Oregon State University Libraries
University Archives
121 The Valley Library
Oregon State University
Corvallis, OR 97331-4501
Phone: 541-737-2165
Email: archives@oregonstate.edu
Web: http://osulibrary.oregonstate.edu/archives



Guide to the Facilities Services Records, 1888-2003


RG 193





Finding aid prepared by Elizabeth Nielsen.

Finding aid encoded by Elizabeth Nielsen., 2008


Overview of the Collection

 
Repository Name:
 

Oregon State University Libraries
University Archives

121 The Valley Library
Oregon State University
Corvallis, OR 97331-4501
Phone: 541-737-2165
Email: archives@oregonstate.edu
Web: http://osulibrary.oregonstate.edu/archives

 
Collection Number:
 

RG 193

 
Creator:
 

Oregon State University. Facilities Services.

 
Title:
 

Facilities Services Records

 
Dates:
 

1888-2003 (inclusive)
1930-1990 (bulk)

 
Quantity:
 

324 cubic feet, including 8650 sheets and 271 photographs
131 boxes, including 13 oversize boxes, and 172 map folders

 
Languages:
 

Materials in English. 

 
Summary:
 

The Facilities Services Records document the physical campus of Oregon State University in Corvallis as well as OSU facilities throughout the state of Oregon beginning with construction of the first building on the current campus in 1888. The records consist predominantly of architectural drawings and files for the design, construction, and modification to structures.

 

Historical Note

Facilities Services at Oregon State University is reponsible for planning, construction, operation, and maintenance of campus facilities and providing a safe environment for faculty, staff, students, and visitors.

Until the early 1990s, Facilities Services was known as the Physical Plant. Until the 1940s, it was common for the head of the physical plant to also be a faculty member in the School of Engineering.

Gordon V. Skelton, a Professor of Highway Engineering, was Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection from 1932 until 1940. From the early 1900s until 1932, he functioned in this role as Chair of the Department of Civil Engineering.

Mark Clyde Phillips, an Associate Professor of Mechanical Engineering, served as Superintendent of Heating from 1910 to 1933 and 1940-1947; he was Superintendent of the Physical Plant from 1933 to 1940. Louis N. Traver served as General Superintendent of the Physical Plant from 1940 to 1947, when Richard A. Adams was appointed to the post. Adams held the position until his retirement at the end of 1971. Subsequent Directors were Everett H. Lillig (1971-1981) and Howard A. Wells, Jr. (1981-1988); and Kathleen Mulligan (1988-1999).

Prior to 1932, there were individual superintendents for heating, buildings, campus and greenhouses, light and power, and plumbing and no general superintendent or head of the Physical Plant.

Content Description

The Facilities Services Records provide in-depth documentation of the physical campus of Oregon State University in Corvallis and OSU facilities throughout the state of Oregon. The records include architectural drawings and plans for structures used in teaching, research, and administration; athletic events; and student housing and dining.

Documentation of the design and construction of major buildings, major renovations, and minor remodeling projects are available in several series and include building specifications, contracts, project manuals, and agreements with architects and engineers. Information about major campus systems, such as electrical, plumbing, fire protection, and heating, are also included. For new construction and major renovations, records of proposals for the Percent for Art public art program are available.

The records include documentation of campus planning; capital expenditures and funding; policies and procedures; land acquisition and ownership; space use; and planning, transportation projects, and other development for the City of Corvallis.

In addition to architectural drawings and plans for individual structures and campus-wide systems, the records include book plans; campus, farm, and property maps; and aerial photographs. The records include plans by numerous architects and designers including John V. Bennes; the Olmsted Brothers; Charles H. Burgraff; Lee Thomas; Burns, Bear, McNeil, Schneider, Bloodworth, and Hawes; Hewlett and Jamison; and Jeppsen and Miller.

The bulk of the records pertain to facilities on the OSU campus in Corvallis. However, materials pertaining to facilities at other locations are also available, including Camp Adair and Adair Village; United States Department of Agriculture buildings at the H.J. Andrews Experimental Forest; and research vessels, docks, and buildings at the the Hatfield Marine Science Center in Newport.

The Gordon V. Skelton correspondence in Series X includes materials pertaining to Skelton's role as chair of the Civil Engineering Department, including curriculum, graduate programs, and interactions with the Dean of Engineering and other campus administrators.

Arrangement

The records consist of 22 series: I. Architectural Drawings and Plans, 1901-1999; II. Building Project Files, 1938-2002; III. Building Specifications and Reports, 1909-2003; IV. Capital Construction Project files, 1962-1997; V. Facilities Planning and Use Committee Records, 1981-1985; VI. General Construction Files, 1989-1997; VII. Minor Building Modifications Files, 1985-1993; VIII. General Subject Numbered Files, 1968-1991; IX. Committee Records, 1966-2003; X. Correspondence, 1888-2003; XI. Land Ownership and Property, 1940-1951; XII. Policies and Procedures, 1986-1994; XIII. Publications, 1989-2001; XIV. Space Use, 1960-1969; XV. Staff Meeting Minutes, 1992-2001; XVI. Time Records, 1913-1939; XVII. Renderings (Drawings) of Campus Buildlings, 1949-1975; XVIII. Book Plans, 1960-1993; XIX. Lighting (Interior) Study, circa early-mid 1980s; XX. Campus, Farm, and Property Maps, 1899-1900; XXI. Aerial Photographs, 1952-1979; and XXII. Photographs, 1963.

Administrative Information

Acquisition Information 

Transferred from Facilities Services (and the Physical Plant) in numerous accessions from the 1970s through 2007.

Future Additions 

Additions to the collection are expected.

Use of the Collection

Restrictions on Access 

Collection is open for research.

Preferred Citation 

Facilities Services Records (RG 193), Oregon State University Archives, Corvallis, Oregon.

Related Information

Related Materials 

The Memorabilia Collection (text/html)  includes brochures and general information about Facilities Services, information about individual structures, and materials pertaining to campus planning. More detailed information about the construction of some major buildings is available in the records of the corresponding office or department; for example, information about construction and remodeling of the Valley Library (and its predecessors, the Kerr Library and Kidder Hall) are available in the Library Records (RG 009) (text/html) .

Capital Construction Funding Records for 1952-1989 as well as other materials pertaining to buildings and facilities are part of the Business Affairs Records (RG 017).

Additional correspondence of Gordon V. Skelton is available in the Civil Engineering Department Records (RG 030).

Subjects

H.J. Andrews Experimental Forest (Or.)
Hatfield Marine Science Center.
Oregon Agricultural College--Buildings.
Oregon State Agricultural College--Buildings.
Oregon State College--Buildings.
Oregon State University--Buildings.
Architects--Oregon.
Campus planning--Oregon--Corvallis.
College buildings--Oregon.
College facilities--Oregon--Planning.
Engineering--Study and teaching (Higher)--Oregon--Corvallis.
Oceanographic research ships--Oregon.
Public art--Oregon--Corvallis.
Student housing--Oregon--Corvallis.
Adair Village (Or.)
Camp Adair (Or.)
Aerial photographs.
Architectural drawings (visual works)
Floor plans.
Maps.
Photographic prints.
Renderings (drawings)
Other Creators :
Bennes, John V.
Olmsted Brothers.
Oregon Agricultural College. Physical Plant.
Oregon State College. Physical Plant.
Oregon State University. Physical Plant.

Detailed Description of the Collection

 

Series I:  Architectural Drawings and Plans, 1901-1999,   (bulk 1928-1991)

196 cubic feet (7418 sheets)151 map folders and 5 oversize boxes
Series I consists of architectural drawings and plans for construction of or major modifications to most structures on the Corvallis campus and for many at other OSU locations throughout the state. They include facilities used for teaching, research, administration, athletic events, and student housing and dining. This series also include plans for buildings constructed by the United States Department of Agriculture (USDA); projects pertaining to campus-wide systems or multiple buildings; structures at Camp Adair and Adair Village; research vessels; and buildings for which plans were prepared but were not constructed. The lists of building plans typically use the current name of OSU buildings.
 
 
Container(s)
Description
   
Individual Structures, 1901-1999
 
140 cubic feet (5531 sheets)  ( 109 map folders and 5 oversize boxes)
These plans are for construction of or major modifications to more than a hundred individual structures on the Corvallis campus and at other OSU locations in Oregon. They include facilities used for teaching, research, administration, and athletic events. A plan-level list with building name, plan title, date, architect, and number of sheets is available online (text/html) .
   
Student Housing, 1928-1996
 
25 cubic feet (1103 sheets)  ( 18 map folders and 2 oversize boxes)
The Student Housing plans are for student housing and dining structures. They include plans for Arnold Dining Hall and Bloss and Finley Residence Halls; Buxton, Cauthorn, Hawley, and Poling Halls; Azalea House; College Inn; Heckart and Reed Lodges; the Housing Service Building; Married Student Housing; Sackett, Snell, and Weatherford Halls; and the West Hall Dormitory and Cafeteria. Plans for several structures that were not built are also included. A plan-level list with building name, plan title, date, architect, and number of sheets is available online (text/html) .
   
USDA Buildings, 1967-1984
 
2 cubic feet (273 sheets)  ( 1 oversize box and 3 map folders)
The USDA Buildings plans are for structures on the Oregon State University Corvallis campus or other properties that were constructed by the United States Department of Agriculture (USDA) for its research units. They include plans for the Forestry Sciences Laboratory, the National Forage Seed Production Research Center, and the Ornamental Plans Research Facility on the Corvallis campus as well as plans for the administrative site at the H.J. Andrews Experimental Forest near Blue River, Oregon, in the central Cascade Range. A list of the USDA Buildings plans is available online (text/html) .
   
Campus Wide, 1948-1993
 
25 cubic feet (344 sheets)  ( 2 oversize boxes and 13 map folders)
Plans that document projects that pertain to campus-wide systems or multiple buildings are included in this subseries. These include plans for electrical systems, fire alarm systems, handicapped accessibility and safety deficiency corrections, parking lots, roofs, sidewalks and streets, subsurface investiagions, underground fuel tank removal, utility tunnels, and water systems. A list of the Campus Wide plans is available online (text/html) . Plans pertaining to the utility tunnels are described by plan title; all other plans are described at the folder-level with the range of dates of the contents of each folder.
   
Camp Adair (Adair Village), 1946-1979
 
1 cubic foot (75 sheets)  ( 1 oversize box and 4 map folders)
The Camp Adair (Adair Village) plans consist of plans for structures used by Oregon State College from the end of World War II (1946) through the late 1970s as well as maps of the camp and village.
 

*


Adair Air Force Station, 1958-1969
 
35 sheets
 
box
107


Adair Village Boundary Survey, 1949
 
2 sheets
 

*


Library Storage, 1973-1979
 
3 sheets
 
box
107


Library Storage, undated
 
4 sheets
 

*


Maps of Lands and Rights of Way, 1946-1949
 
10 sheets
 

*


Veterans Housing Project for Corvallis, Oregon, 1946
 
15 sheets
 

*


Veterans Temporary Housing, 1946
 
6 sheets
   
Research Vessels, 1959-1963
 
2 cubic feet (35 sheets)  ( 2 map folders)
These plans are for oceanographic research vessels built or modified by Oregon State University.
   
Not Built, 1930-1975
 
1 cubic foot (57 sheets)  ( 2 oversize boxes and 2 map folders)
These plans are for buildings and structures that were not constructed. They include a proposed agricultural engineering bulding (1953), an agricultural sciences and continuing education complex (1969), a biological science building (1930), family living center (1962), Oceanography III building (1975), Navy ROTC building (1945), and a research laboratory building (1945). In some cases, they represent proposed buildings for which approval or funding was not received. Plans for student housing structures that were not built are in the Student Housing subseries. A list of these Not Built plans is available online (text/html) ; the list provides building name, plan title, date, architect, and number of sheets.

 

Series II:  Building Project Files, 1938-2002,   (bulk 1974-1998)

84.3 cubic feet including 138 photographs87 boxes and 1 map folder
The building project files document the construction, renovation, and maintenance of various OSU buildings and include building specifications, contracts, correspondence, project manuals, progress reports, contract insurance reports, agreements with architects and engineers, contract proposals, and statements of qualifications. Structural repair and maintenance projects are also described in this series and cover insulation installation, re-roofing, and HVAC system management. Architectural drawings and plans have been separated to Series I. Records documenting the selection and installation of artwork funded by the Percent for Art public art program are also included in this series. The series includes photographs (indicated below). This series includes records pertaining to capital construction projects.
 
 
Container(s)
Description
 
box
1


Parker Stadium Additions, 1966-1969
 


Mechanical Engineering Building, 1966-1968
 


Earth Sciences Addition, 1964-1977
 


Oceanography Building-First Addition, 1968
 


Kidder Hall, 1964
 


Oceanography Building-First Addition, 1968
 


Kerr Library-First Addition, 1964-1973
 
2

Kerr Library-First Addition, 1969-1973
 


Horse Center/Arena, 1966-1975
 


Animal Isolation Facility, 1968-1978
 


Dixon Recreation Center, 1971-1976
 


Covell Hall-KOAC, 1976-1978
 


Bicycle Rack Covers, 1976
 


Energy Conservation-Instrumentation and Monitoring at OSU, 1977
 


Oceanography Building-First Addition, 1968
 


Parker Stadium Covering, 1976
 
2-3

Animal Care Facilities, 1973-1976
 
3

Dearborn Hall Remodel, 1974-1975
 


McAlexander Fieldhouse-Technical Information, 1969-1970
 


Coliseum Substation and Weatherford Switching Station, 1970-1971
 


Cordley Hall Ventilation Improvements, 1978-1979
 


Electrical Distribution System, 1972-1977
 


Dixon Recreation Center, 1978-1979
 


Spring Sports Complex, 1972-1977
 


Snell Hall, 1976
 
map/case
*


Memorial Union East Directory, undated
 
box
3


Student Union Facilities, 1976-1978
 
4

Student Union Facilities (includes Memorial Union remodel), 1976-1981
 


Gilbert Hall Addition, 1978-1981
 
5

Gilbert Hall Addition and Renovation, 1978-1981
 
Includes photographs in Budget Summary and Construction Summary folders.
 


Safety Deficiencies Phases I-III (and corrections), 1975-1980
 
Agriculture Hall, Batcheller Hall, Bexell Hall, Cordley Hall, Covell Hall, Dearborn Hall, Dryden Hall, Farm Crops Building, Forest Research Lab, Gilbert Hall, Gill Coliseum, Kidder Hall, Langton Hall, Oceanography Building, Rogers Hall, Shepard Hall, Vocational Shops, Weniger Hall, Wiegand Hall, Wilkinson Hall, and Women’s Building
 
map/case
*


Phase I, Fee Analysis (1 sheet), undated
 
box
6


Safety Deficiencies Phases I-II, 1978-1979
 
Nash Hall, and Dryden Hall
 


Physical Plant Warehouse Building #2 , 1979
 


Plageman Infirmary , 1978
 


Forest Research Lab, 1979
 


Re-Roofing Projects, 1979-1980
 
Agriculture Utilities, Gill Coliseum, Merryfield Annex, McAlexander Field House, Langton Hall, Pharmacy Building, Plageman Infirmary, Covell Hall, Weniger Hall, Withycombe Hall, and Orchard Street Nursery
 


Gill Coliseum , 1980
 


Tennis Court Resurfacing, 1976-1978
 


Tennis Court Resurfacing, 1976-1978
 


Residence Halls Covered Walkway Painting, 1976-1978
 
Callahan Hall, McNary Hall, West Hall, Buxton Hall, and Poling Hall
 


Sidewalk Repairs and Wheelchair Ramps, 1979-1980
 


Street Lighting Improvements, 1979-1980
 


Street Overlays, 1979-1980
 


Veterinary Barn, 1979
 


Vocational Shops Storage Building, 1980
 


Exterior Painting, 1979
 
Waldo Hall and Agricultural Utility Building
 


Weniger Hall, 1980
 


West Greenhouse, 1980
 


Kitchen Modifications, 1980
 
West Hall and Weatherford Hall
 


Weatherford Hall, 1981
 


Re-Roofing Projects, 1978
 
Withycombe Hall and Merryfield Hall
 


Withycombe Hall, 1975-1979
 


Women’s Softball Field, 1979
 


Veterinary Hospital, 1980-1982
 
7

Veterinary Medicine Teaching Hospital (Magruder Hall), 1979-1983
 
Includes photographs in Roof-VMTH folder
 
8

Veterinary Medicine Teaching Hospital, 1979-1980
 


Crop Science Building, 1980
 


Memorial Union, 1979
 


Education Hall, 1976-1978
 


Roofing Projects, 1978
 
Withycombe Hall, Social Science Building, Heating Plant, and Merryfield Hall
 


Adair Village Library Storage, 1978-1980
 


Exterior Painting, 1977-1979
 
Apperson Hall, Batcheller Hall, Covell Hall, Dearborn Hall, Women’s Building, Moreland Hall, and Langton Hall
 


Ionization Detectors, 1979
 
Avery Lodge and Dixon Lodge
 


Bexell Halll, 1979
 


Cordley Hall, 1979
 


Dawes House, 1977-1978
 


East Greenhouse, 1979
 
9

Exterior Painting, 1980
 
Education Hall, Kerr Library Walkway, Nash Hall, Peavy Hall, and Pharmacy Building
 


Gill Coliseum WIA Remodel, 1980
 


Housing Warehouse Lot Expansion, 1979
 


Marine Science Center, 1979
 


Infirmary New Hot Water Piping, 1980
 


Milam Hall Sanitary Sewer Repair, 1979
 


Oceanography Addition, 1979-1980
 


Parker Stadium Structural Steel & Handrails Painting, 1995-1996
 


Maintenance, 1984-1985
 
Administration Building, Apperson Hall, Bexell Hall, Buxton Hall, Campus, Cauthorn Hall, Ch2M Building, Coed Cottage, Computer Science, Cordley Hall, Covell Hall, Crop Science, Dairy Center, Dearborn Hall, Dryden Hall, East Greenhouse, Education Hall, Elementary Education room 220C, Fairbanks, Freight Office, Gilbert Hall, Gill Coliseum, Gilmore Hall, Heating Plant, Industrial Building, Information Booth, Kidder Hall, Lab Animal Resource Center, Langton Hall, Library, Magruder Hall, McAlexander Fieldhouse, Memorial Union, Merryfield Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Naval Armory, Ocean II, OSU Credit Union, Outdoor Directory Near Bookstore, Park Terrace, PE Laundry, Peavy Hall, Pharmacy Building, Plageman Hall, President’s Residence, Radiation Center, Snell Hall, Steam Tunnel, Stewart Center, Student Health, Tunnel Mall in Jefferson, Vocational Shops, Waldo Hall, Weniger Hall, West Greenhouse, Wilkinson Hall, Wilson Hall, Withycombe Hall, and Women’s Building
 


Weniger Hall, 1984-1985
 


Langton Hall, 1985
 


Marine Science Center, 1976-1977
 


Marine Science Center Library, 1974-1980
 


Marine Science Center East Parking Lot, 1977
 


Cultural and Conference Center, 1979-1982
 


Veterinary Hospital, 1979-1980
 
10

Gilbert Hall Addition and Renovation, 1979-1983
 


Gill Coliseum, 1984
 


Small Contract Bids, 1972-1973
 
Administration Services Building, Ag Chem Department, Animal Science Shed, Arnold Way Sidewalk, Dryden Hall, Student Health Services, Weniger Hall, Women’s Building, and Wyckoff Memorial Volleyball Court
 


Campus Outdoor Lighting, 1971-1980
 


National Forage Seed Research Center, 1981-1985
 


Stadium Avenue Revisions Phase I, 1981-1982
 


Parking Improvements, 1980-1981
 


Newport Marine Science Center Paving Project, 1980
 


Oceanography Annex Remodeling, 1981
 


Parker Stadium TV Crew Shelter, 1979-1980
 


Parker Stadium Football Facilities, 1979-1980
 


Martel House, 1977-1980
 


Parker Stadium Improvements, 1967-1969
 


Tennis Courts, 1976
 


Utility Tunnel and Heating Plant Insulation, 1982
 


Veterinary Diagnostic Laboratory, 1981
 


Water Study, 1969-1979
 


Weatherford Hall Modernization, 1981
 


Weniger Hall Air Conditioning, 1981-1982
 


West Greenhouse and Motor Pool Annex Re-Roofing, 1981
 


Withycombe Hall Solar and Atmospheric Radiation Laboratory, 1980-1981
 


Women’s Building Remodel, 1981
 


Withycombe Hall, 1975
 


Spring Sports Complex, 1972-1976
 


Marine Science Center Dormitory Addition, 1974-1975
 


Kidder Hall Study, 1979
 


Administration Building Mechanical System Study, 1981
 


Cordley Hall Refrigeration System Revisions, 1976-1977
 


Primary Power Distribution System Short Circuit Study, 1974
 


Electrical Distribution Facilities Study, 1971
 
11

Electrical Engineer’s Services: CH2M Hill, 1971-1976
 


Electrical Distribution System: Engineering Payments, Engineering and Design Associates, , 1974-1980
 


