Target Range Re-roofing, 1987
|
| |
|
|
Langton Hall Re-roofing, 1987
|
| |
|
|
Memorial Union Building Ventilation
System Alterations, 1987
|
| |
|
|
The Residence Hall Quad Re-roofing
Project, 1988
|
| |
|
|
HMSC Seawater System Repair, 1987
|
| |
|
|
Irrigation Systems Installation - Phase
III, 1985-1986
|
| |
|
|
Langton Hall and Women’s Building
Refinish Floors, 1987
|
| |
|
|
Dixon Recreation Center Re-roofing
Project, 1987-1988
|
| |
|
|
Public and Central Facilities Wing
Re-roofing, 1988
|
| |
|
|
Warehouse No. 55 Re-roofing, 1988
|
| |
|
|
Langton Hall Roof
Reconstruction, 1986-1987
|
| |
|
|
Snell Forum Re-roofing, 1988
|
| |
|
|
Women’s Building Shower Rooms
Renovation, 1987
|
| |
|
|
The Horse Barn & Manchester Arena
Re-roofing Project, 1986
|
| |
|
|
Gilmore Hall Re-roofing, 1985
|
| |
|
|
Batcheller Hall Cornice
Restoration, 1986
|
| |
|
|
Women’s Building Re-roofing, 1984
|
| |
|
|
Gill Coliseum Exterior
Restoration, 1988
|
| |
|
|
Withycombe Hall Notice of Plans
Review, 1984
|
| |
|
|
Milam Hall Notice of Plans
Review, 1984
|
| |
|
|
Rogers Hall Notice of Plans
Review, 1984
|
| |
|
|
Nash Hall Notice of Plans
Review, 1984
|
| |
|
|
Parking Lot Improvements, 1987
|
| |
|
|
Milam Hall Re-roofing, 1987
|
| |
|
|
Parking Lot Landscaping, 1986
|
| |
|
|
Pole Building West of Magruder
Hall, 1987
|
| |
|
|
Sackett Hall Re-roofing, 1987
|
| |
|
|
625 SW 16th Street Revised
Project, 1987
|
| |
|
|
Target Range Re-roofing, 1987
|
| |
|
|
Kidder Hall Re-roofing, 1985
|
| |
|
|
Soderstrom Architects Payments and
Supplements (Various Projects), 1983-1990
|
| |
|
|
Soderstrom Architects Parking Garage
Correspondence, 1988
|
| |
|
|
Stastny Architects Handicapped
Accessibility Phase III Correspondence, 1987-1990
|
| |
|
|
Stastny Architects Handicapped
Accessibility Phase III Contract, 1978-1990
|
| |
|
|
Waldo Hall Elevator Handicapped
Accessibility Contract and Correspondence, 1990-1991
|
| |
|
|
Stastny Architects Handicapped
Accessibility Phase III, 1987-1990
|
| |
|
|
Aero Engineering Lab
Re-roofing, 1989-1990
|
| |
|
|
Ocean Shop Roof Extension, 1990-1991
|
| |
|
|
Re-roofing, 1989-1990
|
| |
Finley Hall and Bloss Hall
|
| |
|
|
Burt Hall Re-roofing, 1990-1991
|
| |
|
|
Gilbert Hall Basement Heating and
Condensate System Modifications, 1988-1991
|
| |
|
|
Gill Coliseum Main Roof
Re-roofing, 1990-1991
|
| |
|
|
Handicapped Accessibility Phase III
(Toilet Room Accessibility Projects), 1989-1991
|
| |
|
|
Marine Science Center Public and Central
Facilities Wing Re-roofing, 1988
|
| |
|
|
General Consultants Correspondence
(Various Projects), 1985-1988
|
| |
|
|
Hatfield Marine Science Center OSU
Research Vessel Dock Repair, 1989
|
| |
|
|
Memorial Union Craft Center
Kiln, 1989-1990
|
| |
|
|
Heating Plant Cogeneration, 1986-1989
|
| |
|
|
Cordley Hall Chillers (Replacement
Study), , 1987-1988
|
| |
|
|
Carson, Bekooy, Gulick & Associates,
Inc. Correspondence (Various Projects), 1986- 1988
|
| |
|
|
Administrative Services Building
Expansion, 1986-1989
|
| |
|
|
OSU Fish Disease Research Lab
Proposal, 1987
|
| |
|
|
Gilbert Hall Remodel, 11988-1989