Construction Reports, 1981
 


Motor Pool Re-roofing, 1981
 
contract payment request
 


Motor Pool Annex Re-roof: Jack Largent Company, 1981
 


Gill Coliseum: New Maple Floor-Correspondence, 1972-1973
 


Wiegand Hall: Re-roofing, 1975-1978
 


Agriculture Hall: Re-roofing, 1981
 


Gilbert Hall Addition, 1977-1981
 


Memorial Union Phase III, 1978-1982
 


Fire Alarm Study: Prepared for OSU Physical Plant Dept, 1971
 


Campus Fire Alarm System: OSU, 1974
 


Marine Science Center Aquaculture Lab, 1977-1982
 
12

Marine Science Center Aquaculture Lab, 1978-1981
 


Marine Science Center Research Support Facility, 1979-1982
 


Administrative Services Building Room B 210-E Contract, 1980
 


Administrative Services A/B HVAC Study-Keith Kruchek, 1981
 


Andrews Experimental Forest, 1980-1981
 


Campus Outdoor Lighting System Improvements, 1975-1976
 


Cauthorn Hall Lounge Remodel Contract, 1979
 


Cordley Hall Ammonia Replacement Program, 1979
 


Cordley Hall Alterations: Siemens Electron Microscope, 1980
 


Cordley Hall Third Floor Cold Storage Renovation, 1981
 


Quad Floor Lounge Partitions Housing: Architect, 1978-1979
 


Data Services Center: Administrative Building Air Conditioning, 1980
 


Data Services Center: Heat Balancing-Keith Kruchek, 1979-1980
 


Dearborn Hall Remodel Rooms 202 Through 206 and 301 Contracts, 1981-1982
 


Dryden Hall Remodel Rooms 204 and 205 Contract, 1979-1980
 


Earth Sciences (Wilkinson Hall) Roof, 1973-1977
 
13

Education Hall Stair Covering, 1981
 


Parking Lots, 1978
 
Finley Hall and McAlexander Fieldhouse
 


Precast Concrete Joint Re-caulking, 1975
 
Finley Hall and Bloss Hall
 


Gill Coliseum Football Locker Room Remodel, 1980
 


Primary Electrical Distribution System, 1969-1975
 
Oceanography Building, Bioscience Building, Heating Plant, Forestry Building, Administration Building, Bloss Hall, Arnold Hall, Library, Chemistry Building, Agricultural Sciences Building, Married Student Housing, Intramural Recreation, Student Health Services Addition, Weatherford Hall, Art Center, Batcheller Hall, Covell Hall, Physical Plant, and Civil Engineering Building
 


Forest Research Laboratory, 1980-1981
 


Gilbert Hall Piping Modifications, 1980-1981
 


Gill Coliseum Remodel, 1979-1980
 


Handrail Modifications, 1981-1982
 
Education Hall, Extension Hall, Gilmore Hall, Graf Hall, Merryfield Hall. Pharmacy Hall, and Social Science Building
 


Gill Coliseum Maple Flooring, 1971-1972
 


Heating Plant Boiler Re-Tubing, 1981
 


Heating Plant Replace Breeching, 1981
 


Industrial Building Printing Plant Remodel, 1980
 


Kerr Library Lighting Study, 1981
 


Kidder Hall Heating and Cooling System Analysis, 11979-1980
 


Langton Hall Swimming Pool Drainage Modifications, 1982
 


Marine Science Center Fire Detection System, 1982
 


Marine Science Center Freeze Protection Building, 1980-1981
 


Marine Science Center Paving Project, 1980
 


McAlexander Fieldhouse Remodel, 1980
 


Magnetic Water Conditioners, 1980
 
McNary Hall, Wilson Hall, and Callahan Hall
 


Martel House Remodel, 1980
 


McNary Hall Cafeteria Chiller Replacement, 1980-1981
 


McNary Dining Hall Heating and Air Conditioning System Study, 1979-1981
 


Median Improvements on 26th Street (between Western Avenue and Washington Way), 1981
 


Milne Computer Center Halon Fire Suppression System, 1981
 


Moreland Hall Handrail Modifications, 1981
 


Motor Pool Re-Roofing, 1981
 


Construction Progress Report, 1982-1983
 
Memorial Union Remodel, Handicapped Accessibility, Washington Way Tennis Court Renovation, Gilbert Hall Renovation, Crop Science Building, Newport Research Support Facility, and Veterinary Medical Teaching Hospital
 


Re-Roofing Projects, 1982
 
Heating Plant, Agriculture Hall, Extension Hall, and Women’s Study Center
 


Madison Avenue Landscaping (between 9th and 11th Streets), 1983
 


Marine Science Center Covered Walkway, 11980-1984
 


Weniger Hall HVAC Systems, 1975-1980
 


Wilkinson Hall Addition, 1979
 


Wall Partitions, 1979
 
Cauthorn Hall and Hawley Hall
 


Parking Lot (26th and Parker Stadium), 1985
 


Spring Sports Complex, 1980-1981
 


Waldo Hall Remodel, 1979
 


Extension Annex Addition and Alterations, 1982
 


Extension Hall Parking Lot Overlay, 1982
 


Extension Hall Parking Lot Overlay, 1982
 


Farm Crops Building Access Flooring, 1982
 


Heating Plant Oxygen Analyzers, 1983
 


Arnold Dining Hall Folding Partition, 1982
 


26th Street Island Improvement, 1982-1983
 
14

Dorm Services Building Addition, 1982
 


Gilbert Hall Addition and Renovation, 1979-1982
 


Heating Plant Oxygen Analyzers, 1983
 


Marine Science Center Backflow Prevention, 1982
 


Newport Research Support Facility, 1981-1982
 


Memorial Union Re-Roofing, 1982
 


Oceanography Biological Curation Building, 1982
 


Steam Condensate Return Pipe Insulation, 1982-1983
 


Weatherford Hall Bathroom Modernization, 1982
 


Gilbert Hall Replacement Windows, 1983
 


Gilbert Renovation, 1980-1982
 


Gilbert Hall Addition and Renovation, 1977-1982
 


Gilbert Hall Remodel, 1980-1983
 


Washington Way Tennis Court Renovation, 1976-1984
 


Memorial Union Remodel Phase IV, 1981-1984
 
15

Memorial Union Remodel Phase IV, 1982-1983
 


Specifications - Removal of Architectural Barriers to the Handicapped in various buildings at OSU, 1981
 


OSU Foundation Cultural and Conference Center (Changes in the Contract Documents), 1980
 


Intramural/Recreation Building (Dixon Recreation Center Maintenance), 1973-75
 


Gilbert Hall Remodel, 1979-1983
 


Arnold Dining Hall Folding Partition, 1982
 


Oceanography Biological Curation Building, 1982
 


Bio-Mass Gasification Project, 1979-80
 


Construction Insurance, 1976-78
 


Cordley Hall Piping Modifications, 1983
 


Dorm Services Building Addition, 1982-1983
 


Extension Annex Addition and Alterations, 1982-1983
 


Dryden Hall Fire Restoration, 1983
 


Farm Crops Building Access Flooring, 1982
 
16

Precast Joint Caulking, 1983
 
Finley Hall and Bloss Hall
 


Proposed “Great Hall”, 1976
 


Insulation of Attics, 1983
 
Benton Hall, Bexell Hall, Covell Hall, Moreland Hall, Study Center, Waldo Hall, Sheppard Hall, Physical Plant, Milam Hall, Apperson Hall, and Extension Hall
 


Magruder Hall Computer Room Installation, 1983
 


Marine Science Center Backflow Prevention, 1982
 


Marine Science Center Weather Station, 1983
 


Mechanical Room Steam Pipe Insulation, 1983
 
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell Hall, Chemical Engineering Building, Cordley Hall, Cordley Addition, Covell Hall, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial Building Manhole, Vocational Shops, Kerr Hall, Kidder Hall, Laboratory Animal Resources Building, Langton Hall, Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Laboratory, Shepard Hall, Plageman Infirmary, Waldo Hall, Wiegand Hall, Wythecombe Hall Boiler Room, Women’s Building, and Women’s Study Center
 


Major Construction Miscellaneous Correspondence, 1971-1973
 


Minor Construction Miscellaneous Correspondence, 1971-1980
 


Performing Arts Center, 1976
 


Re-Roofing Projects, 1983
 
Oceanography Building, Clark Meat Lab, McAlexander Fieldhouse, Langton Hall, Pharmacy Building, Erma Plageman Infirmary, Covell Hall, Weniger Hall, and Orchard Street Nursery
 


Marine Science Center Parking Lot, 1983
 


Extension Hall Parking Lot Overlay, 1982
 


Weniger Hall Exterior Door Modification, 1983
 


Steam Condensate Return Pipe Insulation (Utility Tunnel), 1983
 


McNary Hall Exterior Finish Replacement, 1983
 


Heating Plant Emergency Generator Modifications, 1983
 


Crop Science Building Fire Protection, 1980-1985
 


Crop Science Building, 1978-1983
 
17

Crop Science Building, 1978-1984
 


Crop Science Building Fire and Life Safety Review, 1969-1980
 


Oceanography Curation Building Preparation Room, 1983-1984
 


Wave Tank Facility Covering Building, 1982-1983
 


Re-Roofing Projects, 1983-1984
 
Oceanography Building and Clark Meat Lab
 


Administrative Services Building Data Services Air Conditioning Revision, 1983
 


Mechanical Room Steam Pipe Insulation, 1982
 
Agriculture Utilities Building, Apperson Hall, Batcheller Hall, Bexell Hall, Chemical Engineering Building, Cordley Hall, Covell Hall, Cordley Addition, Dearborn Hall, Dryden Hall, Extension Hall, Farm Crops Building, Farm Crops Manhole, Gilbert Hall, Gilmore Hall, Graf Hall, Industrial Building North Manhole, Vocational Shops North and South Manhole, Kerr Library, Kidder Hall, Lab Animal Resources Building, Langton Hall, Magruder Hall, Milam Hall, Milne Computer Center, Moreland Hall, Nash Hall, Seed Lab, Shepard Hall, Plageman Infirmary North and South Manhole, Waldo Hall, Wiegand Hall, Withycombe Hall Boiler Room, Women’s Building, and Women’s Study Center
 


Cordley Hall Piping Modifications, 1983
 


Dearborn Hall Access Flooring, 1983
 


East Greenhouse Heating Modifications, 1983
 


Precast Slab Joint Caulking, 1983
 
Finley Hall and Bloss Hall
 


Insulating Attics, 1983
 
Apperson Hall, Batcheller Hall, Benton Hall, Bexell Hall, Covell Hall, Dryden Hall, Extension Hall, Fairbanks Hall, Langton Hall, McAlexander Fieldhouse, Milam Hall, Moreland Hall, Physical Plant Office, Shepard Hall, Waldo Hall, Wiegand Hall, and Women’s Study Center
 
18

Attic Insulation, 1981-1983
 
University Steam Plant Complex, McAlexander Fieldhouse, Batcheller Hall, Milam Hall, Langton Hall, Wiegand Hall, Covell Hall, Apperson Hall, Extension Hall, Waldo Hall, Moreland Hall, Bexell Hall, Fairbanks Hall, Shepard Hall, Benton Hall, Dryden Hall, Women’s Study Center, and Physical Plant Office
 


Diving Board Handrails, 1982-1984
 
Langton Hall and Women’s Building
 


Magruder Hall Computer Installation, 1983
 


Marine Science Center Parking Lot, 1983
 


Marine Science Center Weather Station, 1983
 


Marine Science Center Dock Renovations, 1983-1984
 


McNary Hall Exterior Finish Replacement, 1983-1984
 


Milne Computer Center Air Conditioning Modifications, 1983-1984
 


Milne Computer Center Room 210 Remodel, 1983-1984
 


Oceanography Biological Curation Building Preparation Room, 1983-1984
 


Orchard Avenue Parking Lot, 1983
 


Weatherford Hall Hot Water Tank Replacement, 1983
 


Weniger Hall Water Purification System, 1983-1984
 


Test-holes and Proposed Water-well, 1974
 


Dearborn Hall Room 312 Remodel Phases I-II, 1984-1986
 


Gill Coliseum Project I, 1984-1987
 
19

Gill Coliseum Projects I-IV, 1984-1985
 


Gill Coliseum Portable Stage, 1985
 


Attic Insulation, 1984
 
Kidder Hall, Gilmore Hall, and Women’s Building
 


Madison Avenue Reconstruction (S.W. Sixth Street to S.W. Eleventh Street), 1981
 


Marine Science Center Covered Walkway, 1984
 


Steam and Condensate Pipe Insulation, 1984
 
Boiler Plant, Gilbert Hall, Gill Coliseum, Plumbing Shop, Carpenter Shop, Carpenters
 


Carpenters, 1984-1987
 
Lunch Room, and Strand Agriculture Hall
 


McNary Hall Exterior Finish Replacement Phase II, 1984
 


Re-Roofing, 1984-1985
 
McAlexander Fieldhouse, Nash Hall, Memorial Union Building, Women’s Building, and Navy ROTC Building
 


Nash Hall Fire Restoration, 1983-84
 


Pharmacy Building Heat Recovery System, 1984
 


East Greenhouse Water Line Replacement, 1984
 


Parker Stadium Artificial Turf Replacement, 1984
 


Women’s Building and Langton Hall Remodel, 1984-85
 


Snell Hall Renovation, 1983
 


Weniger Hall Remodel, 1984-85
 


West Range Greenhouse Plumbing and Electrical Modifications, 1984
 


Weniger Hall Remodel, 1984-85
 


Veterinary Research Laboratory Remodel, 1984
 
20

Snell Hall Remodel, 1984-85
 


Weniger Hall Remodel, 1984
 


Gill Coliseum Refinish Maple Floor, 1985
 


Waldo Hall Remodel, 1985
 


Dixon Recreation Center Re-roof, 1985
 


Re-roofing, 1984
 
College Inn, Food Service Warehouse, and Sackett Hall
 


Gill Coliseum Refinish Maple Floor, 1985
 


Utility Data for Langton Hall and Women’s Building, 1984
 


Oceanography II Remodel, 1985
 


Sanitary Sewer Project, 1983
 


Waterline Replacement, 1984-85
 
Milam Hall, Nash Hall, and Withycombe Hall
 


Women’s Building Remodel, 1984-85
 


Veterinary Medicine Animal Isolation Laboratory Septic Tank Drain Field, 1984
 


Kidder Hall Re-roofing, 1985-86
 


Lab Animal Resources Exterior Wall Insulation, 1983-86
 


Off Duty Service Requests, 1984-87
 
21

Police and Security Department/Traffic Office Report of Activities, 1983-1986
 


Energy Conservation Measures, 1984-1986
 
Langton Hall and Women’s Building
 


Re-Roofing, 1984-1987
 
Nash Hall and Navy ROTC Building
 


Oceanography Building Remodel I-II, 1984-1986
 


Snell Hall Third Floor Remodel, 1985-1986
 


Parking Lot Improvements and Repair, 1985-1986
 


Rogers Hall Insulate Heating and Chilled Water Piping, 1986
 


Weniger Hall Re-Roofing, 1987
 


Weniger Hall Acid Resistant Drain Piping, 1984-1986
 


OSU Horse Center Farrier School Manchester Arena, 1984-1986
 
22

Kidder Hall Re-roofing, 11985-1987
 


Langton Hall Roofing, 1986-1987
 


Gilbert Hall Renovation, 1980-1986
 


Crew Building, 1986
 


Benton Hall Re-roofing and Exterior Repairs, 1986
 


Batcheller Hall Electrical and Computer Alterations, 1986
 


Heating Plant Economizer Installation, 1986-1987
 


Snell Hall Third Floor Remodel, 1985-1986
 


Women’s Building Re-roof, 1986
 


Snell Hall Re-roof, 1986-1987
 


National Forage Seed Production Research Center, 1983-1986
 


Water Line Replacement, 1984
 
Milam Hall, Withycombe Hall, Nash Hall, and Rogers Hall
 


OSU Golf Course, 1978-1980
 
23

Poling and Hawley Halls Lounge Remodel, 1985-1986
 


625 SW 16th Project, 1986-1987
 


West Greenhouse Parking Lot Improvements, 1987
 


Parking Lot Repairs, 1986-1987
 


Snell Hall Re-roofing Project, 1986
 


Soderstrom Architects and Roofing Consultants Correspondence, 1983-1986
 
Involves majority of campus buildings
 


Floor Refinishing, 1986-1988
 
Langton Hall and Women’s Building
 


Re-roofing Project, 1987
 
Callahan Hall, McNary Cafeteria, and West International House
 


Electrical and Computer Engineering Building Alterations for Handicapped, 1986
 


Physical Plant Department Handicapped Access, 1986-1987
 


Graf Hall Alterations, 1986
 


ECE Building and Graf Hall Related Alternations, 1986
 


Apperson Hall and Merryfield Hall Alterations, 1986
 


ECE Building, Apperson, and Merryfield Hall Alterations, 1986-1987
 
24

Kidder Hall Re-roofing, 1986-1987
 


Memorial Union Storm Sewer, 1987
 


Oceanography Building (Room 424) Remodel, 1986-1988
 


Parking Lot Improvements, 1987-1988
 


Pole Building West of Magruder Hall, 1986-1987
 


Women’s Building Re-roofing, 1986-1987
 


Weniger Hall Re-roofing, 1987-1988
 


Electrical and Mechanical Consulting Services, 1982-1987
 


Asbestos Removal, 1986-1987
 
Callahan Hall, McNary Cafeteria, and West International House
 


Weatherford Hall Renovation, 1987
 


Restoration, Re-roofing, and Repairs, 1986-1988
 
Batcheller Hall and Benton Hall
 


Roof Repairs, 1987
 
Peavy Hall and Langton Hall
 


Clark Meat Lab Sanitary Sewer, 1986-1988
 


Cordley Hall Re-roofing, 1987
 
25

Dixon Recreation Center Re-roofing, 1988-1989
 


Dixon Recreation Center Weight Room Floor Addition, 1987-1988
 


Physical Plant Communications Conduit Installation, 1988
 


Computer Science Building Alterations, 1986-1987
 


Physical Plant Shops Alterations, 1986-1987
 


Computer Science Building Artwork Installation, 1987-1988
 


Hatfield Marine Science Center Seawater System Investigation and Repair, 1982-1988
 


Hatfield Marine Science Center Proposed Laboratory and Library Addition, 1986-1988
 


Hinsdale Wave Research Lab, 1986-1988
 


Horse Barn and Manchester Arena Re-roofing, 1987-1988
 


Langton Hall Re-roofing, 1987-1988
 
26

Langton Hall Pool Roof Restoration, 1987-1988
 
includes photographs
 


McNary Hall Dining Modifications, 1988
 


Memorial Union Ventilation System Improvements, 1987-1988
 


Milam Hall Re-roofing, 1987-1988
 


Irrigation System for 26th and Orchard Street Parking Lot, 1986-1987
 


Peavy Hall (Room 254) Modifications, 1987-1988
 


Target Range Re-roofing, 1987
 


Radiation Center and Campus Lights Energy Conservation Project, 1988
 


Sanitary Sewer Replacement, 1988
 
Shepard Hall to Education Hall
 


625 S.W. 16th Street Revised Project, 1987-1988
 


Sackett Hall Re-roofing, 1987-1988
 
27

Plageman Infirmary Re-roofing, 1987
 


Peavy Room 254 Modifications, 1987
 


Women’s Building Remodeling, 1987-1988
 


Shepard Hall to Benton Hall Sewer Line replacement (Devco Engineering), 1985-1988
 


Butke-Transportation, Parking Study Payments, 1982-1988
 


CH2M - Miscellaneous Correspondence, 1986-1987
 


Sewer Line Replacement(Paul and Green Associates), 1986
 


Jeppsen, Miller, & Tobias (Architects), 1979-1988
 


Kidder Hall Remodeling, 1987
 


Cordley Hall Re-roofing, 1987
 


Target Range Re-roofing, 1987
 


Langton Hall Re-roofing, 1987
 


Memorial Union Building Ventilation System Alterations, 1987
 


The Residence Hall Quad Re-roofing Project, 1988
 


HMSC Seawater System Repair, 1987
 


Irrigation Systems Installation - Phase III, 1985-1986
 


Langton Hall and Women’s Building Refinish Floors, 1987
 


Dixon Recreation Center Re-roofing Project, 1987-1988
 


Public and Central Facilities Wing Re-roofing, 1988
 
28

Warehouse No. 55 Re-roofing, 1988
 


Langton Hall Roof Reconstruction, 1986-1987
 


Snell Forum Re-roofing, 1988
 


Women’s Building Shower Rooms Renovation, 1987
 


The Horse Barn & Manchester Arena Re-roofing Project, 1986
 


Gilmore Hall Re-roofing, 1985
 


Batcheller Hall Cornice Restoration, 1986
 


Women’s Building Re-roofing, 1984
 


Gill Coliseum Exterior Restoration, 1988
 


Withycombe Hall Notice of Plans Review, 1984
 


Milam Hall Notice of Plans Review, 1984
 


Rogers Hall Notice of Plans Review, 1984
 


Nash Hall Notice of Plans Review, 1984
 


Parking Lot Improvements, 1987
 


Milam Hall Re-roofing, 1987
 


Parking Lot Landscaping, 1986
 


Pole Building West of Magruder Hall, 1987
 


Sackett Hall Re-roofing, 1987
 


625 SW 16th Street Revised Project, 1987
 


Target Range Re-roofing, 1987
 


Kidder Hall Re-roofing, 1985
 


Soderstrom Architects Payments and Supplements (Various Projects), 1983-1990
 


Soderstrom Architects Parking Garage Correspondence, 1988
 


Stastny Architects Handicapped Accessibility Phase III Correspondence, 1987-1990
 


Stastny Architects Handicapped Accessibility Phase III Contract, 1978-1990
 


Waldo Hall Elevator Handicapped Accessibility Contract and Correspondence, 1990-1991
 
29

Stastny Architects Handicapped Accessibility Phase III, 1987-1990
 


Aero Engineering Lab Re-roofing, 1989-1990
 


Ocean Shop Roof Extension, 1990-1991
 


Re-roofing, 1989-1990
 
Finley Hall and Bloss Hall
 


Burt Hall Re-roofing, 1990-1991
 


Gilbert Hall Basement Heating and Condensate System Modifications, 1988-1991
 


Gill Coliseum Main Roof Re-roofing, 1990-1991
 


Handicapped Accessibility Phase III (Toilet Room Accessibility Projects), 1989-1991
 


Marine Science Center Public and Central Facilities Wing Re-roofing, 1988
 


General Consultants Correspondence (Various Projects), 1985-1988
 


Hatfield Marine Science Center OSU Research Vessel Dock Repair, 1989
 


Memorial Union Craft Center Kiln, 1989-1990
 


Heating Plant Cogeneration, 1986-1989
 


Cordley Hall Chillers (Replacement Study), , 1987-1988
 


Carson, Bekooy, Gulick & Associates, Inc. Correspondence (Various Projects), 1986- 1988
 