|
| |
|
|
Bookstore Remodel, 1989
|
| |
|
|
Devco Engineering Correspondence
(Various Projects), 1987-1988
|
| |
|
|
O.H. Hinsdale Wave Research Laboratory
and Addition, 1986-1990
|
| |
|
|
Electrical and Computer Engineering
Building, 1985-1989
|
| |
|
|
Parker Stadium End Zone
Improvements, 1989
|
| |
|
|
Re-roofing Projects, 1983-1989
|
| |
Graf Hall, Memorial Union Building, McAlexander Fieldhouse, and
President Byrne’s Residence
|
| |
|
|
Soderstrom Correspondence (Various
Projects), 1986-1990
|
| |
|
|
Soderstrom Payments and Supplements
(Various Projects), 1983-1989
|
| |
|
|
Electrical and Computer Engineering
Building (Covell Hall), 1985-1989
|
| |
|
|
Electrical and Computer Engineering
Building Structural Steel Reports, 1987
|
| |
|
|
Electrical and Computer Engineering
Building Westcold Duroscrew Machine Repair, 1988-1989
|
| |
|
|
Covell Hall Alterations Project
II, 1986-1988
|
| |
|
|
Administration Building
Expansion, 1988-1990
|
| |
|
|
Administration Building Halon Fire
Suppression System, 1989
|
| |
|
|
Administration Building
Telecommunications Equipment Housing, 1988-1989
|
| |
|
|
Apperson Hall Re-roofing, 1988
|
| |
|
|
Benton Hall Acoustical
Remodel, 1988-1989
|
| |
|
|
Covell Hall Fire Escape, 1988-1989
|
| |
|
|
Dixon Recreation Center
Re-roofing, 1989
|
| |
|
|
Wiegand Hall Fume Hood
Installation, 1988-1989
|
| |
|
|
East Greenhouse Revisions, 1989
|
| |
|
|
Fish Disease Research Laboratory (Phases
I-II), 1988-1989
|
| |
|
|
Forest Research Laboratory Structural
Rehabilitation Phase II, 1988-1989
|
| |
|
|
Hatfield Marine Science Center
Roofs, 1987-1989
|
| |
|
|
Gill Coliseum Exterior
Renovation, 1988-1989
|
| |
|
|
Graf Hall Alterations, 1988-1989
|
| |
|
|
Handicapped Accessibility Phase
III, 1987-1990
|
| |
|
|
Heating Plant Cogeneration, 1988-1989
|
| |
|
|
Memorial Union Bookstore
Remodel, 1989
|
| |
|
|
Parking Lots and Streets Maintenance and
Repair, 1989
|
| |
|
|
President’s Residence
Re-roofing, 1989
|
| |
|
|
Residence Hall Quad
Re-roofing, 1988
|
| |
|
|
Shepard Hall Re-roofing, 1989
|
| |
|
|
Snell Forum Re-roofing, 1988-1989
|
| |
|
|
Underground Fuel Tanks
Removal, 1988-1989
|
| |
|
|
Warehouse No. 55 Re-roofing, 1988-1989
|
| |
|
|
Campus Way 11th to 14th Streets Widening
Project, 1989-1990
|
| |
|
|
Computer Science Building Upper Roof
Re-roofing, 1989
|
| |
|
|
Food Services Warehouse
Freezer, 1988-1990
|
| |
|
|
Forest Research Laboratory Electrical
Service Improvements, 1987-1990
|
| |
|
|
Gill Coliseum Flat Roofs
Re-roofing, 1989
|
| |
|
|
Gilbert Hall Remodel, 1989
|
| |
|
|
Handicapped Accessibility Phase III
Contracts A-C, 1988
|
| |
|
|
Hinsdale Wave Research Lab, North/South
Extension, 1988-1990
|
| |
|
|
Marine Science Center Oceanography and
Fisheries Wings Re-roofing, 1989-1990
|
| |
|
|
Langton Hall Golf Shed
Re-roofing, 1989
|
| |
|
|
Seed Laboratory, 1989-1990
|
| |
|
|
Wiegand Hall Growth Chamber
Installation, 1988-1990
|
| |
|
|
Wiegand Hall Re-roofing
Contract, 1989
|
| |
|
|
Wiegand Hall Re-roofing, 1989-1990
|
| |
|
|
Withycombe Hall Room 303 Fume
Hood, 1988-1990
|