Administrative Services Building Expansion, 1986-1989
 


OSU Fish Disease Research Lab Proposal, 1987
 


Gilbert Hall Remodel, 11988-1989
 
30

Bookstore Remodel, 1989
 


Devco Engineering Correspondence (Various Projects), 1987-1988
 


O.H. Hinsdale Wave Research Laboratory and Addition, 1986-1990
 


Electrical and Computer Engineering Building, 1985-1989
 


Parker Stadium End Zone Improvements, 1989
 


Re-roofing Projects, 1983-1989
 
Graf Hall, Memorial Union Building, McAlexander Fieldhouse, and President Byrne’s Residence
 


Soderstrom Correspondence (Various Projects), 1986-1990
 


Soderstrom Payments and Supplements (Various Projects), 1983-1989
 
31

Electrical and Computer Engineering Building (Covell Hall), 1985-1989
 


Electrical and Computer Engineering Building Structural Steel Reports, 1987
 


Electrical and Computer Engineering Building Westcold Duroscrew Machine Repair, 1988-1989
 


Covell Hall Alterations Project II, 1986-1988
 


Administration Building Expansion, 1988-1990
 


Administration Building Halon Fire Suppression System, 1989
 
32

Administration Building Telecommunications Equipment Housing, 1988-1989
 


Apperson Hall Re-roofing, 1988
 


Benton Hall Acoustical Remodel, 1988-1989
 


Covell Hall Fire Escape, 1988-1989
 


Dixon Recreation Center Re-roofing, 1989
 


Wiegand Hall Fume Hood Installation, 1988-1989
 


East Greenhouse Revisions, 1989
 


Fish Disease Research Laboratory (Phases I-II), 1988-1989
 
33

Forest Research Laboratory Structural Rehabilitation Phase II, 1988-1989
 


Hatfield Marine Science Center Roofs, 1987-1989
 


Gill Coliseum Exterior Renovation, 1988-1989
 


Graf Hall Alterations, 1988-1989
 


Handicapped Accessibility Phase III, 1987-1990
 


Heating Plant Cogeneration, 1988-1989
 


Memorial Union Bookstore Remodel, 1989
 
34

Parking Lots and Streets Maintenance and Repair, 1989
 


President’s Residence Re-roofing, 1989
 


Residence Hall Quad Re-roofing, 1988
 


Shepard Hall Re-roofing, 1989
 


Snell Forum Re-roofing, 1988-1989
 


Underground Fuel Tanks Removal, 1988-1989
 


Warehouse No. 55 Re-roofing, 1988-1989
 


Campus Way 11th to 14th Streets Widening Project, 1989-1990
 


Computer Science Building Upper Roof Re-roofing, 1989
 


Food Services Warehouse Freezer, 1988-1990
 


Forest Research Laboratory Electrical Service Improvements, 1987-1990
 


Gill Coliseum Flat Roofs Re-roofing, 1989
 
35

Gilbert Hall Remodel, 1989
 


Handicapped Accessibility Phase III Contracts A-C, 1988
 


Hinsdale Wave Research Lab, North/South Extension, 1988-1990
 


Marine Science Center Oceanography and Fisheries Wings Re-roofing, 1989-1990
 


Langton Hall Golf Shed Re-roofing, 1989
 


Seed Laboratory, 1989-1990
 


Wiegand Hall Growth Chamber Installation, 1988-1990
 


Wiegand Hall Re-roofing Contract, 1989
 
36

Wiegand Hall Re-roofing, 1989-1990
 


Withycombe Hall Room 303 Fume Hood, 1988-1990
 


Parker Stadium Improvements Phases I-III, 1987-1990
 


Parker Stadium End Zone Building, 1989-1990
 


Heating Plant, 1938-1942
 


Campus Maintenance-General, 1939-1948
 
Plageman, Home Economics, Kidder Library; includes photographs
 


Kerr Library Expansion Project, 1994-1996
 
2 folders
 
37

644 SW 17th Street Structure Removal, 1992
 
7200
 


708 SW 16th Structure Removal, 1992
 
7200
   
Arnold Hall Cafeteria Reroof, 1990-1992
 


General, 1990-1992
 
7200
 


Signed Contract, 1991
 


Project Manual, 1991
 


Callahan Hall Water Piping Replacement (signed contract), 1991-1992
 
17030
 


Campus Fire Alarm Central Reporting System (signed contract), 1990-1992
 
17030
 


Child Care Center Art Work, 1991-1992
 
17030
   
Dixon Aquatics Center, 1992
 


DDC System (project manual), 1991
 
17030
 


DDC Contract Correspondence, 1991-1992
 
7200
 


Dryden Hall Reroofing (signed contract), 1991-1992
 
7200
 


Kidder/Milne Waterline Replacement (signed contract), 1991-1992
 
17030
 


Peavy Arboretum Machine Shed Expansion (signed contract), 1991-1992
 
17030, 7200
 


Peavy Arboretum Forest Club Cabin Addition (signed contract), 1990-1992
 
17030
 


Above Ground Fuel Oil Storage Tanks Phase II, 1992
   
Foundation-Bids, 1993
 
7200
   
Foundation (signed contract), 1993
 
7200
 
box
37


Fuel Storage Tanks Phase II, 1993-1995
 
7200
 
38

Fuel Storage Tanks Phase I, 1992-1995
 
7201
 


Gilmore Hall Parking Improvements, 1993-1995
 
7201
 


Gilmore Lot, 1994-1995
 
7201
 


HMSC Pedestrian Walkway, 1993-1994
 
7201
 


Intramural Field Irrigation, 1993-1995
 
7201
 


McNary Hall Parking Improvements, 1994
 
7201
 


Milam/Strand Sanitary/Storm Sewer Replacement, 1993-1994
 
7201
 


MU Piping Replacement Phase II, 1992
 
7201
 


Orchard Street Structure Removal “A”, 1992-1994
 
7201
 


Parker Stadium Grandstand Seating Assembly, 1994
 
7201
 


Parker Stadium Bleacher Replacement, 1994-1995
 
7201
 
39

McAlexander Fieldhouse Area B Reroof, 1992-1993
 
7200
 


Milam Auditorium Seating Replacement, 1992-1993
 
7200
   
Mitchell Gym, 1992-1993
 


General Project Correspondence (Pre-Advertisement), 1992
 
5000
 


Budget, 1992
 
5000
 


Cost Estimates (Designer Planner), 1992
 
5000
 


Public Agency (City, County, EPA, Permit/Code Appeals, Regulatory), 1992-1993
 
5000
 


A/E Selection, 1991
 
5000
 


Percent For Art Correspondence, 1992-1993
 
5000
 


OSBHE Correspondence, 1992
 
5000
 


Schedules (Project Time), 1991-1992
 
5000
 


Program(Architect Responsibility), 1991
 
5000
 


Schematic Design, 1992
 
5000
 


Design Development, 1992
 
5000
 


Design Review (In-House), , 1992
 
5000
 


Contract Documents, 1992
 
5000
 


Energy Analysis, 1992
 
5000
 


Bid Preparation, 1992
 
5000
 


Addenda, 1992
 
5000
 


Correspondence, Contractor Const. Schedule, Sub List, Surety Letters, 1992-1993
 
5000
 


Construction Meeting Notes, 1992
 
5000
 


Special Testing (Concrete, etc), 1992
 
5000
 


Project Close-out (Punch List, Acceptance recom., Board accept.), 1992-1994
 
5000
 


DDC System (project manual), 1991
 
17030
 


A/E Agreement/Supplements, 1992
 
5000
 


A/E Payments, 1993
 
5000
 


A/E Contract Correspondence, 1992-1993
 
5000
 


Contract Change Orders, 1992-1993
 
5000
 


Contractor Payments, 1992-1993
 
5000
 


Mitchell Hall Renovation, 1992
 
5000
 


Rosenfeldt Reroof (Horse Barns), 1992
 
7200
 


Rosenfeldt Lab and Feed Barn Bldg. Reroofing- signed contract, 1991
 
17030
 


Sackett Condensate Repair, 1992
 
7200
 


Sackett Hall Condensate Return Line Repair Rebid- signed contract, 1992
 
17030
 
40

Memorial Union Piping Replacement-signed contract, 1992
 
7200
 


Memorial Union Waterline Replacement, 1992-1993
 
7200
 


Orchard Street Structure Removal “B”- signed contract, 1992
 
7200
 


PTW Parking Improvements-signed contract , 1992
 
7200
 


Sanitary/Storm Sewer Rehabilitation-signed contract, 1992
 


Sewer Rehabilitation, 1992-1994
 
7200
 


Strand Ag Hall Rooms 136/138 A/C Modifications-signed contract, 1992-1993
 
7200
 


Street and Parking Lot Patching-signed contracts, 1992-1993
 
7200, 7201
   
Wilkinson Hall Reroof, 1989-1993
 


Signed Contract, 1989
 


Project Manual, 1989
 


General, 1989-1993
 
7200
 


Women’s Bldg 22/24 Remodel (Blood Lab), 1993-1994
 
7200
 


University Theatre HVAC Rebid, 1992-1993
 
7200
 


Streets and Parking Lots, 1992
 
7200
   
Water Research Lab Reroof, 1991-1993
 


Signed Contract, 1991
 


Project Manual, 1991
 


General, 1989-1993
 
7200
 
41

Weniger Hall Reroof, 1992
   
Signed Contract, 1991
 
17030
   
Project-Manual, 1991
 
17030
   
General, 1991-1992
   
Women’s Building Pool Reroofing, 1991-1992
 
box
41


Signed contract, 1992
 
7200
 


General, 1991-1992
 
7200
 


Women’s Building Window Replacement-signed contract, 1991-1992
 
7200
   
Ag Science II, 1990-1992
 


Payments, 1990-1992
 
7200
 


Planning Minutes, 1988
 
7200
 


Planning Correspondence Jan-June, 1987-1989
 
7200
 


Meeting Notes (Weekly Status), 1990-1992
 
7200
 
42

Clark Lab and Peavy Repairs, 1992
 
7200
 


Forest Research Scanning Lab, 1992-1993
 
7200
 


Industrial Building Demolition, 1992-1993
 
7200
 


Industrial Building Reroofing-signed contract, 1992-1993
 
7200
 


Kerr Library Room 134 HVAC-signed contract, 1992
 
7200
 


Lower Campus Irrigation-signed contract, 1992-1993
 
7200
   
University Theatre, 1990-1993
 


Change Orders, 1991
 
7200
 


Contract Correspondence, 1991-1993
 
7200
 


Payments, 1991-1992
 
17030
 
41

Signed Contract, 1991
 


General, 1990
 
42

Women’s Building Remodel for Conference Room-signed contract, 1990-1991
 
17030
 


Parker Stadium Signage, 1991
 
17030
 


Tennis Court Renovations, 1992-1992
 


Signed Contract, 1991-1992
 
17030
 


General, 1991-1992
 
17030, 7200
 
43

OSU Street and Parking Lot Asphalt Concrete Patching and Paving-signed contract, 1991
 


Parking Lots and Streets, 1991-1992
 
17030
 


Ocean Administration Building Reroofing-signed contract, 1990
 
17030
 


Campus Lighting, 1990-1992
 
17030
 


Hartman Company Supplemental Payments, 1990-1993
 
8000
 


Hyde & Associates, 1990-1995
 
8000
 


Hyde & Assoc. Heat Plant Fuel Tanks, 1993-1994
 
8000
 


Interface Engineering Supplement/Payment, 1992-1994
 
8000
 


ISES/Facilities Condition Audit, 1991
 
8000
   
McBride Ralston, 1991-1993
 


Correspondence, 1991-1992
 
8000
 


New Agreement Payments, 1990-1993
 
8000
 


New Agreement Supplemental Payments, 1992-1993
 
8000
 


1993 Agree. Suppl/Pay, 1993
 
8000
 


Settecase Smith Doss/Admin Services Lobby, 1993
 
8000
 


Administrative Services Bldg Remodel, 1992-1993
 
8001
   
OSU Environmental Computing Center, 1992-1994
 
44

A/E Payments, 1992
 
5000
 


Contract Change Orders, 1992-1994
 
5000
 


Contractor Payments, 1992-1994
 
5000
 


Project Manual Specifications, 1992
 
5000
 


Langton Hall Room 200-Signed Contract, 1989-1990
 
17030
 


Langton Hall Reroof Areas C, D, & E Signed Contract, 1990-1991
 
17030
 


Magruder Reroof, 1990-1991
 
17030
 


Moreland Hall Reroof, 1989-1990
 
17030
 


Street and Parking Lot Patching, 1990-1991
 
17030
 


Weniger Hall Room 151 Lighting Improvements, 1990
 
17030
 


West Hall Cafeteria Reroofing, 1990-1991
 
17030
 


Wiegand Hall Reroofing Areas B and C, 1990-1991
 
17030
 
45

Withycombe-Wiegand Sanitary Sewer Rehabilitation, 1990
 
17030
   
OSU Environmental Computing Center, 1991-1993
 


Budget, 1991-1993
 
5000
 


General Project Correspondence (Pre-Advertisement), 1991-1992
 
5000
 


Cost Estimates (Designer, Planner), 1991-1992
 
5000
 


Public Agency (City, County, EPA, Permit/Code Appeals, Regulatory), 1991-1993
 
5000
 


Studies/Special Reports (Traffic, Soils, Asbestos), 1991-1992
 
5000
 


A/E Selection, 1991
 
5000
 


% for Art/Correspondence, 1993
 
5000
 


Schedules (Project Time), 1991-1992
 
5000
 


OSBHE Correspondence, 1991
 
5000
 


OSBHE Correspondence, 1991
 
5000
 


Program (Architect Responsibility), 1989-1991
 
5000
 


Schematic Design, 1991
 
5000
 


Design Development, 1991-1992
 
5000
 


Design Review (In-House), 1991-1992
 
5000
 


Contract Documents, 1992
 
5000
 


Plan Review (In-House), 1992
 
5000
 


Equipment, 1992-1994
 
5000
 


Bid Preparation, 1992
 
5000
 


Addenda, 1992
 
5000
 


Construction Correspondence, 1993-1994
 
5000
 


Special Testing (Concrete, etc), 1992-1993
 
5000
 


Construction Meeting Notes, 1992
 
5000
 


Correspondence, Contractor, Const. Schedule, Sub List, Surety Letters, 1992
 
5000
 


Project Close-out (Punch List, Acceptance Recom., Board Accept.), 1993-1994
 
5000
 


Structural Calculations KPFF Project No.91421, 1992
 
5000
 


A/E Contract Correspondence, 1991-1993
 
5000
   
OSU Environmental Computing Center:, 1991-1994
 
46

A & E Payments, 1993-1994
 
5000
 


Contract/Artist–Kim Hoffman, 1993
 
5000
 


Contract/Artist–Leo Osborne, 1993
 
5000
 


A/E Payments, 1991
 
5000
 


Contract/Artist–Frank Boyden, 1993
 
5000
 


Environmental and Engineering Services, Inc. Agreement, Supplement/Payment, 1996
 
5000
 


Endex Engineering, Inc., Agreement, Supplement/Payment, 1996
 
8000
   
gLAs Architectural Group, 1994-1996
 


Agreement, Supplement/Payment, 1996
 
8000
 


1994 Agreement, Supplements for 1996, 1994-1996
 
8000
 


Correspondence, 1996-1997
 
2 folders
8000
 


Withycombe Correspondence, 1993-1996
 
8000
 


Withycombe Supplements/Payments, 1993-1996
 
8000
 


ISES Corporation Facilities Condition Audits, 1992-1996
 
8000
 


Lisa Bailey Architect Agreement, Supplement/Payment, 1995
 
8000
 


Marinello Engineering Agreement, Supplement/Payment, 1996
 
8000
   
McBride Architects, 1994-1996
 


PC Agreement, Supplement/Payments, 1994-1995
 
8000
 


Correspondence, 1994-1996
 
8000
 


Various (Exterior Envelope Study of the Administration Building, Radiation Lab Reroofing Project and Roof Analysis Report), 1994-1995
 
8000
 


Agreement, Supplement/Payment, 1996
 
8000
 
47

McBride Architects Agreement, Supplement/Payments, 1990-1996
 
8000
 


MFIA Inc. Agreement, Supplement/Payment, 1996
 
8000
 


RSS Architecture Agreement, Supplement/Payments, 1994-1996
 
8000
 


Professional and Personal Services Contracts, 1992-1994
 
8100
 


The Balzhiser Group Agreement/Contract/Supplements, 1987-1992
 
8000
   
Parker Stadium Improvements, 1988-1993
 


Correspondence, 1991-1993
 
7200
 


Misc., 1991
 
folder 1
 


Geotechnical Report-Proposed West Grandstand Stadium Cover and New Locker Room Facility, 1988-1992
 


Change Orders, 1991-1992
 
7200
 


Weekly Meeting Notes, 1991
 
7200
 


Correspondence, 1991-1993
 
7200
 


Payments, 1992-1993
 
7200
   
Parker Stadium Improvements, 1991
 
48

Payments, 1991
 
2 folders
 


Construction Contract Set, Project Manual Volume I, 1991
 


General, 1991
 


Forest Research Laboratory, 1988-1992
 


Remodel, 1991-1992
 


Proposal, 1991
 


Reroofing Project, 1988-1989
 


Restroom Remodel, 1991
 


Scanning Lab Renovation, 1991-1992
 


Scanning Lab Renovation Budgets, 1991-1992
 


Family Studies Center-Conversion of Kent House, etc. into Parking Lots, 1989-1992
 


Forestry Research Lab Specifications, 1994
 


HVAC Modifications, undated
 
2 copies
 


Locker Room Remodel, undated
 
2 copies
 


Process Control Lab Remodel, 1994
 
2 copies
 


Benton Acoustics, Feasibility Study, 1993
 


Carkin Arbuckle Costic Architects, 1993-1994
 


Benton Hall Renovation Correspondence, 1993-1994
 
8000
 


Correspondence, 1993-1994
 
8000
 


Supplement/Payments, 1993-1994
 
8000
   
Carlson/Veit Architects, 1993-1995
 


Women’s Building Rooms 6/7 Remodel (Research Lab) Correspondence and Supplement/Payments, 1993-1995
 
8000
 


Carson Bekooy Gulick 1992 Agreement, 1994 Correspondence, 1994
 
8000
 


Cooling Feasibility Study, Weatherford Hall Dining Facility, 1994
 
8000
 


Carson Bekooy Gulick 1992 Agreement, 1992-1993 Correspondence, 1992-1993
 
8000
 


Carson Bekooy Gulick 1992 Agreement, 1994 Supplement/Payments, 1994
 
8000
 
49

Carson Bekooy Gulick 1992 Agreement, Supplement/Payments, 1992-1994
 
8000
 


Carson Suppl #6 Dryden Piping, 1989-1993
 
8000
   
CH2M Hill, 1993-1994
 


HMSC Soil Testing, 1994
 
8000
 


Steam Line Correspondence and Supplements/Payments, 1994
 
8000
 


Condensate System Consultant Selection, 1993-1994
 
8000
 


Consultants reference (David Evans and Associates, Inc., John Graham Associates,, 1986-1987
 


Interface Engineering, Inc., PAE Consulting Engineers Inc., Schuchart & Associates, SERA Architects, Van Gulik & Associates , Inc.), 1986-1987
 


Consulting Services, General, 1990-1991
 
8000
   
DEVCO Engineering, Inc, 1993-1994
 


New Agreement, Supplement/Payments, 1994
 
8000
 


New Agreement, Correspondence, 1993
 
8000
 


Dearborn Motor Test, Consultant Selection, 1994
 
8000
 


DEVCO Engineering, Inc., Supplement/Payments, 1993
 
8000
 


Foundation Engineering, Inc., Property Administration Building Special Testing, 1994-1995
 
8000
 


McBride Ralston Correspondence, 1993
 
8000
 


UST Environmental Services, 1993-1994
 
8000
   
Dixon Aquatic Facility, 1990-1992
 


Expansion Contract Correspondence, 1991
 
7200
 


Contract Correspondence, 1990
 
7200
 


Planning Correspondence, 1990
 
7200
 


Expansion Payments, 1991
 
7200
 


DDC Control System, 1992
   
Dixon Aquatics Facility, 1990-1993
 
50

Expansion Payments, 1991-1993
 
7200
 


Expansion Project Manual, Specifications, Vol. 1 of 2, 1990
 


Expansion Project Manual, Details, Vol. 2 of 2, 1990
 


East Greenhouse Flat Roof Replacement, 1992
 
7200
   
Family Study Center, 1990-1993
 


Artwork, 1990-1991
 
7200
 


Payments, 1991
 


Change Orders, 1991-1992
 
7200
 


Concrete/Steel Tests, 1990-1991
 
7200
 


Contract Correspondence, 1991-1993
 
7200
 


Project Manual/Signed Contract, 1990
   
Settecase Smith Doss, 1987-1994
 


Parker Stadium End Zone Payments, 1989-1990
 
8000
 


Parker Stadium II Agreement/Supplements, 1990-1991
 
8000
 


Parker Stadium II Payments, 1990-1993
 
8000
 


Theatre Relocation Correspondence, 1990-1994
 
8000
 


Theatre Relocation Payments, 1991-1993
 
8000
 


Theatre HVAC Correspondence, 1992-1993
 
8000
 


Theatre HVAC Agreement/Payment, 1990-1993
 
8000
 


Parker End Zone Correspondence, 1987-1993
 
8000
 


Parker Stadium II, 1990-1992
 
8000
 
51

TBG Dixon Rec Aquatics Payments, 1989-1991
 
8000
   
Cordley Hall Reroofing Project, 1991-1993
 


Signed Contract, 1991
 
17030
 


General, 1991-1993
 
7200
   
Cordley Hall Waterline Replacement, 1989-1991
 


Signed Contract, 1992
 


General, 1991-1993
 
7200
 


Bids, 1991
 
7200
 


Cordley Seawater/Planning Correspondence, 1993
 
7200
   
Dixon Aquatics Facility, 1991-1993
 


Artwork, 1991-1992
 
7200
 


Change Orders, 1991-1993
 
7200
 


Contract Correspondence, 1992-1993
 
7200
 


Dixon Recreation Center Corrosion Study, 1993
 
7200
 
52

Dixon Recreation Center Contract Correspondence, 1991-1992
 
7200
   
Family Study Center, 1989-1993
 


Meeting Notes, 1991
 
7200
 


Payments, 1990-1993
 
7200
 


Planning Correspondence Yearly, 1989-1990
 
7200
 


Bid/Contract Correspondence, 1990-1992
 
17030
 


FRL Locker Room Remodel- bids, 1993
 
7200
 


Oregon State University FRL Locker Room Remodel- signed contract , 1993
 
7200
 


Forest Research Lab Locker Room Remodel, 1993
 
7200
 


FRC HVAC bid documents, 1993
 
7200
 


Oregon State University FRL HVAC Modifications - signed contract, 1993
 
7200
 


Forest Research Lab HVAC Modifications, 1993
 
7200
 


Forest Research Lab Remodels- Plan Stage, 1991-1992
 
7200
 


Gleeson Hall Reroofing-signed contract, 1991
 
53

Gleeson Hall Reroof, 1991
 
7200
 


Heating Plant Reroofing-signed contract, 1992
 


Heat Plant Reroof, 1992-1993
 
7200
 


Langton Stair Replacement-Bids, 1993
 


Langton Hall Exterior Stair Replacement-signed contract, 1993
 
7200
 


McAlexander Fieldhouse Painting & Roof Recoating-signed contract, 1992-1993
 
7200
 


McAlexander Fieldhouse Painting & Roof Recoating-signed contract, 1992-1993
 
7200
 


Administrative Services Lobby Renovation-signed contract, 1993
 
7200
 


Administrative Services Lobby Construction Correspondence, 1993-1994
 
7201
 


Ag Science II Contract Correspondence 1990, 1991
 
7200
 


Ag Science II DDC System Contract Correspondence 1991, 1991
 
7201
 


Administrative Services Lobby Payment/Change Order, 1993-1994
 
7201
 


Administrative Services Lobby Planning Correspondence, 1993-1994
 
7201
   
Ag Science II DDC System, 1990-1992
 


General, 1990-1993
 
17030
 


Contract Correspondence, 1990, 1992-1994
 
7201
 


Payments, 1991-1992
 
7201
 
54

Ag Science II DDC System Payments 1991, 1991-1992
 
7201
 


Batcheller Hall and Covell Hall Reroofing-signed contract, 1993
 
7200, 7201
 


Burt Hall Piping Replacement-signed contract,, 1993-1995
 
7200, 7201
 


Coleman Field Parking Improvements-signed contract, 1994
 
7200
 


Coleman Field Parking Lot, 1994
 
7201
 


Ag Experiment Station, Consultant Services (Food Tox Lab), 1992
 
8000
 


Ag Experiment Station, Consultant Services, 1990-1991
 
8000
 


Master Plan Consultant-A Project Team Proposal, 1989
 


Master Plan Consultant-OSU Long Range Campus Master Plan Update, 1989
 


Ag Science II/RMC Consulting (Bob Cash), 1989-1990
 
8000
 


Ann Storrs, 1991-1992
 
8000
 


Architectural Consultant Selection, 1990
 
8000
 


Balzheiser and Hubbard Fire Alarm Systems, 1990
 
8000
 


Carson Suppl #2 Food Service Warehouse Freezer, 1990
 
8000
 


Carson Suppl #4 Weniger Growth Chambers, Room 635, 1988-1990
 
8000
 


Carson Suppl #4 Weniger Growth Chambers, Room 635, 1988-1990
 
8000
 


Corrosion Study of Transmission Pipes, 1986
 


Carson Suppl #30 FRL, 1986-1990
 
8000
 


Carson New Agreement/Payments, 1989-1990
 
17020
 


Subsurface Investigation-Proposed Bio. Science Bldg./Revised Compilation of Existing Soils Data and Summary of Subsurface Conditions, 1990
   
CH2M, 1986-1991
 


Correspondence 1990, 1990
 
8000
 


New Agreements Payments, 1989-1991
 
8000
 


Suppl #2/16 Gilbert Condensate, 1986-1990
 
8000
 


Ed Carpenter, Artist, 1989-1991
 
8000
 


Fire Alarm System Consultant Selection, 1989-1990
 
8000
 


Geotechnical Study-Child Care Center, 1990
 


Geotechnical Study-Family Study Center, 1989
 


Geotechnical Investigation-Kerr Library Additions, 1991
 
7201
 


Fujitani Hilts & Assoc. Family Studies Center, 1989-1992
 
8000
 


James Graham 1990, 1988-1990
 
8000
 
55

K & D Engineering, Inc. Correspondence and Supplement/Payment, 1992
 
8000
 


Kerr Library Expansion Consultant Selection, 1990
 
8000
 


Mackensie Engineering (Formerly M/Saito), 1990
 
8000
 


Statement of Qualifications presented to OSU for Consulting Services for Roof Management Program, 1990
 


Marie Baxter/Todd Bartman, Artists, 1992
 
8000
 


McBride Ralston Payments/Supplements 1990, 1990
 
8000
 


Peavy Addn/Frl Consultant Selection, 1990
 
8000
 


Peterson Agreement/Supplement 1989, 1989
 
8000
 


Pittsburgh Testing Lab (Steel) , 1990-1992
 
8000
 


Roberta Kaserman, Artist, 1991-1992
 
8000
 


SRG Peavy Addition Correspondence, 1990
 
8000
 


Tyler, Douglas/ECE Artwork (included photos), 1992
 
8000
 


AG Experiment Station, Consultant SVCS, 1992
 
8000
 


Albert Duble, Acoustics Consultant, 1992
 
8000
   
Carson, 1986-1989
 


Correspondence 1990, 1989
 
8000
 


Supplement 14/31, 1988-1989
 
17020
 


Supplement #23/26/27/28 AT&T, 1986-1989
 
8000
   
CH2M, 1986-1989
 


Correspondence 1989, 1989
 
8000
 


Agreement/Supplement , 1986-1988
 
8000
 


Supp #18 Cordley Chillers, 1986-1989
 
17020
 


Suppl #19/29 FRL, 1988-1989
 
8000
 


Child Care Center Architect Selection, 1989
 
8000
 


Child Care Center Architect Selection, 1989
 
8000
 


Chris Billings & Associates, 1989
 
8000
 


Child Care Architectural Site, 1989
 
8000
 


Civil Engineering Consultant Selection, 1989
 
8000
 


Piper Jaffray Incorporated-Annual Report, 1990
 


Kerr Library Addition, 1989
 
8000
 


Statement of Qualifications for Engineering Consulting Services for the OSU Physical Plant, 1989
 
17020
 


Hill International, Inc., 1989
 


Roofing Replacement Consulting Services (Charles L. Youngman, Inc.), 1989
 


Consulting Services, General, 1989
 
8000
 


Prospectus for Energy Design Consultant (North American Energy Services), 1990
 
8000
 


Engineering Report for OSU Langton Hall Swimming Pool Balcony, 1989
 


DEVCO Correspondence Jan.-Jul, 1989
 
8000
 
56

DEVCO Correspondence Aug.-Dec, 1989
 
8000
 


LH Morrish Electric Inc., 1988
 
8000
 


Physical Plant Memorandum-Selection of Electrical Consultant, 1988
 


Electrical Consultant Selection, 1986-1989
 
8000
 


Endex Engineering, Inc. Misc., 1988-1989
 
8000
 


Family Studies Center Architect Selection, 1988-1989
 
8000
 


Foundation Engineering, 1988-1989
 
8000
 


Gazley, Plowman, Atkinson-Correspondence, 1987-1989
 
17020
 


Gordon & Associates, Inc., 1988-1989
 
8000
 


Kerr Expansion Contract Correspondence, 1991
 
7200
 


Administrative Services Lobby Consultant Selection, 1993
 
8000
 


Benton Acoustics Consultant Selection, 1993
 
8000
 


Resilience Tests Conducted on Artificial Playing Surface at Parker Stadium, 1990
 


Braun Intertec (Formerly NW Testing Labs), 1986-1992
 
8000
 


Carson Correspondence , 1990
 
8000
 


Carson Engineers Agreement, 1986-1989
 
8000
 


CH2M Agreement 1989, 1989-1991
 
8000
   
DEVCO, 1989-1990
 


Correspondence, 1990
 
8000
 


Payments, 1989
 
8000
 


Supplemental Payment, 1989-1990
 
8000
 
57

DEVCO Supplemental Payment July-Dec, 1991
 
8000
 


GBD/Family Studies Center Correspondence Yearly, 1990-1992
 
8000
 


Geotechnical Study-Family Study Center, 1989
 
8000
 


GBD Family Study Center Correspondence Jan.-June , 1990
 
8000
   
McBride Ralston, 1990-1992
 


New Agreement Payments, 1990-1991
 
8000
 


New Agreement Supplemental Payments, 1991
 
8000
 
50

Payments/Supplements, 1991-1992
 
8000
 
57

Michael & Lakeman Child Care Center Correspondence 1990, 1989-1990
 
8000
 


Professional Services Contracts, 1986-1991
 
8100
 


Robin Rickabaugh, Artist (Principia Graphica), 1988-1992
 
8000
   
Settecase Smith Doss/Ag Science II, 1987-1993
 


Agreement/Supplement, 1987-1991
 
8000
 


Correspondence, 1991-1994
 
8000
 


Payments, 1991-1993
 
8000
   
TBG Dixon Rec Aquatics, 1988-1993
 


Correspondence, 1988-1993
 
8000, 17020
 


Payments, 1992-1993
 
8000
 
58

Burt Hall Reroof-signed contract, 1992-1993
 
7200
 


Clark Lab Wall Repair and Reroof-signed contract, 1993
 
7200
 


Cordley Hall Chiller Replacement-signed contract, 1991
 
17030
 


Crop Science Parking Lot and Moreland Hall Parking Lot Improvements Project-signed contract, 1990-1991
 
17030
 


Moreland Hall Parking Lot Improvements-signed contract, , 1990
 
8000
   
Forest Research Lab Reroof and Glulam Replacement Project, 1990
 


Signed Contract, 1990
 


General, 1990-1991
 
17030
 


Gilbert Hall Remodel-signed contract, 1989
 
8000
 


Gleeson Hall Entrance Reconstruction-Signed Contract, 1991
 
17030
   
Graf Hall Reroofing, 1990-1991
 


Project Manual, 1990
 
17030
 


Signed Contract, 1990
 
17030
 


General, 1990-1991
 
17030
 


Handicapped Access Phase III “G” Waldo Elevator Payments/Change Ord, 1990-1991
 
17030
 


Prevailing Wage Rates for Public Works Contracts in Oregon, 1990
 
17030
 
59

Handicapped Accessibility Phase III Contract G-signed contract, 1990
 
17030
 


Handicapped Access Phase III Waldo Elevator Correspondence, 1990-1991
 
17030
 


Housing Service Building Loading Dock Reroof-signed contract, 1991
 
17030
 


Housing Service Building Loading Dock Roof, 1991-1992
 
17030
 


Strand Ag 111,113 and 113A, 1992
 


Strand Ag.-Admissions, 1991
 
17030
 


Strand Ag. Allocation-Journalism/Photography, Communication Arts, 1991
 


Strand Ag. Allocation-Water Resources, 1992
 
17030
 


Strand Ag. Solutions, 1991-1992
 


Cordley Back-Up, 1989-1991
 


Cordley Hall Solution, 1991-1992
 
17030
 


Weniger Hall Solution, 1991-1992
 


Weniger, 1990-1991
 


Ag. Science Aftermath, 1990-1992
 


Withycombe Exit, 1990-1991
 


Withycombe, 1991
 


Academic Affairs Space Search, 1990
 


Langton Women’s Lockers, 1991
 


Philosophy Dept. Computer Sci. Bldg, 1992
 


Driver Training Trailer, 1992
 


University Computing Steering Committee, 1992
 


Parking Structure, not dated
 


Snell #25/29, 1991
 


Langton Rm. 125 Women’s Gym, 1991
 


Gilmore, 1992
 


Gilmore Annex, 1992
 
17030
 


Gilmore Hits L & M, 1992
 


Education Hall, 1991
 
17030
   
Asia University Relocation to Education Hall, 4th Floor, 1991
 
17030
 
box
59


ELI/Snell Hall, 1991
 


Ballard Hall, 1991
 


Ballard Extension Hall-“College of Agriculture Spacial Analysis”, 1988-1989
 


Oceanography-Ballard Hall, Snell, Strand Ag, 1988
 


Cordley, 1984-1988
 
17030
 


Waldo Hall, 1990
 


Computer Science Building, 1990-1992
 


Oceanography, 1990-1991
 


Computer Science, 1990
 


Women’s Center/Benton Annex, 1988-1991
 


Moreland Hall, 1990
 


Social Science, 1990
 


Family Study Center, 1990
 


Development Office-Snell Hall, 1990-1991
 


Public Safety, 1991
 


7831 (Repairs-Cordley, Education Hall, Pharmacy), 1988-1990
 


State of Oregon Auditors, 1990-1992
 
60

Dryden Hall, 1991
 


Funding CH2M Hill Building, 1991
   
GBD Family Study Center, 1989-1992
 


Correspondence, 1989-1992
 
8000
 


College of Home Economics, 1989-1992
 
8000
 


Agreement/Supplements, 1989-1990
 
8000
 


Proposal for OSU-Forest Research Laboratory, 1991
 
17030
 


Proposed Architectural/Engineering Services Forest Research Laboratory Renovation, 1991
 


FRL Renovation/AE Selection, 1991
 
8000
 


Howard & Kathleen Meehan Ag Science II Artwork, 1992-1993
 


Howard & Kathleen Meehan, Dixon Artwork, 1991-1993
 
8000
 


Johanson Fine Arts, 1991-1992
 
8000
 


McBride Ralston Correspondence, 1990
 
8000
   
Michael & Lakeman Child Care Center, 1990-1991
 


Agreement, 1991
 
8000
 


Correspondence, 1991
 
8000
 


Supplements/Payments, 1990-1991
 
8000
   
Peterson Kolberg/Forest Research Lab Renovation, 1991-1994
 


Agreement/Supplement, 1991-1992
 
8000
 


Correspondence, 1991-1994
 
8000
 


Payments, 1991-1993
 
8000
   
Settecase Smith Doss Ag Science II, 1987-1991
 


Correspondence , 1991-1993
 
8000
 


Payments, 1988-1990
 
8000
 


Programming, 1987
 
8000
 


Arch Contract/Supplements, 1991
 
8000
 


Settecase Smith Doss/ECE Roof, 1993
 
8000
 


Withycombe Lab Planning Correspondence, 1992-1993
 
7201
 


Withycombe Toilet Remodel, 1993-1994
 
7201
 


Withycombe Hall Laboratory Remodel-signed contract, 1993
 
7200
 
61

Withycombe Lab Remodel, 1993-1994
 
7201
 


Withycombe Toilet Remodel Bids , 1993
 


Carlson/Veit Women’s Bldg 22/24 Correspondence, 1993-1994
 


Carlson/Veit Women’s B. 22/24 Supplement/Payments, 1993
 
8000
 


MU Kitchen Exhaust Hood Analysis, 1992
 
8000
 


Pharmacy-Fume Hoods Study and Preliminary Cost Estimate, 1992
 
17020
 


Moreland-Heating Venting Report/Remedies, 1992
 
8000
 


Carson Correspondence 1992 , 1992-1997
 
8000
 


Carson Supplemental Payments, 1989-1992
 
8000
 


Cordley Piping Consultant Selection, 1992
 
8000
   
DEVCO, 1992-1993
 


Correspondence, 1992
 
8000
 


New Agreement Correspondence July-Dec., 1992
 
8000
 


New Agreement Supplement/Payments, 1992-1993
 
8000
 


1989 Agreement Supplement Payments, 1992-1993
 
8000
 


DEVCO/Industrial Bldg. Correspondence, 1992-1993
 
8000
 


DEVCO/Industrial Bldg. Agreement/Payments, 1992-1993
 
8000
 


Balzhiser & Hubbard 96 Agreement Supp/Pay 96, 1996
 
8000
 


Balzhiser & Hubbard 94 Agreement Supp/Pay 95/96, 1995-1996
 
8000
   
Benchmark Arch, 1995-1996
 


Correspondence through ,  6/30/96
 
8000
 


1996 Agreement Supplement/Payment , 1996
 
8000
 


Supplements/Payments, 1995-1996
 
8000
 
62

Braun Intertec 1994 Agr. Suppl/Pmt , 1996, through 9/30/96
 
8000
 


Braun Intertec 1994 Agr. Suppl/Pmt 1996, 10/1/96 - 12/31 96
 
8000
 


Braun Intertec , 1993-1995
 
8000
 


Carson Correspondence, 1996
 
8000
 


College Inn Mechanical Systems Upgrade, 1995
 


Bexell Accessibility Study, 1995
 


Carson 94 Agreement Supplement/Payment, 1995
 
8000
 


Carson Bekooy Gulick 1994 Agreement Supplement/Payment 1994, 1996
 
8000
 


Carson Supplement/Payments for 1993, 1993
 
8000
 


CH2M Hill Condensate System Supplement/Payments for 1994, 1994
 
8000
 


CH2M Hill Condensate System Supplement/Payments for 1994,  1994
 
8000
 


Cordley Renovation, 1995
 
8000
 


Century West Construction, 1995
 
8000
 


Consulting Services, General 1992-1995
 
8000
 


Engineer Consultants, 1992
 
8000
   
Carson, 1990-1992
 
61

Correspondence,  1991
 
8000
 


New Agreement/Payments, 1991-1992
 
8000
 


Supplement, #1 Pharmacy Piping,  1989-1991
 
8000
 


Supplement, #5 Cordley Chiller,  1990-1992
 
8000
 


Supplemental Payments, 1991
 
8000
 
62

CH2M Correspondence Yearly, 1990-1991
 
8000
 


Energy Consultant Selection, General Consultant Services, 1990
 
8000
 
63

Consultants for Energy Management System Improvements, 1990
 


DEVCO Correspondence, 1990-1992
 
8000
 


DEVCO 1989 Agreement, Payments, 1989-1991
 
8000
 


Methods and Forms Documentation for OSSHE and OSU Facility Condition Analysis, 1990
 


Proposal for Facilities Engineering Services for a Seismic Assessment of the OSU/FCA Buildings , 1990
 