| |
|
|
Parker Stadium Improvements Phases
I-III, 1987-1990
|
| |
|
|
Parker Stadium End Zone
Building, 1989-1990
|
| |
|
|
Heating Plant, 1938-1942
|
| |
|
|
Campus Maintenance-General, 1939-1948
|
| |
Plageman, Home Economics, Kidder Library; includes photographs
|
| |
|
|
Kerr Library Expansion
Project, 1994-1996
|
| |
2 folders
|
| |
|
|
644 SW 17th Street Structure
Removal, 1992
|
| |
|
| |
|
|
708 SW 16th Structure
Removal, 1992
|
| |
|
| |
|
|
Arnold Hall
Cafeteria Reroof, 1990-1992
|
| |
|
|
General, 1990-1992
|
| |
|
| |
|
|
Signed Contract, 1991
|
| |
|
|
Project Manual, 1991
|
| |
|
|
Callahan Hall Water Piping Replacement
(signed contract), 1991-1992
|
| |
|
| |
|
|
Campus Fire Alarm Central Reporting
System (signed contract), 1990-1992
|
| |
|
| |
|
|
Child Care Center Art Work, 1991-1992
|
| |
|
| |
|
|
Dixon Aquatics
Center, 1992
|
| |
|
|
DDC System (project manual), 1991
|
| |
|
| |
|
|
DDC Contract Correspondence, 1991-1992
|
| |
|
| |
|
|
Dryden Hall Reroofing (signed
contract), 1991-1992
|
| |
|
| |
|
|
Kidder/Milne Waterline Replacement
(signed contract), 1991-1992
|
| |
|
| |
|
|
Peavy Arboretum Machine Shed Expansion
(signed contract), 1991-1992
|
| |
|
| |
|
|
Peavy Arboretum Forest Club Cabin
Addition (signed contract), 1990-1992
|
| |
|
| |
|
|
Above Ground Fuel Oil Storage Tanks
Phase II, 1992
|
| |
|
|
Foundation-Bids, 1993
|
| |
|
| |
|
|
Foundation
(signed contract), 1993
|
| |
|
| |
|
|
Fuel Storage Tanks Phase II, 1993-1995
|
| |
|
| |
|
|
Fuel Storage Tanks Phase I, 1992-1995
|
| |
|
| |
|
|
Gilmore Hall Parking
Improvements, 1993-1995
|
| |
|
| |
|
|
Gilmore Lot, 1994-1995
|
| |
|
| |
|
|
HMSC Pedestrian Walkway, 1993-1994
|
| |
|
| |
|
|
Intramural Field Irrigation, 1993-1995
|
| |
|
| |
|
|
McNary Hall Parking
Improvements, 1994
|
| |
|
| |
|
|
Milam/Strand Sanitary/Storm Sewer
Replacement, 1993-1994
|
| |
|
| |
|
|
MU Piping Replacement Phase
II, 1992
|
| |
|
| |
|
|
Orchard Street Structure Removal
“A”, 1992-1994
|
| |
|
| |
|
|
Parker Stadium Grandstand Seating
Assembly, 1994
|
| |
|
| |
|
|
Parker Stadium Bleacher
Replacement, 1994-1995
|
| |
|
| |
|
|
McAlexander Fieldhouse Area B
Reroof, 1992-1993
|
| |
|
| |
|
|
Milam Auditorium Seating
Replacement, 1992-1993
|
| |
|
| |
|
|
Mitchell
Gym, 1992-1993
|
| |
|
|
General Project Correspondence
(Pre-Advertisement), 1992
|
| |
|
| |
|
|
Budget, 1992
|
| |
|
| |
|
|
Cost Estimates (Designer
Planner), 1992
|
| |
|
| |
|
|
Public Agency (City, County, EPA,
Permit/Code Appeals, Regulatory), 1992-1993
|
| |
|
| |
|
|
A/E Selection, 1991
|
| |
|
| |
|
|
Percent For Art
Correspondence, 1992-1993
|
| |
|
| |
|
|
OSBHE Correspondence, 1992
|
| |
|
| |
|
|
Schedules (Project Time), 1991-1992
|
| |
|
| |
|
|
Program(Architect
Responsibility), 1991
|
| |
|
| |
|
|
Schematic Design, 1992
|
| |
|
| |
|
|
Design Development, 1992
|
| |
|
| |
|
|
Design Review (In-House), , 1992
|
| |
|
| |
|
|
Contract Documents, 1992
|
| |
|
| |
|
|
Energy Analysis, 1992
|
| |
|
| |
|
|
Bid Preparation, 1992
|
| |
|
| |
|
|
Addenda, 1992
|
| |
|
| |
|
|
Correspondence, Contractor Const.