ISES/Facilities Condition Audit, 1989-1990
 
8000
 


James Stephenson, Gladys Valley Artwork, 1993-1995
 
8000, includes photos
 


Jerry Meyer, Theater Artwork, 1993-1994
 
8000, includes photos
 


Mike’s Heating and A/C, 1991-1993
 
8000
 


Campus Development Plan, 1989 Update, 1989
 


Long Range Campus Development Plan Consultant Selection, 1989-1990
 
8000
 


Submittals for OSU Long Range Campus Master Plan Update, 1989
 


Long Range Campus Plan Proposal, 1989
   
Agricultural Sciences II, 1990-1993
 


Project Manual Volume 1, Signed Contract, 1990
 
8000
 


Lighting Problem Review Documents, 1991-1992
 
7200
 


Observation Reports, 1991
 
7200
 


Payments, 1991-1993
 
7200
   
Agricultural Sciences II, 1987-1992
 
64

DDC System, Signed Contract, 1990
 
7200
 


Artwork, 1988-1992
 
7200
 


Change Orders, Jan.-April, 1990-1992
 
7200
 


Contract Correspondence, 1990, 1992-1994
 
7200
 


Building Consultants, 1987
 
8000
 
map/case
*


Schematic Design Phase Approval(with signatures), undated
 
box
65


Grant Application, 1989-1992
 
7200
 


Change Orders, 1990-1992
 
7200
 


Concrete/Steel Tests, 1991-1992
 
7200
 


Proposal for the Construction, 1988
 


Concrete/Steel Tests, 1990-1991
 
7200
 


Contract Correspondence, 1990-1992
 
7200
   
Parker Stadium Storage Bay Enclosure, 1993-1994
 


Signed Contract, 1993
 
7200
 


Bid, 1993
 


General, 1993-1994
 
7201
 


Radial Brick Chimney Removal, Signed Contract, 1994-1995
 
7200, 7201
 
65

Rogers Hall Reroof, Signed Contract, 1994-1995
 
7200. 7201
 
65

Sackett/Nash Parking Improvements, Signed Contract, 1994
 
7200
 
66

Strand Ag. Room 106 Remodel, 1993
 
7201
 


Strand Hall Rooms 107/109 Renovations, Signed Contract, 1993
 
7200
 


Strand Ag. Rooms 107/109 Remodel, 1993-1994
 
7201
 


1994 Street and Parking Lot Pavement Patching, Signed Contract, 1994
 
7200
 


1994 Street and Lot Patching, 1994-1995
 
7201
 


Weatherford Dining Cooling Improvements, Bid and Signed Contract,, 1994
 
7200
 


Weatherford Dining A/C, 1994
 
7201
 


Bid for Weniger Hall 118-122 A/C, 1993
 
7200
 


Sackett/Nash Parking Improvements Project, 1993-1995
 
7201
 


Weniger Hall 118-122 A/C, Signed Contract, 1993-1994
 
7201
 


Weniger Operation and Maintenance Manuals, 118-122 A/C, 1994
 
7201
 


Base Bids - Service Master, 1992
 
4 folders
11200
 
67

Base Bids - Service Master, 1991-1993
 
7 folders
11200
 


Gill Coliseum Elevation Repairs, Signed Contract, 1996-1997
 
7200
   
Horse Barn Addition, 1994-1996
 


Bids, 1995
 
7200
 


General, 1995-1996
 
7200
 


Signed Contract, 1994-1995
 
7200
 
67

Housing Buildings Stair Tower Repairs, Signed Contract, 1996
 
7200
 


Housing Stair Cracks, 1995-1996
 
7200
   
Langton Hall Masonry Restoration, 1993-1996
 
67

General, 1993-1996
 
7200
 


Signed Contract, 1993
 
7200
 


Langton Hall Room 300 Painting, Signed Contract, 1996
 
7200
 
67

Langton Gym Painting, 1996-1997
 
7200
   
Milam Hall Third Floor Remodeling, 1995-1996
 
67

Bids, 1995
 
7200
 


Project Manual, 1995
 
7200
 
68

Milam 3rd floor Remodel (pulled drawing), 1995-1996
 
7200
 


Nash Cornice Repairs, 1996
 
7200
 


Oregon State University Oceanography Administrative Building, 1994
 
7200
 


Oregon State University Ocean Administration Building Repipe, 1996
 
7200
 


Oceanography Warehouse Building Reroof, 1995-1997
   
Star Café (Memorial Union), 1994-1995
 
68

General, 1994-1995
 
7200
 


Correspondence, 1995
 
7200
 


Payments/Change Orders, 1995
 
7200
 


Strand Hall Reroofing/Cornice Restoration,, 1993-1997
 
7200, 7201
 


Strand Hall Reroofing and Cornice Repair-signed contract, 1994
 
7200
 


Strand Roof Clarification Requests & Change Order Quotes, 1994
 
7201
 


Strand Remodels, Planning Correspondence, 11993
 
7201
 


Valley Football Center Water Heater Replacement-signed contract, 1995
 
7200
 
69

Valley Football Center Water Heater Replacement, 1995
 
7200
 


Veterinary Research Lab Reroof-signed contract, 1994
 
7200
 


Veterinary Research Lab Reroof and Animal Resource Center Repair, 1994
 
7200
 


Withycombe Hall Laboratory Remodel, 1993
 
7200
 


Withycombe Toilet Room Remodel-signed contract, 1993
 
7200
 


Women’s Building 6/7 Remodel (Research Lab) includes signed contract, 1993-1994
 
7201
 


Gordon & Associates Supplements Seed Lab, 1989-1990
 
8000
 


HMSC Library Consultant, 1989
 
8000
 


James Graham Architects, 1978-1989
 
8000
 


Larry Kirkland Architects, 1987-1988
 
8000
 


Mechanical Consultant Selection, 1988-1989
 
8000, 17020
 


Northwest Engineering, 1989
 
8000
 


Paraclete Engineering Agreement, 1989
 
8000
 


Parker Stadium Architect Selection, 1989
 
8000
 


Parking Structure Consultant Selection, 1987-1988
 
8000
 


Peterson Engineering. Correspondence, 1989
 
8000
 


Sahara Corvallis Partnership (CH2M Hill Bldg), 1990
 
8000
 


Sera Architects, 1988
 
8000
 
9

Settecase/Smith/Doss Ag. Science II Correspondence, 1987-1988
 
17020
   
TBG/Fish Disease Lab, 1987-1989
 
69

Payments, 1989
 
8000
 


Correspondence, 1987-1989
 
8000
   
Benton Hall Room 303, 1991
 


Renovation-signed contract, 1991
 
8000
 


Remodel, 1991
 
17030
   
Child Care Center, 1988-1992
 


Change Orders, 1991
 
17030
 


Concrete/Steel Tests, 1991
 
17030
 
70

Payments, 1991-1992
 
17030
 


Contract, 1991-1992
 
17030
 


Planning Correspondence, 1988-1990
 
17030
 


Signed contract, 1990
 
17030
 


Planning, 1990
 


Contract Correspondence, 1990-1991
 
17030
 
71

Electrical and Computer Engineering Building (ECE) Roof Modifications, 1993-1995
 


ECE Building Roof Modifications, 1992
 
Signed Contract
 


Above Ground Fuel Tanks Phase II-Piping, 1993
 


Fuel Tank Piping, 1993
 


Project Proposal: Above Ground Fuel Storage Tank, Phase III, 1995
 
72

Fuel Storage Tanks Phase III (Piping) , 1993-1995
 


Fuel Tanks (Planning Correspondence), 1993
 


Gill Coliseum Parking Lot Repair, 1995
 
Signed Contract
 


Gill Coliseum Parking Lot, 1995-1996
 
72

Gill Coliseum & Heating Plant Parking Lot Repair, 1995
 
Signed Contract
 


Heat Plant Parking Lot, 1995
 


Kerr Library Roof Repair, 1995
 


Kerr Library Roof Repair, 1995
 
Signed Contract
 


Animal Resource Center Capital Repair, 1994
 
Project Manual
 


Animal Resource Center Reroof, 1994-1996
 
7200
 


Rogers/Snell Hall Elevator Up-Grade, 1994
 
Signed Contract and Correspondence
 


Sackett Hall Water Heater Installation, 1994
 
Signed Contract and Correspondence
 


Shop Buildings Reroof, 1995-1996
 
Signed Contract and Correspondence
 


Street and Parking Lot Pavement Patching, 1995-1996
 
7200
 
72

Benton Slope Irrigation, 1995-1996
 
Signed Contract and Correspondence
 
72

Boiler Chimney Stack InstallationBoiler Chimney Stack Installation, 1994-1995
 
Signed Contract and Correspondence
 
73

Condensate Return System, 1994
 


Cordley Hall Piping Replacement, 1994-1995
 


Dixon Recreation Center Reroof, 1993-1995
 
Signed Contract and Correspondence
 


Dryden Hall Piping Replacement, 1993-1994
 
Signed Contract and Correspondence
 


Horn Barn/Riding Arena Reroof Project, 2000-2001
 


Hyslop Farm Hoods, 2001
 


Kerr Admin. Lobby, 2001
 
74

Kidder Hall Reroof,, 1999-2000
 
Project Manual and Correspondence
 
74

Langton Hall HVAC—Rebid, 1998-2000
 
Signed Contract and Correspondence
 


McNary Dining Hall Phase III (Cont., 2000-2001
 
Project Manual and Correspondence
 


Owen Hall Data Cabling, 2000
 


Peavy Hall Telecommunications Wiring Systems and Rebid, 2000-2001
 
74

Reser ADA Phase II Upgrade, 2001-2002
 


Pharmacy Bldg Third Floor Classroom Remodel Project, 1999
 
Signed Contract
 
74

Sackett Hall Reroof & Waterproofing Project, 1999
 
Signed Contract and Project Manual
 


Snell Hall 5th Floor Remodel, 2000-2001
 
Signed Contract and Correspondence
 


Social Science Building Access, Walk & Related Site Improvements, 2000
 
75

Laboratory Strong Floor-Hinsdale Wave Lab, 2001-2002
 
Signed Contract and Correspondence
 


Wiegand Entrance Canopy Repair, 1999-2000
 
Signed Contract and Project Manual
 


Weniger Hall 3rd Floor Remodel, 2000-2001
 
Signed Contract and Correspondence
 


Women’s Bldg Basement Remodel Project, 1999-2000
 
Signed Contract and Correspondence
 


Women’s Bldg Lighting Upgrade, 2000-2001
 
Signed Contract and Correspondence
 


Crop & Soil Sciences Bldg Lab Remodel Rooms 242, 246;, 1999-2000
 
Signed Contract and Project Manual
 


Cordley Hall 4th Floor Remodel, 2000-2001
 
Signed Contract and Correspondence
 


Cordley Hall 5th Floor Remodel, 1999-2000
 
Signed Contract, Project Manual, Correspondence, and Submittals
 
76

Gill Coliseum Room 132 Remodel, 2000-2001
 
Signed Contract and Correspondence
 


Graf Hall Piping Replacement, 2000-2002
 
Signed Contract and Correspondence
 


House Sites Restoration, 1999-2000
 
Signed Contract and Correspondence
 


Pharmacy 3rd Floor Classroom, 1999
 
124

Contract Insurance Reports (7100 series), 1987-1994
   
Advertised Construction (7200 series), 1993-2002
 


Administrative Services Lobby ADA Renovation
 


Batcheller Hall Cornice Repair
 


Book Storage Shelving Construction
 
124-125

Dearborn Motor Pool Test Facility
 
125

Finley Hall Piping Rehabilitation, 2001-2002
 


West Hall Remodel, 1996-1998
 


LaSells Stewart Center Reroof, 1997
 


Sackett Hall Fire Alarm System, 1997
 


Sackett Hall Reroof, 1997
 


15th and Washington Parking Lot, 1997
 


26th Street Reconstruction, 1997-1998
 
126

Administration Building Roof Repair, 1996-1997
 


Peavy Hall Field Irrigation, 1996-1997
 


President's Residence, 1996-1997
 


Radiation Center Parking Reconstruction, 1995-1996
 


Street and Parking Lot Pavement Patching, 1996
 


Women's Field Irrigation, 1994-1996
 


Withycombe Hall Reroof, 1995-1998
 


Strand Hall Classroom Retrofit, 1993
 


Langton Hall HVAC Upgrade, 1996
 


Education Hall Exterior Restoration Phase I and II, 1994-1995
 
127

Fairbanks Hall Exterior Restoration, 1993-1996
 


Fish Hawk Creek Bridges, 1996-1997
 


McAlexander Fieldhouse - New Ventilation System for ROTC Target Range, undated
 


Forestry Research Lab Chemical Storage, 1995-1998
 


Forest Research Office Addition, 1995-1996
 


East Greenhouse Parking Lot Upgrade, 1996
 


Dixon Recreation Center Renovation - Package 1
 
128

Forest Ecosystem Research Lab (FERL) Biological Waste Tanks
 


Forest Research Lab Reroof
 


Gilmore Hall Fire Escape Replacement
 


Hatfield Marine Science Center Exhibit Lighting
 


Magruder Hall I.V. Support
 


McNary Hall Remodel Phase
 


Rowing Tank
 


Weniger Hall 5th Floor Air Conditioning
 


Education Hall Entry Canopy
 


Graf Hall Room 101 Remodel
 


Snell Hall Roof Repair
 


Withycombe Hall Sitework - Parking Lot
   
Architects and Engineers (8000 series), 1994-1996
 
129

Walker and Macy - Long Range Plan
 


Strand Classroom Remodel Architect Selection
 


Devco: Structural Evaluation of Exterior Wall Cracks - Callahan, Wilson, McNary Halls
 


Devco: 1992 Agreement Supplement/Payment, 1995
 


Devco: 1994 Agreement Supplement/Payment, 1994-1996
 


Devco: 1996 Agreement Supplement/Payment, 1996
 


Devco: Correspondence, 1995
 


Devco: New Agreement Correspondence, 1994
 


Brown and Caldwell: Proposal for Engineering Design Services for Memorial Union Sanitary Sewer Repair
   
Contract Proposals and Statements of Qualifications, 1993-1995
 
130

Forest Ecosystem Research Laboratory, 1994
 


University Housing and Dining Renovation, 1995
 


Women's Crew Team Locker Room and Boat House Facility, 1994
 


Memorial Union West Wing and Commons Renovation, 1993
   
Closed Project Files, 1993-1995
 
Documentation with contracts and project acceptance forms.
 
131

Women's Building ADA Upgrade
 


Radiation Center Parking Reconstruction
 


Agricultural Sciences II DDC System
 


McAlexander Fieldhouse Painting and Roof Recoating
 


Environmental Computing Center
 


Dryden Hall Pipe Replacement
 


Burt Hall Pipe Replacement I and II
 


Batcheller and Covell Halls Reroof
 


Langton Hall Masonry Restoration
 


Milam and Strand Halls Storms Sewer
 


Administrative Services Lobby Revisions
 


Strand Hall Rooms 107 and 109
 


Cordley Hall Pipe Replacement
 


Women's Building Room 6/7 Remodel
 


Strand Hall Reroof and Cornice Repair
 


Campus Condensate Return System Replacement Phase I
 


Sacket and Nash Parking Improvements
 


Coleman Field Parking Improvement
 


Parker Stadium Grandstand Seating
 


Lab Animal Resource Repairs
 


Property Administration Building
 


Radial Brick Chimney Removal
 


Boiler Stack Installation
 


Star Cafe Remodel
 


Langton Hall ADA Upgrade
 


Fish Disease Lab Office Upgrade
 


Office Lab at SOES
 


Dry Cow Barn - Dairy Center

 

Series III:  Building Specifications and Reports, 1909-2003

12 cubic feet, including 8 photographs15 boxes and 1 map folder
Series III consists of building specifications for construction and renovation of various OSU buildings and structures and reports regarding campus planning, proposed structures, campus traffic flow, building accessibility for the disabled, and planning reports by the City of Corvallis. Building specifications for the construction of numerous campus buildings in the 1950s through 1970s are included, such as the residence halls, Cordley Hall, Dixon Recreation Center, Kerr Library, Nash Hall, Peavy Hall, the Radiation Center, Rogers Hall, Snell Hall, the Veterinary Medicine teaching hospital, Weniger Hall, and Wilkinson Hall. The series also includes specifications for several structures completed in the 1920s and 1940s, such the Dairy, Horse, and Sheep Barns; Covell Hall, Gill Coliseum, and Sackett Hall. This series includes the 1909 campus plan by the Olmsted Brothers landscape architects.
 
 
Container(s)
Description
   
Individual Campus Buildings, 1952-1987
   
Administration Building (Kerr), 1967-1971
 
box
77


Schematic Design Study, undated
 
Hewlett and Jamison, architectural firm
 


Cost Study for Proposed Administration Building, 1967
 
Oregon State Board of Higher Education
 


Sanitary Sewer Extensions, 1970
 
Oregon State Board of Higher Education
 


Agreements and Receipts for Administration Building Furnishings/Hardware, 1971
 


H. J. Andrews Experimental Forest Administrative Site, 1980
 
OSU Planning and Institutional Research
   
Apperson Hall, 1963-1986
 


Feasibility Study for Apperson Hall, 1963
 
Bear, McNeil, Schneider, Bloodworth, & Hawes; Architects
 


Apperson Hall & Merryfield Hall Alterations, 1986
 
Jeppsen, Miller, & Tobias, Architects
   
Arnold Hall, 1968-1970
 


Arnold Hall Cafeteria - Specifications, 1970
 
Bear, McNeil, Bloodworth, & Hawes, Architects
 


Arnold Hall - Cafeteria , 1968
 
Bear, McNeil, Bloodworth, & Hawes, Architects
 


Avery and Dixon Houses - Specifications, 1965
 
Architects Hamlin & Martin
 


Azalea House - Specifications, 1952-1953
 
Gathercoal & Jeppsen Architects
   
Batcheller Hall, 1986-1987
 


Alterations: Project Manual, 1986
 


Cornice Restoration and Benton Hall Re-roofing and Exterior Repairs, 1987
 
Soderstrom Architects
 


Benton Hall Feasibility Study, 1964
 
Bear, McNeil, Schneider, Bloodworth & Hawes Architects
 


Bexell Hall Heating Control Study, 1974
   
Bloss Residence Hall , 1968-1971
 


Unit No. 3 Complex A- The Presidents’ Complex, 1968
 
Bear, McNeil, Bloodworth, & Hawes, Architects
 


Specifications, 1970
 
Bear, McNeil, Bloodworth, & Hawes, Architects
 


Specifications for Interior Furnishings and Installation, 1971
 
Bear, McNeil, Bloodworth, Hawes & Peterson, Architects
 


Buxton Hall Dormitory Unit #4 - General Specifications and those for Built-In Furniture and Interior Furnishings, 1961
 
3 reports - Burns, Bear, McNeil, & Schneider, Architects
 


Cauthorn Hall Lounge Alterations- Specifications, 1966
 
Bear, McNeil, Schneider, Bloodworth, & Hawes, Architects
 


Clark (Meats) Laboratory - Specifications, 1966
 
Jeppsen & Miller, Architects
 


Computer Science Building Alterations, 1986
 
Jeppsen, Miller & Tobias, Architects
   
Cordley Hall, 1956-1965
 


First Addition to Cordley Hall-Specifications, 1965
 
2 reports-Bear, McNeil, Schneider, Bloodworth and Hawes, Architects
 


Agricultural & Biological Science Building (Cordley)- Specifications, 1956
 
Burns, Bear, McNeil & Schneider Architects
 
78

Cordley Hall First Addition, Application for Grant Higher Education Facilities Act of 1963 , 1967
 
Oregon State System of Higher Education
 


First Addition and Second Addition to Cordley Hall, 1962
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects, 1 photo of First and Second Addition
 


Exhaust and Cross Contamination Study: Cordley Hall Unit I, Gilbert Hall, and Weniger Hall, 1973
 
(Morrison, Funatake & Associates, Inc.) (7 photos of pipes and wires
   
Crew (rowing) Facility, 1964-1986
 


Specifications, 1964
 
Oregon State System of Higher Education
 


Crew Shell/Shelter Shop, 1986
 


Crop Science Building , 1979
 
Martin, Schultz & Geyer, Architects
 


Dairy Center - Specifications , 1968
 
Zaik and Miller, Architects
   
Dearborn Hall, 1974-1986
 


Dearborn Hall Alterations, 1986
 
Jeppsen, Miller & Tobias, Architects
 


Dearborn Hall Renovation, 1974
 
Farnham and Oliver Architects
   
Dixon Recreation Center , 1970-1973
 


Building Program, 1970-1973
 
Planning and Institutional Research
 


Preliminary Specifications, 1972
 
Balzhiser, Longwood, Smith, Paul, and Anderson, Architects
 


Intramural/Recreation Building Specifications, 1973
 
, Longwood, Smith, Paul and Anderson, Architects and Planners
 


Dormitory Services Building-Specifications, 1960
 
Burns, Bear, McNeil, & Schneider, Architects
 


Education Hall Exterior Wall Waterproofing, 1964
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
   
Electrical and Computer Engineering Building, 1985-1986
 


Project Manual Volumes I-II, 1986
 
Settecase, Smith, and Doss, Architects
 


Electrical and Computer Engineering Building Solar Energy Analysis of Central Atrium with Glazed Roof, 1986
 
Gregory Acker, Architect
 


Electrical and Computer Engineering Building Program, 1985
 
Office of Planning and Institutional Research
 


Environmental Fluid Dynamics Laboratory Building Specifications, 1972
 
State Board of Higher Education
 


Fairbanks Hall Feasibility Study, 1963
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
   
Family Study Center (Bates Hall), 1962-1990
 


Design Program and Description, 1962
 
Jeppsen and Miller, Architects
 


Building Program, 1988
 
Prepared for the College of Home Economics by Ray Glass
 


Design Development Proposal, 1989
 
2 folders
GBD Architects
 


Project Manual for Family Study Center, 1990
 
GBD Architects
 


Farm Crops Building Feasibility Study, 1964
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
   
Finley Residence Hall, 1965-1966
 


Residence Hall Proposal and Design, 1965
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Residence Hall Specifications, 1966
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 
79

Food Toxicology and Nutrition Lab - Specifications for Concrete and Plumbing Work for Trout Hepatoma Laboratory, 1963
 
(P. Daniel Read, Architect
   
Gilbert Hall, 1974-1980
 
78

Gilbert Hall Addition, 1978-1980
 
Zimmer, Gunsul, Frasca Partnership, Architects
 


Gilbert Hall Renovation, 1980
 
Zimmer, Gunsul, Frasca Partnership, Architects
 


Feasibility Study, 1974
 
Planning and Institutional Research
 


Building Specifications, 1974
 
Planning and Institutional Research
   
Gill Coliseum, 1966-1984
 
79

Gill Coliseum Additions and Alterations- Project Manual, 1984
 
Settecase, Smith, Doss Architecture
 
78

Review of Existing Structure, 1984
 
CH2M
 


Residence Hall Specifications, 1966
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 
79

Graf Hall Alterations, 1986
 
Jeppsen, Miller, & Tobias, Architects
   
Greenhouse and Service Buildings, 1964
 
78

Specifications: Greenhouse and Service Buildings: West Range Second Unit to 1964 Additions, 1964
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Specifications: Greenhouses & Service Buildings: West Range 1964 Additions , 1964
 
Bear, McNeil, Scheider, Bloodworth & Hawes Architects
   
Hatfield Marine Science Center, 1962-1980
 
79

Presentation of a Site Development Plan for the Yaquina Marine Sciences Laboratory South Beach Site Oregon State University, 1962
 
Cornell, Howland, Hayes & Merryfield
 


State of Oregon Board of Higher Education Contract Documents for the Construction of a Dock and Approach at the Oregon State University Yaquina Bay Marine Sciences Laboratory, 1963
 
Cornell, Howland, Hayes & Merryfield
 


Oregon State University Yaquina Bay Marine Science Laboratory Newport: Preliminary Scheme Prepared for Presentation to the State Board of Higher Education, 1965
 
Cornell, Howland, Hayes, & Merryfield
 


Building Program Marine Science Center Improvements, 1968
 
OSU Planning & Institutional Research
 


Specifications Underground Cable System at Marine Science Center Oregon State University, 1968
 
Office of University Engineer Physical Plant Department
 


Project Program Aquaculture Research Facility, 1977
 
OSU Planning and Institutional Research
 


Newport Research Support Facility National Marine Fisheries Service Northwest & Alaska Fisheries Center: Newport: Construction Documents Phase, 1980
 
Hewlett, Jamison, Atkinson & Luey
 


General Documents and Specifications for Marine Science Center Housing, 1972
 
Hewlett, Jamison & Atkinson, Architects
 


Specifications for Marine Science Laboratory and Service Building, 1963
 
Hewlett & Jamison, Architects
 


Specifications for Meeting/Dining Building, Marine Science Center, 1976
 
Hewlett, Jamison, Atkinson & Luey, Architects
 


Specifications for Marine Science Laboratory and Service Building, 1963
 
Hewlett & Jamison, Architects
 


National Marine Fisheries Service Northwest and Alaska Fisheries Center, Newport Research Support Facility, 1980
 
Hewlett, Jamison, Atkinson & Luey, Architects
   
Hawley Hall, 1958-1959
 
Burns, Bear, McNeil & Schneider, Architects
 
80

Specifications for Men’s Dormitory, Unit “3,” , 1958
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for the Interior Furnishings Women’s Residence Hall and Dining Hall/Men’s Dormitory, Unit “3,” , 1959
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for Built-in-Furniture Men’s Dormitory, Unit “3,” , 1958
 
Burns, Bear, McNeil & Schneider, Architects
 


Heating Plant - Specifications for Central Heating Plant Addition, 1959
 
Burns, Bear, McNeil & Schneider, Architects
   
Hinsdale Wave Research Laboratory, 1972-1987
 


Contract Documents for the Construction of the Oregon State University Environmental Fluid Dynamics Laboratory Concrete Wave Tank , 1972
 
Cornell, Howland, Hayes & Merryfield
 


Project Manual for the O. H. Hinsdale Wave Research Laboratory, West Wing, 1987
 
Settecase Smith Doss Architecture
 


Horse Center - Project Manuals for Proposed Horse Center for Oregon State University, 1971
 
2 reports-Morin, Longwood, Edlund, Architects
 


Kidder Hall - Specifications for 1964 Former Library Building Remodel: Sets 1 and 2, 1964
 
2 reports-Hewlett & Jamison, Architects
   
Lab Animal Resource Center, 1959
 


Specifications for Animal Care Facility, 1973
 
Balzhiser, Longwood, Smith, Paul and Anderson, Architects
 


Animal Care Facilities Specifications Architectural, Structural, Mechanical, Electrical Detail Drawings and Schedules, 1974
 
Balzhiser, Longwood, Smith, Paul and Anderson, Architects
 


Langton Hall - Proposal for Program Analysis and Feasibility for the Addition of a Competition Swimming Pool Facility to Langton Hall, 1975
 
Atelier/Northwest, Architects
   
LaSells Stewart Center, 1979-1980
 


Oregon State University Foundation Cultural and Conference Center, 1980
 
Skidmore, Owings & Merrill, Architects
 


Specifications for Cultural Center, Oregon State University Foundation, Volumes I-II, 1965-1970
 
3 reports-Skidmore, Owings & Merrill, Architects
   
Library Buildings, 1965-1970
 


Specifications for Oregon State University Library, First Addition, 1970
 
Hamlin, Martin& Schultz, Architects
 


New Library Building for Oregon State College, 1965
 
Hamlin & Martin, Architects
   
Memorial Union, 1959-1981
 


Specifications for Memorial Union Remodel, Phase III, 1980
 
Jeppsen, Miller & Tobias, Architects
 


Specifications for General Work: Additions to Memorial Union Building,, 1959
 
Church, Newberry, Roehr and Schuette, Architects
 


Specifications for Mechanical Work: Additions to Memorial Union Building, 1959
 
Church, Newberry, Roehr and Schuette, Architects
 


Specifications for Electrical Work: Additions to Memorial Union Building, 1959
 
Church, Newberry, Roehr and Schuette, Architects
 
81

Specifications for Food Service Equipment: Additions to Memorial Union Building, 1959
 
Church, Newberry, Roehr and Schuette, Architects
 
*

Traffic Flow Pattern (for food service), undated
 
1 map folder
 
81

Specifications for Acoustical Ceiling Commons Room, Memorial Union Building, 1965
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Specifications for Memorial Union Remodel Phase IV, 1981
 
Jeppsen, Miller & Tobias, Architects
 


Specifications for Student Union Facilities, Phase II: Memorial Union Alterations and Additions, 1978
 
Jeppsen, Miller & Tobias, Architects
 


Student Union Facilities: Alterations and Additions, 1976
 
2 folders
Jeppsen, Miller and Tobias, Architects
 


Merryfield Hall and Annex - Feasibility Study for Production Technology, 1964
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Mitchell Playhouse - Feasibility Study for Mitchell Playhouse, 1963
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
   
Nash Hall, 1966-1968
 


Specifications for Bioscience Building for Oregon State University, 1968
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Bio Science Building Specifications, 1966
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
   
National Forage Seed Production Research Center, 1984-1985
 


Mechanical and Electrical Bid Invitation for National Forage Seed Production Research Center, Oregon State University Campus, 1985
 
Moreland, Unruh and Smith, Architects
 


USDA National Forage Seed Production Research Center Conceptual Design, 1984
 
Moreland, Unruh and Smith, Architects
 


USDA National Forage Seed Production Research Center Detailed Facilities Program,, 1984
 
Moreland, Unruh and Smith, Architects
 


USDA National Forage Seed Production Research Center Calculations, 1984
 
Moreland, Unruh and Smith, Architects
 


USDA National Forage Seed Production Research Center 35% Design Submittal, 1984
 
Moreland, Unruh and Smith, Architects
   
Oceanography Building, 1962-1985
 


General Specifications, 1962
 
Jeppsen & Miller, Architects
 


Mechanical Systems Testing and Adjusting Data for Oceanography II Building, 1985
 
Jeppsen, Miller and Tobias, Architects
 


Electrical Specifications for Oceanography Building at Oregon State University, , 1962
 
Jeppsen and Miller, Architects
 


Fixed Equipment Contract - Specifications for Oceanography Building at Oregon State University, 1962
 
Jeppsen and Miller, Architects
 


Mechanical Specifications for Oceanography Building at Oregon State University, 1962
 
Jeppsen and Miller, Architects
   
Orchard Court Apartments, 1960-1963
 


General Contract - Specifications for 1963 Addition to Married Student Housing Project, 1963
 
Jeppsen and Miller, Architects
 


Specifications and Contract Documents: General, Mechanical, and Electrical Work for Married Student Housing Project, 1960
 
Jeppsen and Miller, Architects
 


Orchard Court Community Center - Building Program for Orchard Court Community Center, 1972
 
OSU Planning and Institutional Research
 
82

Ornamental Plants Research Facility - Construction Bids, 1972
 
Administrative Services Division Procurement and Personal Property Management Branch-Contracting Unit
 


Oxford House - Specifications for the Alterations to Oxford House, 1966
 
Dukehart & Kinne, Architects
   
Parker Stadium, 1966-1971
 


Stadium Improvements: Parker Stadium, Oregon State University and Autzen Stadium, University of Oregon, 1969
 
Moffatt, Nichol & Bonney, Inc., Consulting Engineers
 


Parker Stadium Addition, 1967
 
(Donald J. Zarosinski, Consulting Engineer
 


End Zone Corner Seats, Parker Stadium, 1966
 
Donald J. Zarosinski, Consulting Engineer
 


General Documents and Specifications for OSU Stadium Concessions and Ticket Booth,, 1966
 
Hewlett & Jamison, Architects
 


Oregon State University Parker Stadium Parking, 1971
 
Cornell, Howland, Hayes & Merryfield
   
Peavy Hall, 1968-1976
 


Forestry Sciences Laboratory Service Building, 1974
 
U.S. Department of Agriculture - Forest Service
 


Specifications for Forestry Building, Oregon State University, 1969
 
Hamlin, Martin & Schultz, Architects
 


Forestry Sciences Laboratory North Wing, 1970
 
U.S. Department of Agriculture – Forest Service
 


Forestry Sciences Laboratory East Wing, 1972
 
U.S. Department of Agriculture – Forest Service
 


Forestry Sciences Laboratory West Wing, 1975
 
U.S. Department of Agriculture – Forest Service
 


Forest Science Wing Addition - Forest Research Laboratory Oregon State University, 1967
 
Payne & Settecase, Architects
 


Building Specifications for Oregon State University Forestry Building, 1968
 
Hamlin, Martin & Schultz, Architects
 


Solicitation Forms for Forestry Sciences Laboratory North Wing, 1970
 
Pacific Northwest Forest and Range Experiment Station
 


Irrigation System and Landscaping - Forestry Sciences Laboratory, 1976
 
U.S. Department of Agriculture - Forest Service
 


Solicitation Forms for Forestry Sciences Laboratory East Wing, 1974
 
U.S. Department of Agriculture - Forest Service
 


Solicitation Forms for Forestry Sciences Laboratory West Wing, 1975
 
(U.S. Department of Agriculture - Forest Service
 


Solicitation Forms for Forestry Sciences Laboratory Service Building,, 1970
 
Pacific Northwest Forest and Range Experiment Station
 


Solicitation Forms for Forestry Sciences Laboratory, 1976
 
U.S. Department of Agriculture - Forest Service
   
Pharmacy Building, 1960-1964
 


Specifications, Alteration and Addition to Pharmacy Building, 1964
 
Herman Brookman, Architect
 


Alteration and Addition to Pharmacy Building, 1960-1962
 
Herman Brookman, Architect
   
Physical Plant, 1968-1986
 


Physical Plant Shops Alterations Project Manual, 1986
 
Jeppsen, Miller & Tobias, Architects
 


A Resume of the Physical Plant Operation at Oregon State University, 1968
   
Plageman Hall, 1960
 


General Contract: General, Mechanical, and Electrical Work for Additions and Alterations to Student Health Service Building, 1960
 
Chris Jeppsen, Architect
 


Electrical Contract: General, Mechanical, and Electrical Work for Additions and Alterations to Student Health Service Building, undated
   
Poling and Cauthorn Residence Halls, 1956
 
83

Specifications for Men’s Dormitory Units A & B and Cafeteria, 1956
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for Kitchen Equipment in Men’s Dormitory A & B and Cafeteria, 1956
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for Interior Furnishing for Men’s Dormitory Units A & B and Cafeteria, , 1956
 
Burns, Bear, McNeil & Schneider, Architects
 


Electrical Specifications for Men’s Dormitory Units A & B and Cafeteria, 1956
 
cBurns, Bear, McNeil & Schneider, Architects
 


General Specifications for Men’s Dormitory Units A & B and Cafeteria, 1956
 
Burns, Bear, McNeil & Schneider, Architects
   
Radiation Center Building, 1962-1986
 


Specifications for Nuclear Reactor Addition to the Radiation Center, 1965
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Oregon State University TRIGA Reactor Annual Report, 1982
 


Oregon State University TRIGA Reactor Annual Report, 1984
 


Oregon State University TRIGA Reactor Annual Report, 1986
 


Design of Radiation Center Building, 1962
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Modification of Agreement between General Dynamics Corporation and State Board of Higher Education, 1965
 
Oregon State Board of Higher Education
 


Contract with General Atomic for Purchase of TRIGA Mark II Nuclear Reactor, Oregon State University, 1965
 
Oregon State Board of Higher Education
 


TRIGA Mark II Reactor General Specifications and Description, 1964
   
Residence Hall Quadrangle, 1965-1972
 


Feasibility Study of Lounge and Office Arrangements in Residence Hall Quadrangle, 1965
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


Program for Feasibility Study - Quad Residence Halls, 1972
   
Rogers Hall, 1959-1966
 


General Specifications for Mechanical Engineering Building, 1966
 
Wilmsen, Endicott & Unthank, Architects
 


Analysis of Design for the Mechanical Engineering Building, 1959
 
Wilmsen, Endicott & Unthank, Architects
   
Snell Residence Hall, 1958-1984
 


Specifications for Kitchen Equipment in Women’s Residence Hall and Dining Hall, 1958
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for Built-in-Furniture for Women’s Residence Hall and Dining Hall, 1958
 
Burns, Bear, McNeil & Schneider, Architects
 


Oregon State University Foundation Furniture Specification and Bidding Instructions: Departmental Space Requirements Study, Need Assessment, and Design Development Report, 1984
 
Jeppsen, Miller & Tobias, Architects
 


Specifications for Women’s Residence Hall and Dining Hall, 1958
 
Burns, Bear, McNeil & Schneider, Architects
   
Spring Sports Complex, 1971-1973
 


Contract Documents for the Construction for Oregon State University Spring Sports Complex, 1973
 
Cornell, Howland, Hayes & Merryfield
 


Oregon State University Spring Sports Complex, 1972
 
(Oregon State Board of HigherEducation
 


Program for Conceptual Study of Spring Sports Complex at Oregon State University, 1971
 
Office of Planning and Institutional Research
 


Squaw Creek Fish Culture Facilities - Building Specifications, 1971
 
Planning and Institutional Research
 


Feasibility Study for Agricultural Hall, Strand Hall, 1963
 
Bear, McNeil, Schneider, Bloodworth and Hawes Architects
 


Student Cooperative Housing, Master Site Study, 1964
 
Hamlin and Martin Architects
   
Veterinary Medical Teaching Hospital, 1977-1979
 


Veterinary Medical Teaching Hospital, 1978
 
Payne, Settecase, Smith and Partners Architects
 


Proposed Veterinary Medical Teaching Hospital-Clinic, 1977
 
Office of Planning and Institutional Research
 


Electrical Construction Specifications for the Veterinary Medical Teaching Hospital, 1979
 
Payne, Settecase, Smith & Doss, Architects
 


Mechanical Construction Specifications for the Veterinary Medical Teaching Hospital, 1979
 
Payne, Settecase, Smith & Doss, Architects
 


General Construction Specifications for the Veterinary Medical Teaching Hospital, 1979
 
Payne, Settecase, Smith & Doss, Architects
   
Veterinary Medical Isolation Laboratory, 1968-1973
 
84

Building Program for Veterinary Isolation Facility, 1968
 
Office of Planning and Institutional Research
 


Proposed Changes to Animal Disease Research Isolation Facility Contract, 1973
 
Neil Farnham, Architect
 


Addendum No. 1 - Animal Disease Research Isolation Facility, 1973
 
Neil Farnham, Architect
 


Specifications for Oregon State University Animal Disease Research Isolation Facility, 1973
 
Neil Farnham, Architect
 


Waldo Hall - Feasibility Study for Waldo Hall, 1963
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
   
Water Research Demonstration Laboratory - State of Oregon Board of Higher Education , 1965
 


Contract Documents for the construction of a Water Research Demonstration Laboratory, 1965
 
Cornell, Howland, Hayes & Merryfield, Architects
   
Weatherford Hall, 1965-1972
 


Remodeling Program for West Wing of Weatherford Hall, 1972
 
Office of Planning and Institutional Research
 


Rehabilitation Study of Weatherford Hall, 1965
 
Blair & Zaik, Architects
   
Weniger Hall, 1958-1980
 


Mechanical Systems Testing and Adjusting Data for Weniger Hall North and Weniger Hall South, 1978
 
Burns, Bear, McNeil & Schneider, Architects
 


Mechanical System Investigation of Weniger Hall, 1980
 
Morrison, Funatake, Inouye, Andrews, Inc. Consulting Engineers
 


General Specifications for Addition to Physics Chemistry Building, 1960
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for 1965 Alterations to Physics Chemistry Building for Meteorology and Bio-Physics, 1965
 
Bear, McNeil, Schneider, Bloodworth & Hawes, Architects
 


General Specifications for Physics Chemistry Building, 1958
 
Burns, Bear, McNeil & Schneider, Architects
   
West Hall, 1959-1960
 


Specifications for Kitchen Equipment in Dormitory Unit #5 and Cafeteria, 1959
 
Burns, Bear, McNeil & Schneider, Architects
 


Specifications for the Interior Furnishings in Dormitory Unit #5 and Cafeteria, 1960
 
Burns, Bear, McNeil & Schneider, Architects
 


General Specifications for Dormitory Unit #5 and Cafeteria, 1959
 
Burns, Bear, McNeil & Schneider, Architects
 


Dormitory Unit “5" and Cafeteria for Oregon State College, 1959
 
Burns, Bear, McNeil & Schneider, Architects
 


Wiegand Hall - Mechanical Systems Testing and Adjusting Data for Wiegand Hall, 1977
 
Morrison, Funatake & Assoc., Engineers
   
Wilkinson Hall, 1970-1973
 


Earth Sciences Addition, 1971
 
Jeppsen, Miller and Tobias, Architects
 


Mechanical Systems Testing and Adjusting Data for Earth Sciences Addition, 1973
 
Jeppsen, Miller and Tobias, Architects
 


Proposal for a Graduate Science Facilities Grant for the Earth Sciences Building, 1970
 
Office of Planning and Institutional Research
 


Withycombe Hall - Withycombe Hall Valve Chart, undated
   
Multiple Building Projects, Campus Plans, and non-OSU Structures, 1909-1992
 


Adult Student Housing (ASH) Project, 1972
 
2 reports-HUD funded 170-unit housing project built on Witham Hill Drive in NW Corvallis, but not managed by OSU
 


Agricultural Science Complex, 1969
 
Hamlin, Martin & Schultz, Architects
 


Agricultural Science I - Building Program for Agricultural Science at Oregon State University, 1968
 
Office of Planning and Institutional Research
 


A Brief Historical Resume of OSU’s Long Range Physical Development Plans, circa 1985
 


Campus Landscape Maintenance Planning Report, 1980
 
Department of Architecture and Landscape Architecture
 


Campus Outdoor Lighting Plan for Oregon State University, 1971
 
Donald Hearing and Stanley Reed, Engineering & Design Associates
 


Campus Outdoor Lighting Plan for Oregon State University, 1979
 
Ray Loofburrow and Stanley Reed, Engineering & Design Associates
 


Capital Construction Priorities, 1968
 
Oregon State Board of Higher Education
 


Carpets in Residence Hall Corridors - Contract Document, 1969
 
Office of University Engineer
 
85

Community Center Conceptual Study Program, 1971
 


Condensate Return Lines Corrosion Study, 1984
 


Creating the Future: A Plan for Beginning the 90's, 1990
   
Electrical Distribution System and Facilities Reports, 1971-1979
 


Long Range Study of Primary Electrical Distribution Facilities for Oregon State University, 1971
 
Stanley Reed and Michael Unger, Engineering & Design Associates
 


Proposed Additions Electrical Distribution System 1973-75 Biennium, 1987
 


Proposed Additions Electrical Distribution System 1973-75 Biennium, 1980
 


Review of Electrical Distribution System Capacity and Loads for Oregon State University, 1979
 
Stanley Reed and Michael Unger, Engineering & Design Associates
 


Fire Alarm Study, 1971
 
Morrison, Funatake & Associates, Inc., Consulting Engineers
   
Handicapped accessibility studies, 1975-1986
 


Specifications for the Removal of Architectural Barriers to the Handicapped in Various Buildings at Oregon State University, 1981
 
Stastny & Graham, Architects
 


Handicapped Accessibility Phase II and Electrical and Computer Engineering Building Project No. 2: Related Alterations Handicapped Accessibility, 1986
 
Stastny Architects
 


Removal of Architectural Barriers work Location Reference, 1980
 
Office of Planning and Institutional Research
 


Removal of Architectural Barriers to the Handicapped in Various Buildings at Oregon State University: Report of Facility Survey and Recommendations for Facility Improvements to Improve Program Accessibility, 1975-1976
 
2 reports- Atelier/Northwest, Architects)
 


Kansas State University’s Six University Study, 1985
 
Office of Budgets
 


Oregon State University Academic Planning and University Policies, 1962
 


Oregon State University Administrative Cost/Structure Assessment-Final Report, 1992
 


Oregon State University/Heritage Annexation, 1982
 
Paul Green & Associates, Inc., Engineers & Land Surveyors
 


Oregon State University Long Range Development Plan, 1964
 


Oregon State University Physical Development Plan, 1987
 


Oregon State University Space Utilization Studies, 1972-1985
 
3 folders
OSSHE
 


Physical Facilities Inventory-Revisions to Section E, 1991
 


Physical Plant Repairs and Incidental Improvements for Four-Year Period 1939- 40 to 1942-43, 1939
   
Physical Plant Studies, 1986-1989
 


Marking Stairs for Visually Impaired, 1989
 


Impact of Resource Allocation Policies on Universities Chemistry Research Laboratories, 1986
 
University of Michigan and Cornell University
 


Planning and Procedures Handbook for Campus and Building Development, 1970
 
86

Program for Feasibility Study of University Union Facilities, 1972
 
Office of Planning and Institutional Research
   
Re-roofing Investigations and Repair Proposals, 1983
 


Re-roofing Investigation for Nash Hall, Navy R.O.T.C. Building, and Women’s Building, 1983
 
Martin, Soderstrom & Matteson, Architects
 


Re-roofing Investigation for Memorial Union Building and McAlexander Fieldhouse, 1983
 
Martin, Soderstrom & Matteson, Architects
 


Waterproofing Proposals for Women’s Building and Gill Coliseum, , 1983
 


3-M Roofing Specifications for Oceanography Building, 1983
 


3-M Roofing Specifications for Armory Roof, 1983
 


Report on Oregon Agricultural College (text/html) , 1909
 
Olmsted Brothers- Landscape Architects
 


Sewer Utility Study Part A Program Development, 1979
 


Steel Waterline Replacement, 1982-1987
 


Subsurface Soils Data, 1967
 
Shannon & Wilson, Inc., Soil Mechanics and Foundation Engineers
 


Tour of Facilities-School of Agriculture (Phases I and II), 1980
 
Facilities Planning and Use Committee
 


Traffic Study - Corvallis Area Transportation Study, Transportation Plan 1985 Interim Report, 1969
 
Technical Advisory Committee, U.S. Department of Transportation Bureau of Public Roads, and Department of Housing and Urban Development
 


Transition Plan, 1978
 
Office of Planning and Institutional Research
 


Transportation, Circulation and Parking-OSU, 1983
 
Carl H. Buttke, Inc.-Consulting Transportation Engineer
 


Utilities Survey (2 reports), 1959
 
phrase
 


Utility Tunnel Extension , 1969
 
W. Bruce Morrison and Associates, Inc., Consulting Engineers
   
Corvallis Development Projects and Planning Reports and Studies, 1967-1988
 


Community Center Plan, Corvallis Oregon, 1967
 


Sewer Investigation, Public Works Department, 1975
 


The Corvallis Bypass - Draft Environmental Impact Statement, United States Department of Transportation, 1978
 


Adopted Comprehensive Plan, City of Corvallis, 1978
 


Circle Boulevard - Walnut Boulevard - Draft Environmental Impact Statement, United States Department of Transportation, 1978
 


Circle Boulevard - Public Corridor - Design Hearing Transcript, City of Corvallis, 1979
 


Walnut Boulevard - Draft Environmental Impact Statement, United States Department of Transportation, 1979
 


Public Corridor Design Hearing Transcripts (Walnut Boulevard), City of Corvallis, 1979
 


Land Development Code - Draft for Planning Commission Review, City of Corvallis, 1980
 


The Potential for a Research - Technology Park in Corvallis: A Preliminary Analysis, Oregon District 4 Council of Governments, 1981
 
phrase
 


Contract Documents for the Construction and Improvement of: Madison Avenue Reconstruction - S.W. Sixth St. to S.W. Eleventh St., City of Corvallis, 1981
 


A Research Technology Park in the Corvallis Area an Examination of Feasibility and Options, Oregon District 4 Council of Governments, 1982
 


McKee High Technology Park - Application and Annexation Comprehensive Plan Amendment and Development District Change, Paul and Green Associates, Inc., 1982
 


Sunset Research Park - A Research Technology Park, City of Corvallis, 1983
 


North University Area Plan, City of Corvallis, 1983
 
87

Corvallis Transportation Plan, City of Corvallis, 1983
 
phrase
 


Capital Investment Plan, City of Corvallis: 1988-1993, 1988
 
2 reports- one is proposed
 


Downtown Streetscape Plan: Drafts, 1988
 
2 reports-City of Corvallis
 
88

Plans of Formal Gardens, pre-1940
   
Building Specifications, 1924-1954
 
89

Dairy Barn, 1929
 


Hand Ball Courts Building, 1929
 


Greenhouses, 1927
 


Horse Barn, 1924
 


Pharmacy, 1924
 


Physics Building, 1927
 
Covell Hall
 


Sheep Barn, 1929
 


Women’s Gymnasium Building, 1925
 
Women’s Building
 
88

Chemical Engineering [Gleeson Hall], 1954
 


Experiment Station - Pendleton Field Station, ca, 1929
 


Pavilion, 1948
 
Gill Coliseum
 


Home Economics Building, 1951
 
80

Home Management House, 1948
 
88

Navy ROTC Building, 1945
 
not built
 


Oceanography Building, undated
 
Burt Hall
   
Building Specifications and Bids, 1946-1963
 
90

Animal Industries Building (Withycombe Hall), 1950
 
2 folders
 


Dormitories, 1961-1963
 


Engineering Wing, 1947
 
14 folders
 


Food Technology Building (Wiegand Hall), 1950
 


Home Management House, 1948
 


Industrial Building, 1946
 


Paving Specifications, 1948
 


Pavilion (Gill Coliseum), 1948
 


Poultry Brooder House, 1953
 


Women’s Dormitory (Sackett Hall), 1946-1947
   
Proposed Structures, 1930-1935
 
91

Chemistry Building Costs, 1930-1935
 


Physical Plant Repairs and Incidental Improvements for Four-Year Period 1939/40 – 1942/43, 1939
 
The report includes information about all campus structures including original costs and restoration value as well as some plans and drawings.
 