Schedule, Sub List, Surety Letters, 1992-1993
|
| |
|
| |
|
|
Construction Meeting Notes, 1992
|
| |
|
| |
|
|
Special Testing (Concrete,
etc), 1992
|
| |
|
| |
|
|
Project Close-out (Punch List,
Acceptance recom., Board accept.), 1992-1994
|
| |
|
| |
|
|
DDC System (project manual), 1991
|
| |
|
| |
|
|
A/E Agreement/Supplements, 1992
|
| |
|
| |
|
|
A/E Payments, 1993
|
| |
|
| |
|
|
A/E Contract Correspondence, 1992-1993
|
| |
|
| |
|
|
Contract Change Orders, 1992-1993
|
| |
|
| |
|
|
Contractor Payments, 1992-1993
|
| |
|
| |
|
|
Mitchell Hall Renovation, 1992
|
| |
|
| |
|
|
Rosenfeldt Reroof (Horse
Barns), 1992
|
| |
|
| |
|
|
Rosenfeldt Lab and Feed Barn Bldg.
Reroofing- signed contract, 1991
|
| |
|
| |
|
|
Sackett Condensate Repair, 1992
|
| |
|
| |
|
|
Sackett Hall Condensate Return Line
Repair Rebid- signed contract, 1992
|
| |
|
| |
|
|
Memorial Union Piping Replacement-signed
contract, 1992
|
| |
|
| |
|
|
Memorial Union Waterline
Replacement, 1992-1993
|
| |
|
| |
|
|
Orchard Street Structure Removal “B”-
signed contract, 1992
|
| |
|
| |
|
|
PTW Parking Improvements-signed contract
, 1992
|
| |
|
| |
|
|
Sanitary/Storm Sewer
Rehabilitation-signed contract, 1992
|
| |
|
|
Sewer Rehabilitation, 1992-1994
|
| |
|
| |
|
|
Strand Ag Hall Rooms 136/138 A/C
Modifications-signed contract, 1992-1993
|
| |
|
| |
|
|
Street and Parking Lot Patching-signed
contracts, 1992-1993
|
| |
|
| |
|
|
Wilkinson Hall
Reroof, 1989-1993
|
| |
|
|
Signed Contract, 1989
|
| |
|
|
Project Manual, 1989
|
| |
|
|
General, 1989-1993
|
| |
|
| |
|
|
Women’s Bldg 22/24 Remodel (Blood
Lab), 1993-1994
|
| |
|
| |
|
|
University Theatre HVAC
Rebid, 1992-1993
|
| |
|
| |
|
|
Streets and Parking Lots, 1992
|
| |
|
| |
|
|
Water Research
Lab Reroof, 1991-1993
|
| |
|
|
Signed Contract, 1991
|
| |
|
|
Project Manual, 1991
|
| |
|
|
General, 1989-1993
|
| |
|
| |
|
|
Weniger Hall Reroof, 1992
|
| |
|
|
Signed
Contract, 1991
|
| |
|
| |
|
|
Project-Manual, 1991
|
| |
|
| |
|
|
General, 1991-1992
|
| |
|
|
Women’s
Building Pool Reroofing, 1991-1992
|
| |
|
|
Signed contract, 1992
|
| |
|
| |
|
|
General, 1991-1992
|
| |
|
| |
|
|
Women’s Building Window
Replacement-signed contract, 1991-1992
|
| |
|
| |
|
|
Ag Science
II, 1990-1992
|
| |
|
|
Payments, 1990-1992
|
| |
|
| |
|
|
Planning Minutes, 1988
|
| |
|
| |
|
|
Planning Correspondence
Jan-June, 1987-1989
|
| |
|
| |
|
|
Meeting Notes (Weekly
Status), 1990-1992
|
| |
|
| |
|
|
Clark Lab and Peavy Repairs, 1992
|
| |
|
| |
|
|
Forest Research Scanning Lab, 1992-1993
|
| |
|
| |
|
|
Industrial Building
Demolition, 1992-1993
|
| |
|
| |
|
|
Industrial Building Reroofing-signed
contract, 1992-1993
|
| |
|
| |
|
|
Kerr Library Room 134 HVAC-signed
contract, 1992
|
| |
|
| |
|