Memorial Union Long Range Development Planning, 1970
 


OSU Physical Development Plan, 1976
 


OSU Roof Management Plan – Interim Report, 1988
 


Mitchell Playhouse Facilities Evaluation, 1989
 


Facility Condition Analysis for the Administrative Services Building, 1995
 


Orchard Street Structure (Richter House) Removal, 1992
 


Demolition of Building at 2827 Orchard and Restoration of Site, 1992
 


Facilities Services Annual Report for 1997-1998, 1998
 


Campus Development Plan (Draft) for 2000-2010, 2000
 


Campus Master Plan, 2003
 


The 1965-1971 Capital Construction Program of the Dept. of Higher Education (OSSHE) , 1966
 


Building Program Proposed by the State Board of Higher Education, 1961
 
*

Comparative Residence and Dining Hall Information on Construction Methods, Materials, Functional Requirements, Appointments and Areas from questionnaires dated 1959, 1961
 
1 map folder

 

Series IV:  Capital Construction Project Files, 1962-1997

8.5 cubic feet including 6 photographs11 boxes
Series IV documents building construction projects budgeted for $100,000 or more. The Capital Construction Project Files contain bid documentation, correspondence, memoranda, photographs, as well as meeting minutes from the Oregon State System of Higher Education (OSSHE) Building Committee. The bulk of the records in this series pertain to the construction of Burt, Nash, and Peavy Halls and the Bloss and Arnold residence halls. This series includes the 5000 files for several projects in the mid-1990s: dock construction at the Hatfield Marine Science Center; renovations at McNary and Milam Halls; construction of the Property Administration Building; reconstruction of the Industrial Building (Cascade Hall) after the 1992 fire; renovations at Withycombe Hall for the University Theater; and ADA upgrades at Langton Hall and the Women's Building. Additional materials pertaining to these and other capital construction projects are available in Series II, III, and VI.
 
 
Container(s)
Description
 
box
87


Bloss-Arnold Combined, 1971
 


Central Heating Plant Boiler, 1971
 


Peavy Hall, 1971
 


Orchard Court Community Center, 1972
 


Wave Tank, 1972-1973
 


Kerr Library First Addition, 1970-1972
 


Horse Center, 1971-1972
 


Earth Science Building, 1971-1974
 


Hatfield Marine Science Center Housing, 1972-1975
 


East Area Residence Halls-Phase I and II, 1969
 


Milne Computer Center, 1968-1969
 


Milne Computer Center, 1968-1969
 


Oceanography Addition, 1965-1967
 


Nuclear Reactor Addition to Radiation Center, 1972-1975
 


Rogers Hall, 1965-1968
 


Cordley Hall First Addition, 1965-1967
 


Finley Hall, 1965-1967
 
Includes photographs.
 


Utility Tunnel Extension, 1964-1970
 


USDA Forestry Science Lab Services Wing, 1966-1970
 


Administrative Services Building, 1969-1971
 


Crop Science Building, 1980
 


Cultural and Conference Center-LaSells, 1979-1980
 


Gilbert Hall Addition, 1978-1980
 


Pharmacy Building Addition, 1964-1966
 


Hatfield Marine Science Center Oyster Hatchery Addition, 1965-1968
 


Kidder Hall Alterations, 1964-1965
 


Avery and Dixon Lodges, 1965-1966
 


Conversion of Research Vessel Yaquina, 1963-1964
 


Radiation Center, 1962-1964
 


Dormitories Number 7 and 8, 1963-1964
 


Kerr Library Building Construction, 1962-1964
 


McNary Dormitory and Cafeteria, 1962-1964
 


Biosciences Building, 1968-1970
 


Hatfield Marine Science Center-Meeting/Dining Building, 1975-1976
 


Electrical Distribution Facilities, 1970-1974
 


Memorial Way Pedestrian Mall, 1973-1974
 


Dearborn Hall Remodel, 1974-1975
 


Animal Disease Research Isolation Facility, 1973-1975
 


Recreation Center (Dixon), , 1973-1976
 


Animal Care Facility, 1974-1977
 


Spring Sports Complex, 1972-1973
 


Married Students Housing Addition, 1963
 


Conversions of Solariums to Student Rooms, 1963
 


Dairy Center, 1968
 


Newport Research Support Facility, 1980
 


Andrews Experimental Forest Facility Improvements, 1980
 


Golf Course Proposal, 1973-1979
 


Crop Science Building , 1976-1981
 


Aquaculture Research Facility, 1977-1979
 


Memorial Union Phase II Improvements, 1976-1978
 


Yaquina Bay Dorm Facilities, 1968
 


Forest Research Lab Wing Addition, 1968
 


Medical Science Building Cafeteria, 1968
 


Pharmacy Greenhouses, 1964-1965
 


Memorial Remodel Phase IV, 1981-1983
 


Washington Way Tennis Courts Renovation, 1981
 


Veteran Medicine Hospital, 1979-1980
 


Memorial Union Phase III, 1980
 


Parking Improvements, 1980-1981
 


Parker Stadium Turf Replacement, 1984
 
2 folders
 
92

Oceanography Building (Burt Hall), 1965-1974
 
13 folders
 


Bioscience Building (Nash Hall), 1966-1972
 
24 folders
 
89

Bioscience Building (Nash Hall, 1966-1972
 
93

Bioscience Building (Nash Hall), 1968-1972
 
2 folders
 


Forestry Building (Peavy Hall), 1966-1972
 
22 folders
 


Bloss Hall, 1969-1972
 
15 folders
 
89

Bloss Hall, 1969-1972
 
94

Arnold Hall, 1964-1972
 
21 folders
 
119-120

Hatfield Marine Science Center (HMSC) Dock Construction, 1995-1997
 
120-122

Industrial Building Reconstruction, 1993-1996
 
122

McNary Hall Renovations, 1995-1997
 


Milam Hall Renovation, 1997-1998
 
122-123

Property Administration Building, 1994-1995
 
123

Withycombe Laboratory Theater, 1991-1997
 
123-124

Langton Hall and Women's Building ADA Upgrade, 1993-1996

 

Series V:  Facilities Planning and Use Committee Records, 1981-1985

1.25 cubic feet2 boxes
Series V documents the activities of the Facilities Planning and Use Committee and the coordination of campus and facilities planning, room use, and renovation and building construction projects. The records include correspondence, meeting minutes, memoranda, project proposals, and reports. See also Series IX, Committee Records.
 
 
Container(s)
Description
 
box
95


1981-1984
 
20 folders
 
96

1985
 
6 folders

 

Series VI:  General Construction Files, 1989-1997

0.8 cubic foot2 boxes, including 1 oversize box
Series VI documents the design and construction of Bates Hall and the Forest Ecosystem Research Laboratory and consists of budgets, correspondence, memoranda, notes, and reports.
 
 
Container(s)
Description
 
box
96


Family Studies Center (Bates Hall), 1989-1990
 
2 folders
 


Forest Ecosystem Research Laboratory, 1996-1997
 
10 folders
 
113

Forest Ecosystem Research Laboratory Project Schedule, 1996
 
apx 20x24 in.

2 sheets

 

Series VII:  Minor Building Modification Files, 1985-1993

3.5 cubic feet including 108 photographs4 boxes and 1 map folder
The Minor Building Modification Files document building repair and maintenance projects from the mid-1980s through early 1990s and are arranged alphabetically by building name. Several of the files include photographs.
 
 
Container(s)
Description
 
box
97


Administration Building, 1991-1992
 


Apperson Hall, 1991-1992
 


Ballard Extension, 1991-1992
 


Benton Hall, 1991-1993
 


Bexell Hall, 1992
 


Burt Hall, 1991-1993
 
4 folders
 


Campus General, 1989-1993
 
2 folders
 


Cordley Hall, 1991-1993
 
2 folders
 


Crop Science Building, 1992-1993
 


Dearborn Hall, 1992-1993
 


Dryden Hall, 1990-1992
 


Education Hall, 1991-1992
 


Fairplay Office/Laboratory, 1992
 


Family Study Center, 1991-1993
 


Forest Research Lab, 1992
 


Gilbert Hall, 1991-1992
 
98

Gill Coliseum, 1991-1992
 


Gleeson Hall, 1991
 
includes 6 photographs
 


Graf Hall, 1991-1993
 


Green Houses, 1992-1993
 


Ground Water Research Lab, 1991
 


Hazardous Waste Facility, 1991
 


Heating Plant, 1990-1992
 
includes 4 photographs
 


Hinsdale Wave Tank, 1990
 


Hispanic Cultural Center, 1991
 


Hovland Hall, 1992
 


Hyslop Farm Buildings, 1992
 


Industrial Building, 1992
 


Kerr Library, 1991-1993
 


Kidder Hall, 1992-1993
 


Langton Hall, 1991-1993
 


LaSells Stewart Center, 1991-1993
 


Magruder Hall, 1985-1993
 
2 folders
 


McAlexander Fieldhouse, 1985
 


Memorial Union, 1985-1992
 


Merryfield Hall, 1985-1992
 


Milam Hall, 1985-1992
 


Milne Computer Center, 1985
 


Mitchell Playhouse, 1985
 


Moreland Hall, 1985-1992
 


Motor Pool, 1985
 
includes 1 photograph
 


Nash Hall, 1985-1992
 
2 folders
 


Naval Armory, 1985
 


Oak Creek Lab, 1985
 


Oceanography Administration Building, 1985
 


Oceanography Warehouse, 1991-1993
 


Off-Campus Housing, 1992
 


Orchard Street Nursery, 1985
 
includes 2 photographs
 


Parker Stadium, 1985-1993
 
2 folders
includes 3 photographs
 


Parking Lots, 1985-1993
 
includes 3 photographs
 


Peavy Arboretum, 1990-1991
 
99

Peavy Hall, 1985-1993
 
5 folders
includes 64 photographs
 


Pharmacy Hall, 1985-1993
 
2 folders
includes 9 photographs
 


Physical Plant, 1985
 
includes 3 photographs
 


Plageman Infirmary, 1985-1993
 
includes 5 photographs
 


Poultry House, 1992
 


Public Safety Building, 1985
 


Rabbit Buildings, 1985
 


Radiation Center, 1985
 
includes 9 photographs
 


Rogers Hall, 1985
 


Seed Lab, 1985-1992
 
includes 2 photographs
 


Shepard Hall, 1985-1992
 


Snell Hall, 1985-1993
 
includes 3 photographs
 


Social Science, 1985
 
includes 3 photographs
 


Strand Agriculture Hall, 1985-1992
 
2 folders
includes 1 photograph
 
map/case
*


College of Agricultural Sciences Proposed Office Arrangement, 1991
 
1 sheet
 
box
99


Surplus Property Building, 1991
 
includes 3 photographs
 


Vet Diag Lab, 1985
 
includes 3 photographs
 


Vet. Med. Animal Isolation Lab, 1985
 


Veterinary Research Lab, 1985
 


Vocational Shops, 1985
 


Waldo Hall, 1985-1992
 
100

Weniger Hall, 1985-1993
 
3 folders
 


Wiegand Hall, 1985-1993
 


Wilkinson Hall, 1985-1992
 


Withycombe Hall, 1985-1993
 
2 folders
includes 2 photographs
 


Women’s Building, 1985-1992

 

Series VIII:  General Subject Numbered Files, 1968-1991

4.6 cubic feet5 boxes
The General Subject Numbered files document building maintenance and renovation projects and various aspects of the daily management of campus structures including energy consumption and conservation, sewage services, custodial services, water supply, and HVAC system maintenance. The records include contracts, correspondence, and reports. Some of the files are arranged by architect or contractor and others by building. The bulk of the records are for the 1980s.
 
 
Container(s)
Description
 
box
100


G. Acker-Architect, 1985-1986
 
17020
 


Brown & Caldwell, 1981-1986
 
17020
 


Butke-Transportation, Parking Study Agreement, 1981-1987
 
17020
 


CH2M-Heating Plant Economizer, 1986
 
17020
 


James Carpenter, 1986
 
17020
   
Carson (Carson, Bekooy, Gulick, and Associates Consulting) Supplements, 1986-1988
 


Campus Water System (#1), 1986-1987
 
17020
 


BalEx, Heating Plant, Misc. (#2), 1986-1988
 
17020
 


Cordley 3097 (#3), 1987
 
17020
 


Conmar (#4), 1987
 
17020
 


Rogers Hall Air Balancing (#5), 1987
 
17020
 


Waldo (#6), 1987
 
17020
 


Weniger Lighting (#7), 1987
 
17020
 


Ocean I Rm. 426 Cooling (#9), 1987-1988
 
17020
 


Burt Rm. 424A Cooling (#10), 1987
 
17020
 


Langton Hall Shower Exhaust (#11), , 1987
 
17020
 


Nash Hall Rm. 14 Humidity/Temp. Control (12/16), 1988
 
17020
 


Moreland Hall Fume Hood (#13), 1988
 
17020
 


Burt 178 Cooling (#15), 1988
 
17020
 


Cordley Mients Facility (#18), 1988
 
17020
 


Weniger 5th Floor Cooling (#21), 1988
 
17020
 


Misc (#24), 1988
 
17020
 


Food Service Warehouse Freezer (#27), 1989
 
17020
 


Fume Hood Investigation, 1987
 
17020
 


Snell Water Piping, 1987
 
17020
 


Water Piping Replacement, 1984-1985
 
17020
 


Weniger Vacuum Pump, 1987
 
17020
 


Energy Consultant Selection, 1983-1988
 
2 folders
17020
 
101

Soderstrom Architects Payments/Supplements, 1987-1988
 
17020
 


Soderstrom Architects Correspondence, 1987
 
17020
 


Stastny Architects Handicapped Access. Payments, 1985-1988
 
17020
   
CH2M-Supplements, 1986-1988
 


LaSells Stewart Center HVAC (#4), 1986-1987
 
17020
 


HMSC Seawater Chiller (#5), 1987-1988
 
17020
 


Kidder HVAC Modifications (#8), 1987
 
17020
 


Langton Pool Roof (#11, #13), 1987-1988
 
17020
 


Poling Hall (#12), 1987
 
17020
 


Burt 383 AC Improvements (#14), 1988
 
17020
 


Food Toxicology Chiller (#15), 1988
 
17020
 


Underground Fuel Tanks, 1988
 
17020
 


Devco Engineering Payments, 1988-1989
 
17020
 


General Parking Lot-Consultants, 1988
 
17020
 


Geotechnical Resources, 1980-1984
 
17020
 


Interior Designers, General, 1987
 
17020
 


Jeppsen, Miller & Tobias-Covell Fire Escape, 1988-1989
 
17020
 


Jeppsen, Miller & Tobias-Electrical and Computer Engineering/Related Alt.Payments, 1989
 
2 folders
17020
 


Parking Garage Study, 1989
 
17020
 


TBG/Womens Building Biomech Lab, 1987-1988
 
17020
 


Contracts, Award Fee, 1987
 
17024
 


Sasaki Associates-Consultants, general, 1989
 
17027
 


Alterations to Apperson and Merryfield Hall, 1986
 
17027
 


Crew Facilities-Samard, 1986
 
17030
 


Crew Facilities-Mcallister, 1986-1987
 
17030
 


Memorial Union Building Dome Reroofing, 1986
 
17030
 


Building Manager Memo, 1984-1987
 
17030
 


Crop Science, 1985
 
17030
 


Gilmore Hall Reroof, 1985-1987
 
17030
 


Architectural services-Gill Coliseum, Project 1, 1984-1986
 
17030
 
102

Heating Plant Cogeneration Equipment Purchase CH2M-Hill Northwest, 1989
 
17030
 


Irrig. Systems Installation-Phase III, 1986-1987
 
17030
 


McNary & Wilson Halls Roof Replacement, 1986-1987
 
17030
 


Memorial Union Dome Reroof, 1986-1987
 
17030
 


Computer Science Building Alterations, 1984-1985
 
17030
 


Wiegand Hall Fume Hood Installation, 1987
 
17030
 


Administration Steam Line Cross-Over, 1984
 
17035
 


Ballard Extension Hall - Room 118, 1985-1986
 
17035
 


Benton Hall Sewer, 1984-1985
 
17035
 


Black Cultural Center, 1987
 
17035
 


Campus Waterline Replacement, 1985-1987
 
17035
 


Cordley Remodel Room 1060, 1984-1985
 
17035
 


Education Hall Recoat Exterior Wall, 1984
 
17035
 


EE Tech Ballasts Social Science, 1980-1981
 
17035
 


Farm Crops Remodel, 1983
 
17035
 


Farrier School, 1985
 
17035
 


Furnaces-Campus Maint. Agreement, 1985
 
17020
 


Gill Coliseum Lighting, 1979-1980
 
17035
 


Heating Plant Cogeneration-Bid Opening, 1989
 
17035
 


Heating Plant Emergency Generator Auto Start-up, 1983-1984
 
17035
 


Heating Plant Tank Liner, 1983
 
17035
 


Housing Emergency Sanitary Sewer Hook-up at Housing Warehouse, 1983
 
17035
 


Langton Kalwall, 1985
 
17035
 


Lasells Stewart Center Air Conditioning, 1984-1985
 
17035
 


Library Timers For Stacks, 1981-1982
 
17035
 


McAlexander Fieldhouse Recaulk, 1978-1979
 
17035
 


Memorial Union Mech. Room Asbestos Removal, 1985
 
17035
 


Memorial Union Rotunda Painting, 1985
 
17035
 


Milam Hall Automatic Door, 1983
 
17035
 


Ocean Administration Remodel, 1984-1985
 
17035
 


Oxford House Storm Drain, 1986
 
17035
 


Parker Stadium - Paint Press Box, 1985
 
17035
 


Reroof Apiary Building 176, 1985-1986
 
17035
 


Roof Entomology Research Farm, 1986
 
17035
 


Roofing-Poultry C, Printing, Storage, 1983
 
17035
 


Sewerline Proj.-Phase VII Root Control, 1987
 
17035
 


Sidewalk Project, 1986-1987
 
17035, 2 folders
 


30th & Oak Creek Drainage Ditch, 1986
 
17035
 


30th Street Mall Sculpture, 1982-1983
 
17035
 


Vet Dairy Barn Walk-in Cooler, 1985
 
17035
 


Waldo Hall Room 242, 1985
 
17035
 


Weniger Hall–Reglaze Greenhouse, 1984
 
17035
 


West Greenhouse Growth Chambers, 1983
 
17035
 


Wilkinson Raised Floor, 1984
 
17035
 
103

Wilkinson Transformer Retro-File, 1986
 
17035
 


Womens Building Pipe Insulation, 1986
 
17035
 


Womens Building Window Replacement, 1986
 
17035
 


Women’s Softball Field Fence, 1983-1984
 
17035
 


Ag. Utilities & Seed Lab Asbestos Removal, 1989
 
17037
 


Bookstore Remodel, 1989
 
17037
 


Kerr Library Computer Center, 1988
 
17037
 


Langton/Women’s Building O & M, 1985
 
17037
 


Langton/Womens Building Refinish Floors, 1986
 
17037
 


Refinish Floors for Langton and Women’s Building, 1986
 
17037
 


Misc. Sewer Projects, 1986
 
17037
 


Nash Hall - Backdraft Dampers for Fume Hoods, 1981-1983
 
17037
 


Parker Stadium Lights Computerized Operation, 1984
 
17037
 


Poultry Re-roofing, 1978
 
17037
 


Senior Class Project - Walk in Kerr - Kidder Quad, 1985
 
17037
 


Plan Reviews, Approval, 1985
 
17039
 


Minority Businesses, 1987-1988
 
17060
 


Marriott Contract Info, 1988-1989
 
18040
 


Contract Info - ABM, 1986
 
18040
 


Contract Bidding Info, 1988-89
 
18040
 


Service Contract Servicemaster, 1986
 
18040
 


SMI Contract Information, 1987-1988
 
18040
 


Contract Change Orders - Marriott, 1990
 
18041
 


Contract Change Orders ABM, 1983-1987
 
18041
 


Contract Change Orders Servicemaster, 1987
 
18041
 


Custodial Services Corres. Marriott, 1989-1990
 
2 folders
18042
 


Payment Back-up Info - Marriott, 1989-1990
 
18043
 


Custodial Services - Corres. Marriott, 1988-1989
 
18042
 


Custodial Services Correspondence - ABM, 1986
 
18042
 


Custodial Services Correspondence - Servicemaster, 1986-1987
 
2 folders
18042
 


Custodial Services - Correspondence, 1983-1985
 
3 folders
18042
 


ABM, 1985-1986
 
18043
 


Payment Back-up Information ABM, 1983-1984
 
18043
 


Payment Back-up Info Servicemaster, 1986
 
18043
 


Department of Energy, 1981-1986
 
19010
 


Energy Articles, 1986
 
19020
 


Energy General Information, 1988
 
19025
 


Energy - Misc./General, 1983-1987
 
19025
 


Heating Degree-Day Histories, 1972-1986
 
19025
 


Nacubo Awards Program, 1986
 
19040
 


Energy Audits, 1979-1985
 
19050
 


Energy Control Progress Reports, 1979
 
19050
 


Governor’s Task Force on Energy Management, 1977-1984
 
19050
 


State Energy Mgmt. Annual Report, 1985-1987
 
19050
 


Technical Ast. Reports Ocean I, II, 1981-1983
 
19050
 
104

BPA - General, 1983-1985
 
20010
 


BPA/PP&L Lighting Contract, 1983
 
20010
 


BPA Solicitation, 1981-1983
 
20010
 


Energy Conservation, General, 1983; 1988
 
2 folders
20020
 


Energy Conservation Measures, 1975-1987
 
20020
 


Cycle 4, 1983-1986
 
20030
 


Public Energy Pkg - Application Burt VAV, 1989
 
20035
 


PP&L/Brown & Caldwell, 1986
 
20035
 


Bookplan Updates, 1987
 
21045
 


Electricity Consumption, 1971-1990
 
29030
 


Misc. Electricity Correspondence, 1988
 
29030
 


Electricity Consumption, 1988
 
29030
 


Misc. Gas Correspondence, 1970-1988
 
2 folders
29040
 


Energy Conservation Projects, 1988
 
20040
 


Gas Consumption, 1968-1983
 
29040
 


Malheur Experiment Station, 1990-1991
 
9035
 


Tennis Court Renovations, 1988-1991
 
29040
 


Monthly Cost for Steam, 1977-1988
 
2 folders
29090
 


Water Meter Exemption Readings, 1988
 
29110
 


Monthly Reports, 1982-1984
 
31040
 


Dorms and Cafeterias - Hartman Payments, 1981-1983
 
31040
 


Contract-Honeywell for orig. EMS, 1981-1984
 
31040
 


Wide Carriage Printer, 1978
 
19050
 


EMS Correspondence, 1986
 
31065
 


Fixed Equipment Review, 1987
 
32017
 


Mobile Equipment, 1986
 
32050
 


Pumps/Air Compressors, 1984
 
32080
 


Refrigeration, 1985
 
32090
 


Backflow Preventors, 1985-1986
 
33010
 


Irrigation, 1986
 
33010
 


Monthly Maintenance Letters, 1989
 
33015
 


Summer, 1981
 
33017
 


Public Improvement Projects, 1988
 
33035
 


Preventative Maintenance General Information, 1985-1990
 
33040
 


Backflow Preventor Listing, 1985-1988
 
35020
 


Backflow Prevention Testing, 1984-1987
 
35020
 


Backflow Preventors, 1974-1980
 
35020

 

Series IX:  Committee Records, 1966-2003

0.6 cubic foot2 boxes
Series IX consists predominantly of materials pertaining to the University Safety Committee, the Oregon State Board of Higher Education Building Committee, and the Campus Planning Committee as well as committee records pertaining to the campus master plan and re-engineering. The records include meeting minutes, reports, correspondence, and related documentation. See also Series V, Facilities Planning and Use Committee Records.
 
 
Container(s)
Description
 
box
91


Facilities Planning Committee – Proposal for Humanities and Social Science and Fine Art Complex, 1966
 


University Safety Committee, 1970-1989
 
3 folders
 


Building Committee (Oregon State Board of Higher Education), 1955-1968
 
9 folders
 
131

Campus Planning Committee, 2001-2003
 


Master Plan, 2002
 


Re-Engineeering, 2001-2003

 

Series X:  Correspondence, 1888-2003

2 cubic feet5 boxes
The correspondence documents various policies, procedures, and activities of Facilities Services. The series consists primarily of the Gordon Skelton correspondence for 1908-1938 and correspondence from the 1960s pertaining to campus planning, policies, and procedures.
 
 
Container(s)
Description
 
box
91


Water Tower, 1888-1889
 


Capital Repairs and Rehabilitation, 1951
 


Annual Summaries of Occupational Injuries and Illnesses for 1997 thru 1999, 1998-2000
 


OSU Building Addresses, 2003
 


Separate Bids Chicago Plan (Reference from University of Illinois), 1964
 


Procedure Directions for Contract Matters, 1965-1969
 


Procedure Directions for Contract Matters Where Grant Funds Involved, 1968
 


Manual of Instructions Grant Applications Title II, 1967-1968
 


Labor Unions, 1961-1962
 


Cost Comparisons: Physical Plant and Contractor’s Costs, 1965
 


Associated General Contractors Meeting, 1966
 


Equal Employment Opportunity Compliance Reports, 1963-1965
 


U.S. Office of Education Grant Funds Contract Procedures, 1965-1969
 


Legislative Actions in 1971 Affecting Public Contracting, 1971
 


Facility Projection Reports, 1970
 


Dormitory Construction Costs Comparative Analysis from 1957 thru 1966, 1966
 


Capital Outlay, 1962-1969
 
3 folders
   
Gordon V. Skelton, 1908-1938
 
The Skelton correspondence consists of materials documenting Skelton's oversight of campus buildings, especially fire protection; roads; and walkways in his role as the campus Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection. Of special note is correspondence with architect John Bennes. The correspondence also includes materials pertaining to his role as chair of the Civil Engineering Department.
 
105

Fire Protection, 1908-1935
 
13 folders
 


Accident Commission, 1919-1927
 


Board of Education and General Administration, 1933-1935
 


Business Office, 1920-1933
 
2 folders
 


Chamber of Commerce, 1915-1916
 


College Buildings and Property (and letters to Mr. Bennes relating to same),, 1911-1927
 


Dean Covell’s Office, 1909-1927
 


Dean’s Office, 1933-1934
 


Dietzgen and Co., 1916-1926
 


General Highway and Civil Engineering, 1908-1919
 


Graduate Committee, 1933-1935
 


Highway Department, 1926-1933
 


Highway Research Board, 1921-1934
 


Highway Research, 1934-1935
 


Library, 1928-1934
 


Memorial Union, 1931-1934
 


Peavy – Dolan Controversy, 1913-1917
 


Portland (Ore.) Bridge Reports by J.P. Newell, 1923
 


Registrar’s Office, 1929-1935
 


Roads,, 1916-1925
 


Surveys and Lands, 1909-1915
 


University of Oregon, 1933-1935
 


Walks and Improvements Constructed, 1910-1912
 


Miscellaneous, 1909-1921
 
2 folders
 
94

General, 1908-1938
 
3 folders
 
88

Project Details Forms – Capital Construction, 1961-1969
 
2 folders
 


Priority List Capital Construction Proposed, 1961-1966
 
2 folders
 


Building Program Directives, 1967-1969
 


Senate Bills 142 and 143, 1965
 


Senate Bill 428, 1967
 


Long Range Planning, 1940-1970
 
3 folders
 


Early Planning of Buildings, 1940-1964
 
2 folders
 


Value of Land and Buildings, 1959-1967
 


Construction Survey Forms Questionnaire, 1959-1961
 


Air Conditioning Policy, 1962-1967
 


Major Rehabilitation Program, 1960
 


Removal of Obsolete or Temporary Space, 1960
 


Building Codes, 1938-1941
 
131

Facilities Services 2002-2003 Budget, 2002
 


Move of Transportation Services and Parking to Adams Hall, 2003

 

Series XI:  Land Ownership and Property, 1940-1951

0.1 cubic foot1 box
 
 
Container(s)
Description
 
box
88


Land Records, 1940-1951
 
Copies of land records (from County Assessor?) for Oregon State College property acquired between 1940 and 1951 and a compilation of information about earlier land acquisitions.

 

Series XII:  Policies and Procedures, 1986-1994

0.01 cubic foot1 box
The Policies and Procedures include a small number of documents pertaining to environmental health and safey and disaster planning.
 
 
Container(s)
Description
 
box
88


Environmental Health and Safety Hazard Communication Program – Supervisor Outline, 1986
 


Safety Training, 1994
 


CFC Phase-Out, circa 1994
 


Disaster Management Plan, 1990
 


Fire Marshall Policy on Electrical Appliances, 1992

 

Series XIII:  Publications, 1989-2001

0.1 cubic foot1 box
The Publications consist of newsletters, guides, and handbooks. The newsletters include both internal newsletters for Facilities Services staff and external newsletters for the OSU campus community. The newsletters include staff and department news items as well as information about new building construction and remodeling projects.
 
 
Container(s)
Description
 
box
88


Newsletter, 1989-2001
 
3 folders
Facilities Bulletin; Facilities Services Bulletin; Facilities Link; and Our News
 


Physical Plant Service Guide for 1989/90, 1989
 


Working Safely with Hazardous Substances – A Handbook for Employees, circa 1989-1992

 

Series XIV:  Space Use, 1960-1969

0.6 cubic foot2 boxes, including 1 oversize box
Series XIV consists of materials pertaining to space use on the Oregon State University campus in the 1960s and includes data on square footage of usable space and use as well as reports and correspondence.
 
 
Container(s)
Description
 
box
88


Space Utilization Report, 1966
 


Comparison of Classroom and Laboratory Occupancy – Fall Terms 1965 and 1966, 1967
 


Institutional Analysis (Space), 1967
 


Utilization of Classrooms and Laboratories for Fall Term 1967, 1968
 


Analysis of Non-Residential Space by Principal Use, 1968
 


Space Standards, 1968
 


Square Feet of Buildings and Assigned Areas, 1968-1969
 
109

Use-Function Tabulation Sheets, 1960-1964
 
apx 23x31 in.
Unbound set of about 115 ledger sheets documenting the use and function of campus building space broken down by room. In addition to recording room function (e.g. office, classroom, laboratory, or conference room) and use (e.g. graduate/undergraduate instruction, public service, or staff accommodation), the ledger entries give net usable space, room capacity, and department jurisdiction. An alphabetical index in included as well as a three-page summary of department space use for 1964.

 
 
box
71



Series XV:  Staff Meeting Minutes, 1992-2001

0.8 cubic foot1 box
The Staff Meeting Minutes include reports of weekly department heads meetings and less-frequent all staff meetings. They provide detailed information and updates on major consruction projects as well as minor modifications that are underway and on the general administration and functioning of Facilities Services.

 

Series XVI:  Time Records, 1913-1939

0.3 cubic foot1 box
The time books are for laborers who worked on walkways, roads, sewers, ditches, and other projects on campus. Much of the work was supervised by Gordon V. Skelton, Professor of Highway Engineering and Superintendent of Surveys, Maps, Roads and Walks, and Fire Protection.
 
 
Container(s)
Description
   
Time Books, 1913-1939
 
box
88


1913-1919
 


1923-1929
 


1933-1939
 


Time Certificates, 1936-1937

 

Series XVII:  Renderings (Drawings) of Campus Buildings, 1949-1975

2 cubic feet1 oversize box and 7 map folders
These architectural renderings depict the settings of proposed campus buildings; they were typically prepared during the design process for a structure. Some of the renderings are in color.
 
 
Container(s)
Description
 
box
*


976-76-19a:   Agriculture Science I, undated
   
Cordley Hall, 1954
 
110

P199:03:   Agricultural and Biological Science Building, undated
 


P199:04:   Agricultural and Biological Science Building, undated
 
*

987-76-11a:   First Addition and Second Addition to Cordley Hall, undated
 


987-76-04:   Agricultural and Biological Science Building, 1954
   
Great Hall, 1975
 


987-76-01:   
 


unnumbered:   1975
 
110

Kerr Administration Building, Administration Building, 1968
 
*

987-76-05:   Magruder Hall, undated
 


987-76-10:   Marine Science Center (Hatfield), Lab and Library Additions, undated
 
110

P199:09:   Milam Hall, Addition to Home Economics Building, 1950
 
*

987-76-16:   Milne Computer Center, undated
 


987-76-07:   Nash Hall, undated
 
110

987-76-07:   Oregon State Stadium (Reser Stadium), 1952
   
Sackett Hall, undated
 


P199:05:   
 


P199:06:   
 
*

987-76-18:   Student Housing - Arnold Hall Cafeteria, undated
   
Student Housing - Bloss Hall, undated
 


987-43-12:   
 


987-43-13:   Preliminary Study of Residence Hall Unit "1" of Complex "A", South Residence Hall Group
 


P199:11:   Student Housing - West Hall, Dormitory Unit 5 and Cafeteria, 1959
 
110

P199:02:   Weatherford Hall, Men's Dormitory and Cafeteria Building, 1955
   
Weniger Hall, 1955-1957
 


P199:07:   Physics Chemistry Building, 1955
 


P199:08:   Physics Chemistry Building, undated
 
*

987-76-17:   Physics Chemistry Building, 1957
 
110

P199:01:   Wiegand Hall, Food Technology Building, 1949
   
Wilkinson Hall, undated
 


Earth Sciences Addition
 
*

987-76-02:   Earth Sciences Addition (color)
 


987-76-06:   Earth Sciences Addition (line drawing)
 
110

P199:10:   Withycombe Hall, Animal Industries, undated

 

Series XVIII:  Book Plans, 1960-1993

1.5 cubic feet3 oversize boxes
Book plans are floor plans for campus buildings and structures that provide information on general layout, square footage, and room use for classrooms, research and teaching laboratories, offices, and storage areas.
 
 
Container(s)
Description
 
box
109


1960-1993
 
450 plans in 6 folders
 
114-115

circa 1970-1989
 
550 plans in 2 volumes

 

Series XIX:  Lighting (Interior) Study, circa early-mid 1980s

1 cubic foot, including 230 sheets2 oversize boxes
Floor plans of most campus buildings annotated with the locations of fluorescent and incandescent fixtures, the number of watts or tubes, and which fixtures have been partially or completely disconnected.
 
 
Container(s)
Description
 
box
113


All buildings (except Merryfield Annex and Hall and Weniger and Withycombe Halls)
 
2 folders
 
109

Merryfield Annex and Hall; Weniger and Withycombe Halls

 

Series XX:  Campus, Farm, and Property Maps, 1899-1990

2 cubic feet1 oversize box, 1 roll storage box, and 5 map folders
The Campus, Farm and Property Maps include maps of existing structures, plans for campus development, campus boundaries, property ownership, and maps of Corvallis, Oregon. The maps are listed in chronological order.
 
 
Container(s)
Description
 

*


Map of the College Farm and Campus, 1899
 
Scale 1"=132'; incomplete draft.
 

*


Map of the College Farm and Campus, circa 1908
 
Scale 1"=132'; colored.
 

*


General Plan Grounds and Buildings Oregon Agricultural College, 1910
 
3 sheets
Scale 1"=100'. After a report by Olmsted Brothers; Arthur L. Peck; photocopies.
 

*


General Plan Grounds and Buildings Oregon Agricultural College, 1910
 
2 sheets
Scale 1"=100'. Known as Olmsted Plan; includes detailed explanatory note from G.V. Skelton.
   
Campus and Farm Maps, 1914-1921
 
10 sheets
Prepared by Gordon V. Skelton at scale of 1"=50'; show topography, building locations, streets and walks, property lines and ownership, sewer and other utility lines, drain tiles, and trees and shrubbery.
   
Campus Maps
 
box
*


1-A:   Lower Campus, 1914 and March 1920
 


2-A:   Library Quadrangle, July 1914 and March 1921
 


2 1/2-A:   Buildings on Monroe Avenue including the Mechanic Arts Building (now Merryfield Hall) and the Engineering Laboratory (now Graf Hall), Dec. 1920
 


3-A:   South of Jefferson including the Armory (now McAlexander Fieldhouse), Bell Field, and Waldo Hall, July 1914 and March 1920
 


4-A:   Memorial Union Quadrangle west to Dairy Barns (Agricultural Utilities Building), July 1914 and March 1921
 


5-A:   North of Campus Way, July 1914 and March 1921
   
Farm Maps, July 1914
 


6-B:   Poultry Buildings and Poling Hall
 


7-B:   Includes Women's Dormitory (now Ballard Extension Hall) and Cauthorn (now Fairbanks) Hall and west to barns
 


8:   North of railroad tracks
 


9:   Includes Hog Barn and Artillery Barn
 

*


Road and Walk Improvements at OAC Barns, 1918
 
Scale 1"=50'.
 

*


Campus and Farm, 1921
 
Scale 1"=200'.
 

*


Campus Plan, 1928
 
Scale 1"=100'. Showing the A.D. Taylor Plan, dated March 1926, of future development superimposed upon present plan of campus.
 
box
116


Armory Heat Plant, 1931
 
Scale 1"=20'. Prepared by G.V. Skelton; shows tunnels and existing utilities from railroad to playhouse; 15.5 x 80 inches.
 

*


South Farm, 1933
 
Scale 1"=100'.
 

*


Campus Plan, circa 1940
 

*


Madison Street Entrance, 1941
 
Scale 1"=10'.
 

*


General Study of Campus and Adjacent Area by A.D. Taylor, 1944
 
Scale 1"=200'. Proposed schedule for construction of buildings.
 

*


Oregon State College Map of Corvallis and Surrounding Territory by A.D. Taylor, 1945
 
Scale 1"=500'.
 

*


Land Acquisition Map Showing Recommended Order of Purchase, 1947
 
4 sheets
Scale 1"=400'; includes land valuations.
 

*


Preliminary Study of Collegiate Athletics Area, 1947
 
Scale 1"=100'.
 
box
109


Campus Boundary and Property Owned, 1949-1961
 
9 sheets
Scale 1"=300'. Includes maps for 1949, 1950, 1953, 1955, 1957 (2 sheets), and 1961 (2 sheets).
 

*


Corvallis, Oregon, 1950
 
Scale 1"=400'; includes one duplicate.
 
box
109


Study for the Development of Lower Campus at Oregon State College, 1952
 
Scale 1"=50'. Includes proposed future living units for OSC students and faculty between Monroe and Jefferson and 9th and 11th Streets.
 

*


Property Map - Benton Linn, and Polk Counties, 1953
 
Scale 1"=40 chains.
 

*


Relocation of Philomath Road, 1959
 
3 sheets
Shows property ownership along south margin of campus.
 

*


Campus Boundary and Property Owned, 1963-1968
 
3 sheets
Scale 1"=300'. Includes maps for 1963, 1966, and 1968.
 
box
109


Long Range Development Plan, 1964
 
Scale 1"=400'; photographic print.
 


South Residence Hall Group, 1964
 
2 sheets
Scale 1"=120'; photographic prints.
 


Campus Property Owned - West Campus Area, 1968
 
Scale 1"=300'; from 35th to 43rd Streets and Harrison Blvd. to Washington Way.
 

*


Long Range Development Plan, 1964
 
Scale 1"=200'.
 

*


Property Map - Benton, Linn, and Polk Counties, 1969
 
Scale 1"=40 chains.
 

*


Campus Map, circa 1975
 
Original drawing, ink on mylar.
 

*


Physical Development Plan, 1976
 
Scale 0.75"=200'; includes two duplicates.
 
box
109


City of Corvallis Future Land Use Map, 1978
 
Scale 0.75"=1600'.
 

*


Existing Campus Plan, 1989
 
Scale 1"=200'.
 

*


Campus Map, circa 1990
 
Scale 1"=200'.
 

*


West Campus, undated
 
2 sheets
Scale 1"=100'; from 35th Street to west and Washington Way to Jackson Street; shows elevation contours, roads, and structures.

 

Series XXI:  Aerial Photographs, 1952-1979

2 cubic feet, including 8 photographs2 roll storage containers, 5 map folders, and one wall-mounted item
Series XXI consist of aerial photographs of the OSU campus and vicinity and Corvallis, Oregon. They are listed below in chronological order.
 
 
Container(s)
Description
 

*


987-76-31:   Oblique aerial view of Oregon State College campus, August 6, 1952
 
21x32 inches
Photograph by Western Ways.
 

*


987-76-32:   Lower campus and Corvallis residential area, circa 1955
 
45x45 inches
From about 9th to 17th Streets and Jefferson south to A street. Photograph by Western Ways.
 

*


987-76-29:   OSU campus and Corvallis, May 13, 1963
 
3 prints; 34x36 inches and 25x29 inches (2 prints)
Scale 1 in. = 200 feet. Covers 11th-35th Streets (E-to-W) and Western to Tyler Avenues (S-to-N). Photograph by Western Ways. Three prints mounted on wood laminate.
 

*


987-76-30:   OSU campus, 1968
 
20x33 inches
Tinted oblique aerial photograph of OSU campus; mounted on wood laminate. Photograph by Photo-Art Commercial Studios.
 
box
117


987-76-34:   OSU campus and vicinity, 1972
 
41 inches wide; unknown length
Photograph by H.G. Chickering.
 

*


P199:13; 987-76-34:   Corvallis and OSU campus, 1975
 
43x96 inches
View extends from Willamette River on east to 53rd Street on west and from approximately Buchanan Avenue on the north to Hwy. 20 on the south.
 
box
118


987-76-35:   OSU campus and vicinity, 1979
 
55 inches wide; unknown length
Scale 1 in = 200 feet; color print.
 

*


987-76-33:   Farm area, undated
 
45x52 inches
Photograph by Western Ways.

 
 

*



Series XXII:  Photographs, 1963

0.2 cubic feet, including 3 photographs1 map folder
Series XXII consists of photographs of 3-dimensional architectural models of the Yaquina Bay Marine Sciences Laboratories and the Marine Science Center.